Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:26 AM 10/16/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
8:27 AM 04/25/2025 |
Active |
At the request of QTHT |
|
12:05 AM 04/26/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
9:45 AM 06/10/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors OPTIMUM CONSTRUCTION CONSULTING COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 8 bidding packages, of which 8 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 87.87% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 95.81% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (3), Khánh Hòa (1), Undefined (4)
- Provinces before the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (2), Bình Dương (1), Undefined (5)
- Has relationships with 4 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 6 bidding packages with 4 roles.
- Building organization name: CÔNG TY TNHH TƯ VẤN XÂY DỰNG TỐI ƯU
- Construction capacity certificate code: 00020359
- Issuing Authority: Sở Kế hoạch và Đầu tư Thành phố Hồ Chí Minh
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng (kiến trúc, kết cấu, điện) công trình dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng (kiến trúc, kết cấu, điện) công trình công nghiệp
⚬ Giám sát công tác xây dựng công trình: Dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: công nghiệp dầu khí
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông đường bộ
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Thiết kế, thẩm tra thiết kế xây dựng chuyên biệt (cọc; gia cố, xử lý nền móng, kết cấu công trình; kết cấu ứng suất trước; kết cấu bao che, mặt dựng công trình) công trình dân dụng
⚬ Quản lý dự án đầu tư xây dựng: Tư vấn quản lý dự án đầu tư xây dựng công trình dân dụng
⚬ Quản lý dự án đầu tư xây dựng: Tư vấn quản lý dự án đầu tư xây dựng công trình công nghiệp
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình dân dụng
⚬ Thi công xây dựng công trình: Thi công công tác xây dựng công trình nhà công nghiệp
⚬ Giám sát công tác xây dựng công trình: Tư vấn giám sát công tác xây dựng công trình công nghiệp
⚬ Giám sát công tác xây dựng công trình: Tư vấn giám sát công tác xây dựng công trình hạ tầng kỹ thuật
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 0 | 0% |
| Lower by 10% to 20% | 1 | 12.5% |
| Lower by 5% to 10% | 1 | 12.5% |
| Lower by 1% to 5% | 4 | 50% |
| Lower by 0% to 1% | 0 | 0% |
| 0% | 2 | 25% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 8 | 100% |
OPTIMUM CONSTRUCTION CONSULTING COMPANY LIMITED Won the bidding for the Package 2: Advice on verification of economic and technical reports of Phu Tho apartment ownership (Zone A), District 11 package, which was invited for bidding by the TRUNG TÂM QUẢN LÝ NHÀ VÀ GIÁM ĐỊNH XÂY DỰNG through an assign shorthand as an independent entity.
- Result: Won
23/07/2025 09:37
OPTIMUM CONSTRUCTION CONSULTING COMPANY LIMITED Won the bidding for the Examination of economic and technical reports (technical sections and estimates) package, which was invited for bidding by the CÔNG TY CỔ PHẦN HƠI KỸ NGHỆ QUE HÀN through an assign shorthand as an independent entity.
- Result: Won
18/07/2025 10:06
OPTIMUM CONSTRUCTION CONSULTING COMPANY LIMITED Won the bidding for the Verification of construction drawing design and construction estimate package, which was invited for bidding by the THE SOUTHERN RUBBER INDUSTRY JOINT STOCK COMPANY through an assign shorthand as an independent entity.
- Result: Won
25/03/2025 09:19
OPTIMUM CONSTRUCTION CONSULTING COMPANY LIMITED Won the bidding for the Consultancy on verification of economic and technical reports package, which was invited for bidding by the Ban Quản Lý Công Viên Quận 6 through an assign shorthand as an independent entity.
- Result: Won
31/01/2024 15:36
OPTIMUM CONSTRUCTION CONSULTING COMPANY LIMITED Won the bidding for the Verification of economic and technical reports package, which was invited for bidding by the PetroVietnam Gas Projects Management Company through an assign shorthand as an independent entity.
- Result: Won
25/10/2023 09:10
OPTIMUM CONSTRUCTION CONSULTING COMPANY LIMITED Won the bidding for the Check total investment package, which was invited for bidding by the Chi nhánh Tổng Công ty Khí Việt Nam - CTCP - Công ty Quản lý dự án Khí through an assign shorthand as an independent entity.
- Result: Won
03/02/2020 10:02
OPTIMUM CONSTRUCTION CONSULTING COMPANY LIMITED Won the bidding for the Basic design verification package, which was invited for bidding by the Chi nhánh Tổng Công ty Khí Việt Nam - CTCP - Công ty Quản lý dự án Khí through an assign shorthand as an independent entity.
- Result: Won
03/02/2020 09:57
OPTIMUM CONSTRUCTION CONSULTING COMPANY LIMITED Won the bidding for the Verification of Feasibility Study Report package, which was invited for bidding by the Chi nhánh Tổng Công ty Khí Việt Nam - CTCP - Công ty Quản lý dự án Khí through an assign shorthand as an independent entity.
- Result: Won
26/09/2019 10:56
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder OPTIMUM CONSTRUCTION CONSULTING COMPANY LIMITED participated in 8 package, of which 8 package was won, failed 0 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor OPTIMUM CONSTRUCTION CONSULTING COMPANY LIMITED is related to 4 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor OPTIMUM CONSTRUCTION CONSULTING COMPANY LIMITED participated in bidding in 2 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor OPTIMUM CONSTRUCTION CONSULTING COMPANY LIMITED participated in bidding in 2 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor