Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
3:26 AM 04/02/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
2:05 PM 04/03/2023 |
Active |
At the request of QTHT |
|
12:01 AM 09/09/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
12:16 AM 09/10/2023 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors MK GROUP COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 28 bidding packages, of which 24 were won, 1 were lost, 3 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 74.62% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 5.46% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (14), An Giang (11), Đắk Lắk (2), Undefined (1)
- Provinces before the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (10), Kiên Giang (9), Đắk Lắk (2), Undefined (7)
- Has relationships with 11 Bid Solicitors
- Has competed against 232 contractors in 14 bidding packages, won 10 packages, lost 1 packages, 3 are pending results, and 0 were canceled.
- Has collaborated with 3 contractors in 2 bidding packages, won 2 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 15 | 62.5% |
| Lower by 10% to 20% | 1 | 4.2% |
| Lower by 5% to 10% | 0 | 0% |
| Lower by 1% to 5% | 1 | 4.2% |
| Lower by 0% to 1% | 3 | 12.5% |
| 0% | 4 | 16.7% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 24 | 100% |
MK GROUP COMPANY LIMITED join for the Tender package No 1: Procurement of medical equipment with funding from Kien Giang Lottery Company Limited package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
06/01/2026 15:02
MK GROUP COMPANY LIMITED join for the Shopping for medical equipment in 2025 package, which was invited for bidding by the through an Open bidding as an independent entity. Twenty three other contractors also participated.
05/01/2026 09:44
MK GROUP COMPANY LIMITED Won the bidding for the Purchase additional medical equipment from lottery sponsorship package, which was invited for bidding by the Bệnh viện Đa khoa Kiên Giang through an Open bidding as an independent entity. Ten other contractors also participated.
- Result: Won
31/12/2025 15:54
MK GROUP COMPANY LIMITED join for the HC-03: Procurement of dialysis chemicals in 2026-2027 package, which was invited for bidding by the through an Competitive Offer as an independent entity.
29/12/2025 10:36
MK GROUP COMPANY LIMITED join for the Purchase additional medical equipment from lottery sponsorship package, which was invited for bidding by the Kiên Giang General Hospital through an Open bidding as an independent entity. Ten other contractors also participated.
- Result: Tender opening completed
19/11/2025 15:01
MK GROUP COMPANY LIMITED Won the bidding for the Procurement of dialysis chemicals to serve the professional work of department A14 package, which was invited for bidding by the BỆNH VIỆN QUÂN Y 7A through an assign shorthand as an independent entity.
- Result: Won
14/11/2025 15:28
MK GROUP COMPANY LIMITED Won the bidding for the Procurement of medical supplies used in kidney dialysis to serve professional work at 7A Military Hospital package, which was invited for bidding by the BỆNH VIỆN QUÂN Y 7A through an assign shorthand as an independent entity.
- Result: Won
24/10/2025 15:32
MK GROUP COMPANY LIMITED Won the bidding for the Shopping for medical supplies package 1 used at Kien Giang Oncology Hospital for 2025-2026 (24 months) package, which was invited for bidding by the BỆNH VIỆN UNG BƯỚU KIÊN GIANG through an Open bidding as an independent entity. Seventeen other contractors also participated.
- Result: Won
29/08/2025 18:25
MK GROUP COMPANY LIMITED Won the bidding for the Equipped with artificial kidney machine package, which was invited for bidding by the BỆNH VIỆN ĐA KHOA BƯU ĐIỆN through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
28/07/2025 07:53
MK GROUP COMPANY LIMITED join for the Shopping for medical supplies package 1 used at Kien Giang Oncology Hospital for 2025-2026 (24 months) package, which was invited for bidding by the BỆNH VIỆN UNG BƯỚU KIÊN GIANG through an Open bidding as an independent entity. Seventeen other contractors also participated.
- Result: Tender opening completed
24/07/2025 15:13
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder MK GROUP COMPANY LIMITED participated in 28 package, of which 24 package was won, failed 1 packages, 3 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor MK GROUP COMPANY LIMITED is related to 11 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor MK GROUP COMPANY LIMITED competed with 232 contractors in 14 package, won 10 package, lost 1 package, 3 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor MK GROUP COMPANY LIMITED once entered into a partnership with 3 contractors in 2 package, won bid 2 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor MK GROUP COMPANY LIMITED participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor MK GROUP COMPANY LIMITED participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor