Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
6:17 AM 04/02/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
4:08 PM 04/21/2023 |
Active |
At the request of QTHT |
|
11:35 PM 11/16/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
2:37 PM 11/18/2023 |
Active |
At the request of QTHT |
|
11:31 PM 12/22/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
2:26 PM 01/16/2024 |
Active |
At the request of QTHT |
|
11:32 PM 03/30/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
10:10 AM 06/13/2024 |
Active |
At the request of QTHT |
|
12:33 AM 07/01/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
9:57 AM 09/20/2024 |
Active |
At the request of QTHT |
|
12:07 AM 11/12/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
6:56 PM 11/20/2024 |
Active |
At the request of QTHT |
|
12:05 AM 01/09/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
3:12 PM 02/21/2025 |
Active |
At the request of QTHT |
|
12:21 AM 04/01/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
9:27 AM 06/26/2025 |
Active |
At the request of QTHT |
|
12:05 AM 11/25/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
5:43 AM 11/25/2025 |
Active |
At the request of QTHT |
|
12:05 AM 12/11/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
5:11 PM 12/29/2025 |
Active |
At the request of QTHT |
|
12:05 AM 02/17/2026 |
Pause |
Temporarily suspended due to overdue fees |
|
8:44 AM 04/11/2026 |
Active |
At the request of QTHT |
|
12:05 AM 06/16/2026 |
Pause |
Temporarily suspended due to overdue fees |
|
3:34 PM 06/22/2026 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors SILVERSTAR VIET ARCHITECTURE AND INTERIOR JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 26 bidding packages, of which 23 were won, 2 were lost, 1 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 87.34% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.21% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Ninh Bình (2), Hà Nội (24), Bắc Ninh (1), Cao Bằng (1), Hà Tĩnh (1), Hưng Yên (1), Lai Châu (1), Lào Cai (1), Lạng Sơn (1), Nghệ An (1), Phú Thọ (1), Sơn La (1), Thanh Hoá (1), Thái Nguyên (1), Tuyên Quang (1), Undefined (1)
- Provinces before the merger where the contractor has participated in bidding : Hà Nam (1), Hà Nội (24), Cao Bằng (1), Hà Tĩnh (1), Lai Châu (1), Lạng Sơn (1), Nghệ An (1), Sơn La (1), Thanh Hoá (1), Undefined (1)
- Has relationships with 9 Bid Solicitors
- Has relationships with 15 Bid Investors
- Has competed against 8 contractors in 26 bidding packages, won 23 packages, lost 2 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Building organization name: CÔNG TY CỔ PHẦN KIẾN TRÚC VÀ NỘI THẤT SILVERSTAR VIỆT
- Construction capacity certificate code: 00061239
- Issuing Authority: Sở kế hoạch đầu tư thành phố Hà Nội
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng
⚬ Thi công xây dựng công trình: Dân dụng
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 0 | |
| Lower by 10% to 20% | 1 | 0% |
| Lower by 5% to 10% | 0 | |
| Lower by 1% to 5% | 4 | 0% |
| Lower by 0% to 1% | 9 | 0% |
| 0% | 9 | 0% |
| Higher by 0% to 1% | 0 | |
| Higher by 1% to 5% | 0 | |
| Higher by 5% to 10% | 0 | |
| Higher by 10% or more | 0 | |
| Unknown | 0 | |
| Total | 23 | 100% |
SILVERSTAR VIET ARCHITECTURE AND INTERIOR JOINT STOCK COMPANY Won the bidding for the Repair and renovate facilities for the 2026 - 2027 school year package, which was invited for bidding by the Trường tiểu học Lê Quý Đôn through an as an independent entity.
- Result: Won
31/07/2026 15:47
SILVERSTAR VIET ARCHITECTURE AND INTERIOR JOINT STOCK COMPANY Won the bidding for the Construction of renovating the foundation, paving the school yard, building a plant tank for Ngo Thi Nham Kindergarten package, which was invited for bidding by the Trường mầm non Ngô Thì Nhậm through an as an independent entity.
- Result: Won
27/07/2026 21:48
SILVERSTAR VIET ARCHITECTURE AND INTERIOR JOINT STOCK COMPANY Won the bidding for the Providing procedure room renovation services for the Endocrinology and Musculoskeletal departments package, which was invited for bidding by the National Geriatric Hospital through an as an independent entity.
- Result: Won
02/06/2026 15:07
SILVERSTAR VIET ARCHITECTURE AND INTERIOR JOINT STOCK COMPANY lost the bidding for the Equip 2026 uniforms for employees in NPSC package, which was invited for bidding by the NORTHERN POWER SERVICE COMPANY - BRANCH OF NORTHERN POWER CORPORATION through an as an independent entity.
- Result: Lost
01/06/2026 09:04
SILVERSTAR VIET ARCHITECTURE AND INTERIOR JOINT STOCK COMPANY Won the bidding for the Contract package: Renovating and repairing roof waterproofing for Ngo Thi Nham kindergarten package, which was invited for bidding by the Trường mầm non Ngô Thì Nhậm through an as an independent entity.
- Result: Won
11/04/2026 08:55
SILVERSTAR VIET ARCHITECTURE AND INTERIOR JOINT STOCK COMPANY lost the bidding for the The construction and repair works of toilets, stairs and roof waterproofing E of the Central Eye Hospital package, which was invited for bidding by the National Institute Of Ophthalmology through an as an independent entity.
- Result: Lost
02/02/2026 09:01
SILVERSTAR VIET ARCHITECTURE AND INTERIOR JOINT STOCK COMPANY Won the bidding for the Repair and renovate the bridge connecting house A and house B package, which was invited for bidding by the National Institute Of Ophthalmology through an as an independent entity.
- Result: Won
28/01/2026 13:57
SILVERSTAR VIET ARCHITECTURE AND INTERIOR JOINT STOCK COMPANY Won the bidding for the Providing synchronized handrail installation services for the hospital's toilets package, which was invited for bidding by the National Geriatric Hospital through an as an independent entity.
- Result: Won
23/01/2026 10:12
SILVERSTAR VIET ARCHITECTURE AND INTERIOR JOINT STOCK COMPANY Won the bidding for the Installing a roof over the parking area of Hanoi Eye Hospital - 2D Nguyen Viet Xuan Facility, Ha Dong in 2025 package, which was invited for bidding by the Bệnh Viện Mắt Hà Nội through an as an independent entity.
- Result: Won
24/12/2025 11:04
SILVERSTAR VIET ARCHITECTURE AND INTERIOR JOINT STOCK COMPANY Won the bidding for the Tender package No 04: Construction work package, which was invited for bidding by the Công an Thành phố Hà Nội through an as an independent entity.
- Result: Won
02/12/2025 17:10
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder SILVERSTAR VIET ARCHITECTURE AND INTERIOR JOINT STOCK COMPANY participated in 26 package, of which 23 package was won, failed 2 packages, 1 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SILVERSTAR VIET ARCHITECTURE AND INTERIOR JOINT STOCK COMPANY is related to 9 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SILVERSTAR VIET ARCHITECTURE AND INTERIOR JOINT STOCK COMPANY has a relationship with 15 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SILVERSTAR VIET ARCHITECTURE AND INTERIOR JOINT STOCK COMPANY competed with 8 contractors in 26 package, won 23 package, lost 2 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SILVERSTAR VIET ARCHITECTURE AND INTERIOR JOINT STOCK COMPANY participated in bidding in 15 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SILVERSTAR VIET ARCHITECTURE AND INTERIOR JOINT STOCK COMPANY participated in bidding in 9 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,054 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor