Data analysis results of DauThau.info software for contractors NORTH TECHNOLOGY AND CONSTRUCTION JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 199 bidding packages, of which 67 were won, 120 were lost, 5 are pending results, and 7 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 56.11% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 90.05% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Sơn La (27), Lâm Đồng (23), Lai Châu (21), Hải Phòng (17), Quảng Ninh (13), Vĩnh Long (12), Đắk Lắk (11), Đà Nẵng (7), Đồng Nai (6), Gia Lai (5), Thanh Hoá (5), Cà Mau (5), Ninh Bình (4), Phú Thọ (3), Hà Nội (2), Hà Tĩnh (2), Nghệ An (2), Tây Ninh (1), TP.Hồ Chí Minh (1), Huế (1), Quảng Ngãi (1), Undefined (31)
- Provinces before the merger where the contractor has participated in bidding : Sơn La (27), Lai Châu (21), Hải Dương (15), Quảng Ninh (13), Lâm Đồng (12), Trà Vinh (11), Quảng Nam (7), Phú Yên (7), Đắk Nông (6), Bình Thuận (6), Đồng Nai (6), Gia Lai (5), Thanh Hoá (5), Hòa Bình (3), Đắk Lắk (3), Hà Nội (2), Hà Tĩnh (2), Ninh Bình (2), Nghệ An (2), Long An (1), Bà Rịa - Vũng Tàu (1), Huế (1), Cà Mau (1), Kon Tum (1), Undefined (45)
- Has relationships with 60 Bid Solicitors
- Has competed against 150 contractors in 177 bidding packages, won 44 packages, lost 117 packages, 9 are pending results, and 7 were canceled.
- Has collaborated with 7 contractors in 30 bidding packages, won 9 packages, lost 19 packages, 1 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Building organization name: CÔNG TY CỔ PHẦN CÔNG NGHỆ VÀ XÂY DỰNG PHƯƠNG BẮC
- Construction capacity certificate code: 00039967
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Hà Nội
- Field:
⚬ Khảo sát xây dựng: Khảo sát địa hình.
⚬ Thi công xây dựng công trình: Thi công xây dựng công trình: dân dụng; công nghiệp (thủy điện, nhà máy nhiệt điện); hạ tầng kỹ thuật (trừ công trình xử lý chất thải rắn).
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 12 | 17.9% |
| Lower by 10% to 20% | 17 | 25.4% |
| Lower by 5% to 10% | 12 | 17.9% |
| Lower by 1% to 5% | 16 | 23.9% |
| Lower by 0% to 1% | 10 | 14.9% |
| 0% | 0 | 0% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 67 | 100% |
NORTH TECHNOLOGY AND CONSTRUCTION JOINT STOCK COMPANY join for the Overhaul the bridge and inspect the bridge crane rails after repair package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
26/12/2025 09:05
NORTH TECHNOLOGY AND CONSTRUCTION JOINT STOCK COMPANY join for the Bidding package 04.SCL2026 - Repair and maintenance of H2 NMT Tunnel. Srepok 3 package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
18/12/2025 14:36
NORTH TECHNOLOGY AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Overhaul of coal warehouses (closed coal warehouse) Chain 1 - Major repair plan in 2025 Pha Lai Thermal Power Joint Stock Company package, which was invited for bidding by the Công ty cổ phần Nhiệt điện Phả Lại through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
17/12/2025 20:32
NORTH TECHNOLOGY AND CONSTRUCTION JOINT STOCK COMPANY lost the bidding for the Major repair and treatment of cracks at the launch nose of overflow chambers No. 2, 3, 4 of Ban Chat hydropower project in 2026 package, which was invited for bidding by the EVN HPC HQBC through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
10/12/2025 11:34
NORTH TECHNOLOGY AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Support anti -corrosion paint supports the pipeline area of the oven to recover the heat of Ca Mau Power Plant 2 package, which was invited for bidding by the PETRO VIETNAM CAMAU POWER COMPANY through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
03/12/2025 14:53
NORTH TECHNOLOGY AND CONSTRUCTION JOINT STOCK COMPANY lost the bidding for the Regular repairs – Phase 2 in 2025 package, which was invited for bidding by the PETRO VIETNAM CAMAU POWER COMPANY through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Lost
01/12/2025 13:25
NORTH TECHNOLOGY AND CONSTRUCTION JOINT STOCK COMPANY join for the 59MSHHH-SXKD-2025: Providing supplies and services for installing buffer buffer against the wharf No. 01 of the Coastal Power Center Port package, which was invited for bidding by the DUYEN HAI THERMAL POWER COMPANY through an Open bidding as an independent entity. Eleven other contractors also participated.
28/11/2025 14:02
NORTH TECHNOLOGY AND CONSTRUCTION JOINT STOCK COMPANY join for the Major repair and treatment of cracks at the launch nose of overflow chambers No. 2, 3, 4 of Ban Chat hydropower project in 2026 package, which was invited for bidding by the EVN HPC HQBC through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
24/11/2025 10:27
NORTH TECHNOLOGY AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Regular repair - phase 1 in 2025 package, which was invited for bidding by the PETRO VIETNAM CAMAU POWER COMPANY through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Won
17/11/2025 10:14
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder NORTH TECHNOLOGY AND CONSTRUCTION JOINT STOCK COMPANY participated in 199 package, of which 67 package was won, failed 120 packages, 5 packages with no results, 7 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NORTH TECHNOLOGY AND CONSTRUCTION JOINT STOCK COMPANY is related to 60 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NORTH TECHNOLOGY AND CONSTRUCTION JOINT STOCK COMPANY competed with 150 contractors in 177 package, won 44 package, lost 117 package, 9 bidding package has no results, 7 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor NORTH TECHNOLOGY AND CONSTRUCTION JOINT STOCK COMPANY once entered into a partnership with 7 contractors in 30 package, won bid 9 package, lost 19 package, 1 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor NORTH TECHNOLOGY AND CONSTRUCTION JOINT STOCK COMPANY participated in bidding in 21 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NORTH TECHNOLOGY AND CONSTRUCTION JOINT STOCK COMPANY participated in bidding in 24 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor