Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
8:19 AM 04/02/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
2:04 PM 04/05/2023 |
Active |
At the request of QTHT |
|
12:05 AM 09/03/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
1:34 AM 09/03/2024 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors NAM CHI CONSTRUCTION CONSULTING COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 199 bidding packages, of which 184 were won, 11 were lost, 0 are pending results, and 4 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 11.47% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 91.71% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Cần Thơ (3), Tây Ninh (3), TP.Hồ Chí Minh (135), Vĩnh Long (2), Cà Mau (2), An Giang (2), Khánh Hòa (1), Đồng Nai (1), Đà Nẵng (1), Undefined (49)
- Provinces before the merger where the contractor has participated in bidding : Sóc Trăng (2), Long An (1), TP.Hồ Chí Minh (112), Vĩnh Long (1), Trà Vinh (1), Bạc Liêu (1), Cà Mau (1), An Giang (1), Ninh Thuận (1), Bình Phước (1), Tây Ninh (2), Undefined (75)
- Has relationships with 41 Bid Solicitors
- Has relationships with 43 Bid Investors
- Has competed against 29 contractors in 191 bidding packages, won 176 packages, lost 11 packages, 0 are pending results, and 4 were canceled.
- Has collaborated with 11 contractors in 8 bidding packages, won 8 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 112 bidding packages with 16 roles.
- Building organization name: CÔNG TY TNHH TƯ VẤN XÂY DỰNG NAM CHÍ
- Construction capacity certificate code: 00016287
- Issuing Authority: Phòng Đăng ký Kinh doanh - Sở Kế hoạch và Đầu tư Thành phố Hồ Chí Minh
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng Kiến trúc; kết cấu; điện; cấp, thoát nước
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông Cầu, đường bộ
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Công nghiệp Đường dây và Trạm biến áp
⚬ Quản lý dự án đầu tư xây dựng: Dân dụng
⚬ Quản lý dự án đầu tư xây dựng: Hạ tầng kỹ thuật Cấp - thoát nước; hệ thống chiếu sáng; Công viên - cây xanh
⚬ Lập quy hoạch xây dựng:
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: Giao thông Cầu, đường bộ
⚬ Giám sát thi công xây dựng công trình: Giao thông Cảng, đường thủy
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông Cảng, đường thủy
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Nông nghiệp và Phát triển nông thôn Thủy lợi
⚬ Giám sát thi công xây dựng công trình: Giao thông Cảng, đường thủy
⚬ Giám sát thi công xây dựng công trình: Nông nghiệp và Phát triển nông thôn Thủy lợi
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật Cấp, thoát nước; công viên, cây xanh; hệ thống chiếu sáng
⚬ Quản lý dự án đầu tư xây dựng: Công nghiệp
⚬ Giám sát thi công xây dựng công trình: Dân dụng và Công nghiệp
⚬ Khảo sát xây dựng: Khảo sát địa hình
⚬ Khảo sát xây dựng: Khảo sát địa chất
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, Thẩm tra thiết kế kết cấu công trình: thủy lợi
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông đường bộ
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, Thẩm tra thiết kế xây dựng công trình hạ tầng kỹ thuật thoát nước
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, Thẩm tra thiết kế điện công trình chiếu sáng công cộng
⚬ Thi công xây dựng công trình: Giao thông đường bộ
⚬ Thi công xây dựng công trình: Thi công lắp đặt thiết bị điện công trình chiếu sáng công cộng
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 10 | 0% |
| Lower by 10% to 20% | 5 | 0% |
| Lower by 5% to 10% | 30 | 0% |
| Lower by 1% to 5% | 87 | 0% |
| Lower by 0% to 1% | 20 | 0% |
| 0% | 31 | 0% |
| Higher by 0% to 1% | 0 | |
| Higher by 1% to 5% | 0 | |
| Higher by 5% to 10% | 1 | 0% |
| Higher by 10% or more | 0 | |
| Unknown | 0 | |
| Total | 184 | 100% |
NAM CHI CONSTRUCTION CONSULTING COMPANY LIMITED Won the bidding for the Consultantcy on surveying, preparing finance and technical reports package, which was invited for bidding by the Trung tâm Quản lý Giao thông và Hạ tầng kỹ thuật Thành phố Hồ Chí Minh through an as an independent entity.
- Result: Won
04/09/2026 15:11
NAM CHI CONSTRUCTION CONSULTING COMPANY LIMITED Won the bidding for the TV-02: Monitoring construction site surveys package, which was invited for bidding by the Văn phòng Hội đồng nhân dân và Ủy ban nhân dân phường Chợ Lớn through an as an independent entity.
- Result: Won
03/09/2026 07:30
NAM CHI CONSTRUCTION CONSULTING COMPANY LIMITED Won the bidding for the Consultancy on construction survey and preparation of economic and technical reports package, which was invited for bidding by the Trung tâm Quản lý điều hành giao thông đô thị through an as an independent entity.
- Result: Won
28/08/2026 16:47
NAM CHI CONSTRUCTION CONSULTING COMPANY LIMITED Won the bidding for the Consultation on defining project scope and preparing standard investment preparation cost estimates as part of feasibility study report development. package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình giao thông through an as an independent entity.
- Result: Won
07/08/2026 09:46
NAM CHI CONSTRUCTION CONSULTING COMPANY LIMITED Won the bidding for the Survey Consulting; Prepare technical and economic reports package, which was invited for bidding by the Ban Quản lý dự án phường Bình Minh through an as an independent entity.
- Result: Won
28/07/2026 08:16
NAM CHI CONSTRUCTION CONSULTING COMPANY LIMITED Won the bidding for the Consulting on making report on investment policy proposal package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình giao thông through an as an independent entity.
- Result: Won
21/07/2026 14:36
NAM CHI CONSTRUCTION CONSULTING COMPANY LIMITED Won the bidding for the Consulting on making tasks and cost estimates for investment preparation for making feasibility research reports package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình giao thông through an as an independent entity.
- Result: Won
10/07/2026 14:47
NAM CHI CONSTRUCTION CONSULTING COMPANY LIMITED Won the bidding for the Consulting, surveying, preparing economic reports package, which was invited for bidding by the Sở Nông nghiệp và Môi trường tỉnh Tây Ninh through an as an independent entity.
- Result: Won
10/07/2026 09:28
NAM CHI CONSTRUCTION CONSULTING COMPANY LIMITED Won the bidding for the Consulting and supervision of construction survey work package, which was invited for bidding by the Trung tâm Quản lý Giao thông và Hạ tầng kỹ thuật Thành phố Hồ Chí Minh through an as an independent entity.
- Result: Won
08/07/2026 17:02
NAM CHI CONSTRUCTION CONSULTING COMPANY LIMITED Won the bidding for the Consulting on making tasks and cost estimates for investment preparation for making feasibility research reports package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình giao thông through an as an independent entity.
- Result: Won
03/07/2026 09:31
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder NAM CHI CONSTRUCTION CONSULTING COMPANY LIMITED participated in 199 package, of which 184 package was won, failed 11 packages, 0 packages with no results, 4 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NAM CHI CONSTRUCTION CONSULTING COMPANY LIMITED is related to 41 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NAM CHI CONSTRUCTION CONSULTING COMPANY LIMITED has a relationship with 51 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NAM CHI CONSTRUCTION CONSULTING COMPANY LIMITED competed with 29 contractors in 191 package, won 176 package, lost 11 package, 0 bidding package has no results, 4 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor NAM CHI CONSTRUCTION CONSULTING COMPANY LIMITED once entered into a partnership with 11 contractors in 8 package, won bid 8 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor NAM CHI CONSTRUCTION CONSULTING COMPANY LIMITED participated in bidding in 9 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NAM CHI CONSTRUCTION CONSULTING COMPANY LIMITED participated in bidding in 11 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,243 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor