Data analysis results of DauThau.info software for contractors NOVA SOLUTIONS AND TECHNOLOGIES JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 375 bidding packages, of which 174 were won, 166 were lost, 17 are pending results, and 18 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 24.96% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 92.98% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (161), TP.Hồ Chí Minh (55), Đà Nẵng (33), Sơn La (24), Khánh Hòa (23), Phú Thọ (13), Gia Lai (12), Lâm Đồng (9), Đắk Lắk (6), Quảng Ninh (6), Hà Tĩnh (5), Huế (5), Hưng Yên (5), Đồng Nai (4), Hải Phòng (4), Ninh Bình (4), Thanh Hoá (4), Lai Châu (3), Nghệ An (3), Quảng Trị (3), Quảng Ngãi (3), Nationwide (3), Lào Cai (2), An Giang (1), Vĩnh Long (1), Đồng Tháp (1), Bắc Ninh (1), Undefined (42)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (161), TP.Hồ Chí Minh (50), Đà Nẵng (31), Sơn La (24), Khánh Hòa (22), Hòa Bình (11), Quảng Ninh (6), Gia Lai (6), Hà Tĩnh (5), Huế (5), Phú Yên (5), Bình Định (5), Hải Dương (4), Đắk Nông (4), Thanh Hoá (4), Lai Châu (3), Nghệ An (3), Ninh Bình (3), Thái Bình (3), Bình Thuận (3), Quảng Nam (3), Quảng Bình (3), Quảng Trị (3), Đắk Lắk (3), Đồng Nai (2), Lào Cai (2), Bà Rịa - Vũng Tàu (2), Quảng Ngãi (2), Kon Tum (2), Lâm Đồng (2), Nationwide (2), Vĩnh Phúc (1), Kiên Giang (1), Trà Vinh (1), Bình Phước (1), Đồng Tháp (1), Hưng Yên (1), Nam Định (1), Undefined (56)
- Has relationships with 115 Bid Solicitors
- Has competed against 263 contractors in 292 bidding packages, won 96 packages, lost 165 packages, 14 are pending results, and 17 were canceled.
- Has collaborated with 19 contractors in 41 bidding packages, won 19 packages, lost 19 packages, 2 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 22 | 12.6% |
| Lower by 10% to 20% | 12 | 6.9% |
| Lower by 5% to 10% | 24 | 13.8% |
| Lower by 1% to 5% | 65 | 37.4% |
| Lower by 0% to 1% | 35 | 20.1% |
| 0% | 7 | 4% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 2 | 1.1% |
| Higher by 5% to 10% | 1 | 0.6% |
| Higher by 10% or more | 6 | 3.4% |
| Unknown | 0 | 0% |
| Total | 174 | 100% |
NOVA SOLUTIONS AND TECHNOLOGIES JOINT STOCK COMPANY join for the Package 06/SCL2026&SX/PTC3: Supply of primary equipment and accessories for 220kV, 500kV substations package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
07/01/2026 09:03
NOVA SOLUTIONS AND TECHNOLOGIES JOINT STOCK COMPANY Won the bidding for the Package 1 "Procurement, deploying optical transmission devices" package, which was invited for bidding by the CÔNG TY VIỄN THÔNG ĐIỆN LỰC VÀ CÔNG NGHỆ THÔNG TIN - CHI NHÁNH TẬP ĐOÀN ĐIỆN LỰC VIỆT NAM through an Open bidding as sub-joint of Liên danh T-N.
- Result: Won
18/12/2025 17:40
NOVA SOLUTIONS AND TECHNOLOGIES JOINT STOCK COMPANY Won the bidding for the Extend system technical support services and HCI server system warranty package, which was invited for bidding by the CÔNG TY CÔNG NGHỆ THÔNG TIN ĐIỆN LỰC HÀ NỘI through an Open bidding as an independent entity.
- Result: Won
18/12/2025 15:03
NOVA SOLUTIONS AND TECHNOLOGIES JOINT STOCK COMPANY Won the bidding for the Providing materials and equipment for the Faculty of National Defense and Security Education and the School of Mechanical Engineering package, which was invited for bidding by the Đại học Bách khoa Hà Nội through an assign shorthand as an independent entity.
- Result: Won
05/12/2025 17:26
NOVA SOLUTIONS AND TECHNOLOGIES JOINT STOCK COMPANY join for the Extend system technical support services and HCI server system warranty package, which was invited for bidding by the CÔNG TY CÔNG NGHỆ THÔNG TIN ĐIỆN LỰC HÀ NỘI through an Open bidding as an independent entity.
- Result: Tender opening completed
28/11/2025 11:04
NOVA SOLUTIONS AND TECHNOLOGIES JOINT STOCK COMPANY lost the bidding for the Package 3 "Copyright extension, technical support services for CyberArk PIM systems, Palo Alto firewalls and Symantec security" package, which was invited for bidding by the INFORMATION AND COMMUNICATIONS TECHNOLOGY COMPANY OF VIETNAM ELECTRICITY through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
25/11/2025 17:13
NOVA SOLUTIONS AND TECHNOLOGIES JOINT STOCK COMPANY join for the Package 3 "Copyright extension, technical support services for CyberArk PIM systems, Palo Alto firewalls and Symantec security" package, which was invited for bidding by the INFORMATION AND COMMUNICATIONS TECHNOLOGY COMPANY OF VIETNAM ELECTRICITY through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Tender opening completed
12/11/2025 16:06
NOVA SOLUTIONS AND TECHNOLOGIES JOINT STOCK COMPANY Won the bidding for the Bidding package: Supply PFOI card package, which was invited for bidding by the CÔNG TY TRUYỀN TẢI ĐIỆN 1 through an Open bidding as an independent entity.
- Result: Won
05/11/2025 16:16
NOVA SOLUTIONS AND TECHNOLOGIES JOINT STOCK COMPANY Won the bidding for the Number 06: Supply and install equipment package, which was invited for bidding by the NORTHERN POWER CORPORATION through an Open bidding as sub-joint of Liên danh TELEMATIC - NOVA - HTKT.
- Result: Won
03/11/2025 15:41
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder NOVA SOLUTIONS AND TECHNOLOGIES JOINT STOCK COMPANY participated in 375 package, of which 174 package was won, failed 166 packages, 17 packages with no results, 18 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NOVA SOLUTIONS AND TECHNOLOGIES JOINT STOCK COMPANY is related to 115 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NOVA SOLUTIONS AND TECHNOLOGIES JOINT STOCK COMPANY competed with 263 contractors in 292 package, won 96 package, lost 165 package, 14 bidding package has no results, 17 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor NOVA SOLUTIONS AND TECHNOLOGIES JOINT STOCK COMPANY once entered into a partnership with 19 contractors in 41 package, won bid 19 package, lost 19 package, 2 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor NOVA SOLUTIONS AND TECHNOLOGIES JOINT STOCK COMPANY participated in bidding in 26 provinces/cities, 3 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NOVA SOLUTIONS AND TECHNOLOGIES JOINT STOCK COMPANY participated in bidding in 37 provinces/cities, 2 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor