Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors SOLUTION AND TECHNOLOGY COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 198 bidding packages, of which 35 were won, 141 were lost, 10 are pending results, and 12 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 28.95% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 63.86% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (32), Đà Nẵng (30), Đồng Nai (23), Khánh Hòa (16), Quảng Ngãi (11), Gia Lai (11), Lâm Đồng (8), Đắk Lắk (7), Đồng Tháp (6), Cần Thơ (5), Vĩnh Long (5), Quảng Trị (4), Hải Phòng (4), An Giang (4), Tây Ninh (3), Sơn La (2), Ninh Bình (2), Cà Mau (2), Hà Nội (2), Cao Bằng (1), Bắc Ninh (1), Lào Cai (1), Phú Thọ (1), Huế (1), Hưng Yên (1), Undefined (20)
- Provinces before the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (28), Đà Nẵng (26), Đồng Nai (23), Khánh Hòa (12), Kon Tum (9), Bình Định (8), Quảng Trị (4), Ninh Thuận (4), Kiên Giang (4), Đắk Nông (4), Trà Vinh (4), Đồng Tháp (4), Đắk Lắk (4), Quảng Nam (3), Gia Lai (3), Bà Rịa - Vũng Tàu (3), Hải Phòng (3), Cần Thơ (3), Phú Yên (3), Quảng Ngãi (2), Sơn La (2), Sóc Trăng (2), Long An (2), Bình Thuận (2), Cà Mau (2), Hà Nội (2), Tiền Giang (2), Lâm Đồng (1), Hải Dương (1), Bình Dương (1), Tây Ninh (1), Hà Nam (1), Nam Định (1), Cao Bằng (1), Bắc Giang (1), Lào Cai (1), Phú Thọ (1), Huế (1), Bạc Liêu (1), Vĩnh Long (1), Bến Tre (1), Thái Bình (1), Undefined (22)
- Has relationships with 81 Bid Solicitors
- Has competed against 199 contractors in 185 bidding packages, won 23 packages, lost 141 packages, 9 are pending results, and 12 were canceled.
- Has collaborated with 22 contractors in 40 bidding packages, won 3 packages, lost 29 packages, 4 are pending results, and 4 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 24 | 68.6% |
| Lower by 10% to 20% | 7 | 20% |
| Lower by 5% to 10% | 0 | 0% |
| Lower by 1% to 5% | 0 | 0% |
| Lower by 0% to 1% | 0 | 0% |
| 0% | 4 | 11.4% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 35 | 100% |
SOLUTION AND TECHNOLOGY COMPANY LIMITED lost the bidding for the Package 100: Modem shopping and SCADA system communication software package, which was invited for bidding by the Công ty Điện lực Đà Nẵng - Chi nhánh Tổng công ty Điện lực miền Trung through an Competitive Offer as an independent entity. One other contractors also participated.
- Result: Lost
25/09/2025 08:15
SOLUTION AND TECHNOLOGY COMPANY LIMITED join for the Package 100: Modem shopping and SCADA system communication software package, which was invited for bidding by the Công ty Điện lực Đà Nẵng - Chi nhánh Tổng công ty Điện lực miền Trung through an Competitive Offer as an independent entity. One other contractors also participated.
- Result: Tender opening completed
28/08/2025 14:02
SOLUTION AND TECHNOLOGY COMPANY LIMITED join for the Package 01: Procurement of RMU cabinets for the repair project of transformer stations in Dalat city in 2025 package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC LÂM ĐỒNG through an Open bidding as an independent entity. Seven other contractors also participated.
22/08/2025 09:08
SOLUTION AND TECHNOLOGY COMPANY LIMITED lost the bidding for the Package No. 89.2025 - Shopping 24KV cabinets package, which was invited for bidding by the KHANH HOA POWER JOINT STOCK COMPANY through an Open bidding as an independent entity. Ten other contractors also participated.
- Result: Lost
19/08/2025 13:36
SOLUTION AND TECHNOLOGY COMPANY LIMITED lost the bidding for the Package 1: Provide 4G modem package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC GIA LAI through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Lost
25/06/2025 17:14
SOLUTION AND TECHNOLOGY COMPANY LIMITED join for the Package No. 89.2025 - Shopping 24KV cabinets package, which was invited for bidding by the KHANH HOA POWER JOINT STOCK COMPANY through an Open bidding as an independent entity. Ten other contractors also participated.
- Result: Tender opening completed
18/06/2025 09:01
SOLUTION AND TECHNOLOGY COMPANY LIMITED join for the Package 1: Provide 4G modem package, which was invited for bidding by the CÔNG TY ĐIỆN LỰC GIA LAI through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Tender opening completed
11/06/2025 15:20
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder SOLUTION AND TECHNOLOGY COMPANY LIMITED participated in 198 package, of which 35 package was won, failed 141 packages, 10 packages with no results, 12 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SOLUTION AND TECHNOLOGY COMPANY LIMITED is related to 81 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SOLUTION AND TECHNOLOGY COMPANY LIMITED competed with 199 contractors in 185 package, won 23 package, lost 141 package, 9 bidding package has no results, 12 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor SOLUTION AND TECHNOLOGY COMPANY LIMITED once entered into a partnership with 22 contractors in 40 package, won bid 3 package, lost 29 package, 4 bidding package has no results, 4 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor SOLUTION AND TECHNOLOGY COMPANY LIMITED participated in bidding in 25 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SOLUTION AND TECHNOLOGY COMPANY LIMITED participated in bidding in 42 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor