Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors RED - RIVER CONSTRUCTION TECHNOLOGY JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 17 bidding packages, of which 17 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 85.39% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.36% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Quảng Ninh (4), Hải Phòng (2), Khánh Hòa (1), Bắc Ninh (1), Cao Bằng (1), Undefined (8)
- Provinces before the merger where the contractor has participated in bidding : Quảng Ninh (4), Khánh Hòa (1), Bắc Ninh (1), Hải Dương (1), Hải Phòng (1), Cao Bằng (1), Undefined (8)
- Has relationships with 12 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 2 bidding packages with 1 roles.
- Building organization name: CÔNG TY CỔ PHẦN KỸ THUẬT XÂY DỰNG SÔNG HỒNG
- Construction capacity certificate code: 00000793
- Issuing Authority: Sở Kế hoạch và Đầu tư tỉnh Bắc Ninh
- Field:
⚬ Khảo sát xây dựng:
- Lab name: Construction specialized laboratory.
- Laboratory code: LAS-XD 1624
- Certifications:
⚬ Certificate 437/GCN-BXD.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 0 | 0% |
| Lower by 10% to 20% | 1 | 5.9% |
| Lower by 5% to 10% | 0 | 0% |
| Lower by 1% to 5% | 4 | 23.5% |
| Lower by 0% to 1% | 4 | 23.5% |
| 0% | 8 | 47.1% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 17 | 100% |
RED - RIVER CONSTRUCTION TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Package No. 23: Geological survey consulting (additional part) package, which was invited for bidding by the Viện kiểm sát nhân dân tỉnh Quảng Ninh through an assign shorthand as an independent entity.
- Result: Won
27/11/2025 11:39
RED - RIVER CONSTRUCTION TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Consulting on topographic and geological surveys for the project of building the headquarters of the People's Procuracy of Quang Hoa district, Cao Bang province (now the People's Procuracy of Region 2, Cao Bang province) package, which was invited for bidding by the Viện kiểm sát nhân dân tỉnh Cao Bằng through an assign shorthand as an independent entity.
- Result: Won
21/10/2025 16:35
RED - RIVER CONSTRUCTION TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Package TV-02: Survey of topographic, project geology package, which was invited for bidding by the Viện kiểm sát nhân dân thành phố Hải Phòng through an assign bid as an independent entity.
- Result: Won
28/05/2025 17:09
RED - RIVER CONSTRUCTION TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Bidding package No. 10: Geological survey consulting (step to prepare the financial plan) package, which was invited for bidding by the Viện kiểm sát nhân dân tỉnh Quảng Ninh through an assign shorthand as an independent entity.
- Result: Won
11/10/2024 10:25
RED - RIVER CONSTRUCTION TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Package 03: Geological survey consultancy (project preparation step) package, which was invited for bidding by the Viện kiểm sát nhân dân tỉnh Quảng Ninh through an assign shorthand as an independent entity.
- Result: Won
11/10/2024 09:54
RED - RIVER CONSTRUCTION TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Package 02: Topographic survey consulting package, which was invited for bidding by the Viện kiểm sát nhân dân tỉnh Quảng Ninh through an assign shorthand as an independent entity.
- Result: Won
27/09/2024 09:28
RED - RIVER CONSTRUCTION TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Package No. 01: Consulting on geological and terrain surveys package, which was invited for bidding by the Viện Kiểm sát nhân dân tỉnh Hải Dương through an assign bid as an independent entity.
- Result: Won
09/08/2024 17:30
RED - RIVER CONSTRUCTION TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Package No. 06: Consulting on setting up geological survey tasks and estimates for the design step of physical protection package, which was invited for bidding by the Ban quản lý dự án xây dựng Từ Sơn through an assign shorthand as an independent entity.
- Result: Won
16/04/2024 16:17
RED - RIVER CONSTRUCTION TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Construction survey package, which was invited for bidding by the Viện kiểm sát nhân dân tỉnh Khánh Hòa through an assign bid as an independent entity.
- Result: Won
02/03/2024 11:24
RED - RIVER CONSTRUCTION TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Package No. 2: Consulting on topographic and geological surveys package, which was invited for bidding by the BAN QUẢN LÝ DỰ ÁN XÂY DỰNG KINH BẮC through an assign shorthand as an independent entity.
- Result: Won
30/08/2023 14:37
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder RED - RIVER CONSTRUCTION TECHNOLOGY JOINT STOCK COMPANY participated in 17 package, of which 17 package was won, failed 0 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor RED - RIVER CONSTRUCTION TECHNOLOGY JOINT STOCK COMPANY is related to 12 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor RED - RIVER CONSTRUCTION TECHNOLOGY JOINT STOCK COMPANY participated in bidding in 5 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor RED - RIVER CONSTRUCTION TECHNOLOGY JOINT STOCK COMPANY participated in bidding in 6 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor