Data analysis results of DauThau.info software for contractors POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3 are as follows:
You need to Login or Sign up to view all informations.
- Participated in 937 bidding packages, of which 694 were won, 197 were lost, 29 are pending results, and 17 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 9.69% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.04% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (92), Lâm Đồng (90), Hà Nội (67), Đắk Lắk (53), Gia Lai (49), Đà Nẵng (40), Đồng Nai (38), Khánh Hòa (36), Cần Thơ (28), Vĩnh Long (21), Tây Ninh (13), Thanh Hoá (12), Quảng Ngãi (12), Hải Phòng (10), Nghệ An (9), Lai Châu (9), Quảng Trị (9), Quảng Ninh (8), Phú Thọ (6), Huế (6), Đồng Tháp (6), Ninh Bình (6), Cà Mau (5), Bắc Ninh (5), Hà Tĩnh (4), An Giang (4), Hưng Yên (4), Sơn La (3), Tuyên Quang (3), Thái Nguyên (3), Lào Cai (3), Lạng Sơn (2), Nationwide (2), Điện Biên (1), Undefined (336)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (67), TP.Hồ Chí Minh (62), Lâm Đồng (42), Gia Lai (35), Bình Thuận (34), Đắk Lắk (31), Đà Nẵng (24), Bình Phước (22), Phú Yên (21), Đắk Nông (20), Cần Thơ (19), Trà Vinh (17), Quảng Nam (16), Khánh Hòa (15), Ninh Thuận (15), Bình Định (14), Đồng Nai (12), Bà Rịa - Vũng Tàu (12), Thanh Hoá (12), Nghệ An (9), Lai Châu (9), Quảng Ninh (8), Hải Phòng (6), Long An (6), Huế (6), Quảng Ngãi (6), Quảng Bình (5), Sóc Trăng (4), Hà Tĩnh (4), Hậu Giang (4), Tây Ninh (4), Cà Mau (3), Hòa Bình (3), Bình Dương (3), Đồng Tháp (3), Sơn La (3), Bắc Ninh (3), Hải Dương (3), Kon Tum (3), Quảng Trị (3), Lạng Sơn (2), An Giang (2), Bạc Liêu (2), Tiền Giang (2), Thái Nguyên (2), Nationwide (2), Thái Bình (2), Bến Tre (2), Ninh Bình (2), Tuyên Quang (1), Lào Cai (1), Yên Bái (1), Phú Thọ (1), Vĩnh Phúc (1), Bắc Giang (1), Hà Giang (1), Kiên Giang (1), Điện Biên (1), Undefined (391)
- Has relationships with 182 Bid Solicitors
- Has competed against 210 contractors in 355 bidding packages, won 131 packages, lost 195 packages, 19 are pending results, and 10 were canceled.
- Has collaborated with 30 contractors in 64 bidding packages, won 43 packages, lost 13 packages, 7 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 997 bidding packages with 88 roles.
- Published contractor selection plan of 4 project with a total of 4 of bidding packages.
- Invitation to bid 5 package (with 7 Tender Notices), conducting Prequalificatin Notice 0 packages.
- Results of 3 packages announced, canceled bids 0 packages (among the packages above).
- There are 0 packages with results without Tender Notice and Prequalification Notice.
This contractor is also the investor. The results of data analysis for investors Power Engineering Consulting Joint Stock Company 3 are as follows:
- As the investor of 0 investment and development projects.
- As the investor of 0 Contractor Selection Plan, including 0 self-published Contractor Selection Plan, 0 Contractor Selection Plan is self-published by the entity. other posted.
- As the investor of 0 bidding package in which the package is self-inviting 0, with 0 the package is owned by the unit. other bidding.
- Building organization name: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN 3
- Construction capacity certificate code: 00002346
- Issuing Authority: Sở Kế hoạch và Đầu tư thành phố Hồ Chí Minh
- Field:
⚬ Khảo sát xây dựng: Khảo sát công trình xây dựng
⚬ Quản lý dự án đầu tư xây dựng: Công nghiệp (năng lượng)
⚬ Giám sát thi công xây dựng công trình: Công nghiệp (năng lượng)
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 54 | 7.8% |
| Lower by 10% to 20% | 72 | 10.4% |
| Lower by 5% to 10% | 116 | 16.7% |
| Lower by 1% to 5% | 232 | 33.4% |
| Lower by 0% to 1% | 154 | 22.2% |
| 0% | 22 | 3.2% |
| Higher by 0% to 1% | 1 | 0.1% |
| Higher by 1% to 5% | 4 | 0.6% |
| Higher by 5% to 10% | 2 | 0.3% |
| Higher by 10% or more | 29 | 4.2% |
| Unknown | 8 | 1.2% |
| Total | 694 | 100% |
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3 join for the 03-SS3TV: Verification of pre-feasibility study report, feasibility study report, technical design and estimate, construction drawing design of Se San 3 Hydropower Plant Expansion Project package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN 3. One other contractors also participated.
14/01/2026 11:03
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3 join for the Bidding package No. 5: Providing construction survey consulting services, preparing construction accounts to be deployed after the basic design, financial design and environmental documents; Cost of applying building information modeling (BIM) after structural design; Costs for measuring and drawing cadastral maps and surveying and placing landmarks for compensation and site clearance package, which was invited for bidding by the through an Open bidding as an independent entity.
13/01/2026 11:20
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3 Won the bidding for the Hiring a pre-feasibility consultation service to install gas turbine generator (GTG) to improve electricity-steam efficiency, fuel economy and reduce greenhouse gas emissions for Dung Quat Oil Refinery according to orders No. 100003505/0395/University of HCPT/Hiring Consulting Services for A Pre-FeSibility Study on the Installation of A Gas Turbine Generator (GTG) GTG) Unit to Improve Electrical-Steam Efficiency, Reduce Fuel Consum 100003505/0395/DH-NCPT. package, which was invited for bidding by the BINH SON REFINING AND PETROCHEMICAL JOINT STOCK COMPANY through an Open bidding as an independent entity.
- Result: Won
13/01/2026 11:05
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3 join for the TV02-BCMR: Survey consulting, preparation of pre-feasibility study report (including preparation of documents requesting approval of investment policy); Survey and prepare a Feasibility Study Report; Survey, prepare technical designs, prepare bidding documents, evaluate bids for bidding packages; Prepare construction drawing design package, which was invited for bidding by the through an Open bidding as an independent entity.
12/01/2026 11:01
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3 join for the Tender package No 2: Providing consulting services for verifying construction investment feasibility study reports, supervising construction surveys package, which was invited for bidding by the through an Open bidding as an independent entity.
12/01/2026 10:57
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3 join for the Bidding package No. 5: Providing construction survey consulting services, preparing construction accounts to be deployed after the basic design, financial design, environmental documents and specialized agreements; cost of building information modeling (BIM) application; Extract and measure cadastral maps, prepare documents to carry out procedures for land recovery and land lease package, which was invited for bidding by the through an Open bidding as an independent entity.
06/01/2026 11:00
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3 lost the bidding for the EPC package: Design, supply, installation of materials and equipment and construction package, which was invited for bidding by the through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN 3. Five other contractors also participated.
- Result: Lost
06/01/2026 08:58
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3 join for the Bidding package No. 3: Providing consulting services for preparing construction drawing designs and bidding documents package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN 3. One other contractors also participated.
05/01/2026 14:18
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3 join for the Bidding package: Survey consulting, preparation of construction investment feasibility study report, Environmental impact assessment report, Agreement report on connection plan for Ninh Binh Flexible Power Plant Project package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ĐIỆN 3. One other contractors also participated.
31/12/2025 11:18
POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3 Won the bidding for the Package No. 4: Providing consulting services to supervise the survey of the KKT period; Consulting on technical design - construction cost estimates package, which was invited for bidding by the TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA through an Open bidding as an independent entity.
- Result: Won
30/12/2025 14:19
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3 participated in 937 package, of which 694 package was won, failed 197 packages, 29 packages with no results, 17 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3 is related to 182 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3 competed with 210 contractors in 355 package, won 131 package, lost 195 package, 19 bidding package has no results, 10 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3 once entered into a partnership with 30 contractors in 64 package, won bid 43 package, lost 13 package, 7 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3 participated in bidding in 33 provinces/cities, 2 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 3 participated in bidding in 57 provinces/cities, 2 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor