Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors PARABOL JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 32 bidding packages, of which 32 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 7.82% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 95% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (2), Quảng Ninh (1), Hưng Yên (1), Undefined (28)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (2), Quảng Ninh (1), Hưng Yên (1), Undefined (28)
- Has relationships with 16 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 1 contractors in 1 bidding packages, won 1 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 106 bidding packages with 31 roles.
- Published contractor selection plan of 0 project with a total of 0 of bidding packages.
- Invitation to bid 8 package (with 8 Tender Notices), conducting Prequalificatin Notice 0 packages.
- Results of 7 packages announced, canceled bids 0 packages (among the packages above).
- There are 0 packages with results without Tender Notice and Prequalification Notice.
This contractor is also the investor. The results of data analysis for investors PARABOL JOINT STOCK COMPANY are as follows:
- As the investor of 0 investment and development projects.
- As the investor of 0 Contractor Selection Plan, including 0 self-published Contractor Selection Plan, 0 Contractor Selection Plan is self-published by the entity. other posted.
- As the investor of 0 bidding package in which the package is self-inviting 0, with 0 the package is owned by the unit. other bidding.
- Building organization name: CÔNG TY CỔ PHẦN PARABOL
- Construction capacity certificate code: 00010970
- Issuing Authority: Sở kế hoạch đầu tư Thành phố Hà Nội
- Field:
⚬ Lập quy hoạch xây dựng:
⚬ Quản lý dự án đầu tư xây dựng: NN&PTNT
⚬ Quản lý dự án đầu tư xây dựng: Hạ tầng kỹ thuật
⚬ Quản lý dự án đầu tư xây dựng: Giao thông Cầu, đường bộ
⚬ Thi công xây dựng công trình: Dân dụng
⚬ Giám sát thi công xây dựng công trình: Dân dụng
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 1 | 3.1% |
| Lower by 10% to 20% | 0 | 0% |
| Lower by 5% to 10% | 2 | 6.3% |
| Lower by 1% to 5% | 7 | 21.9% |
| Lower by 0% to 1% | 3 | 9.4% |
| 0% | 19 | 59.4% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 32 | 100% |
PARABOL JOINT STOCK COMPANY Won the bidding for the Consultancy on appraisal of tender documents and contractor selection package, which was invited for bidding by the NGÂN HÀNG NÔNG NGHIỆP VÀ PHÁT TRIỂN NÔNG THÔN VIỆT NAM - CHI NHÁNH HƯNG YÊN through an assign shorthand as an independent entity.
- Result: Won
25/09/2024 14:48
PARABOL JOINT STOCK COMPANY Won the bidding for the Consultancy on preparation of Proposal and evaluation of Proposal (2nd phase) package, which was invited for bidding by the SỞ THÔNG TIN VÀ TRUYỀN THÔNG QUẢNG TRỊ through an assign shorthand as an independent entity.
- Result: Won
09/08/2024 08:42
PARABOL JOINT STOCK COMPANY Won the bidding for the Consultancy on appraisal of request documents, contractor selection results package, which was invited for bidding by the Ngân hàng Nông nghiệp và phát triển Nông thôn Việt Nam - Chi nhánh Hà Thành through an assign shorthand as an independent entity.
- Result: Won
11/12/2023 16:39
PARABOL JOINT STOCK COMPANY Won the bidding for the GT01-Preparing bidding documents and evaluating bidding documents for consulting, construction, and equipment packages package, which was invited for bidding by the Office of Ministry of Agriculture and Rural Development through an assign shorthand as an independent entity.
- Result: Won
05/12/2023 15:29
PARABOL JOINT STOCK COMPANY Won the bidding for the Consulting on Preparation of Finance and Technical Report package, which was invited for bidding by the NGÂN HÀNG NÔNG NGHIỆP VÀ PHÁT TRIỂN NÔNG THÔN VIỆT NAM - CHI NHÁNH TỈNH QUẢNG NINH through an assign bid as an independent entity.
- Result: Won
04/12/2023 12:27
PARABOL JOINT STOCK COMPANY Won the bidding for the Consulting on appraisal of bidding documents, contractor selection results package, which was invited for bidding by the SỞ THÔNG TIN VÀ TRUYỀN THÔNG QUẢNG TRỊ through an assign bid as an independent entity.
- Result: Won
14/11/2023 16:21
PARABOL JOINT STOCK COMPANY Won the bidding for the Bidding package TV-07: Bidding consulting package, which was invited for bidding by the Cục Xăng dầu/TCHC-KT/BQP through an assign shorthand as an independent entity.
- Result: Won
07/11/2023 13:56
PARABOL JOINT STOCK COMPANY Won the bidding for the Consultancy on preparation and evaluation of tender documents package, which was invited for bidding by the Văn phòng Viện kiểm sát nhân dân tối cao through an assign shorthand as an independent entity.
- Result: Won
01/08/2023 15:44
PARABOL JOINT STOCK COMPANY Won the bidding for the Consultancy on making feasibility study report package, which was invited for bidding by the Ban Quản lý dự án các công trình Bưu điện, Tổng công ty Bưu điện Việt Nam through an assign shorthand as sub-joint of 0104104966 - CÔNG TY CỔ PHẦN XÂY LẮP CƠ ĐIỆN VÀ PCCC HOÀNG KIM,0102987843 - Công ty cổ phần Parabol.
- Result: Won
14/08/2021 10:17
PARABOL JOINT STOCK COMPANY Won the bidding for the Geological survey consulting and preparation of economic and technical reports package, which was invited for bidding by the BƯU ĐIỆN TỈNH VĨNH PHÚC through an assign shorthand as an independent entity.
- Result: Won
12/01/2021 14:56
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder PARABOL JOINT STOCK COMPANY participated in 32 package, of which 32 package was won, failed 0 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor PARABOL JOINT STOCK COMPANY is related to 16 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor PARABOL JOINT STOCK COMPANY once entered into a partnership with 1 contractors in 1 package, won bid 1 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor PARABOL JOINT STOCK COMPANY participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor PARABOL JOINT STOCK COMPANY participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor