History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
5:37 PM 09/17/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
1:39 PM 09/23/2022 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors SOUNDTON INDUSTRY JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 479 bidding packages, of which 178 were won, 251 were lost, 26 are pending results, and 24 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 3.79% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 84.07% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Thanh Hoá (104), Hưng Yên (84), Quảng Ninh (72), Vĩnh Long (61), Cần Thơ (40), TP.Hồ Chí Minh (32), Lâm Đồng (27), Hà Tĩnh (25), Hải Phòng (7), Hà Nội (4), Đồng Nai (2), Thái Nguyên (2), Lạng Sơn (1), Đà Nẵng (1), Bắc Ninh (1), Phú Thọ (1), Quảng Ngãi (1), Undefined (16)
- Provinces before the merger where the contractor has participated in bidding : Thanh Hoá (104), Thái Bình (79), Quảng Ninh (72), Trà Vinh (56), Hậu Giang (36), Bình Thuận (26), Hà Tĩnh (25), Bà Rịa - Vũng Tàu (25), Hải Phòng (5), Hà Nội (4), Đồng Nai (2), Thái Nguyên (2), Cần Thơ (2), Hải Dương (2), Lạng Sơn (1), Quảng Nam (1), Bắc Giang (1), Undefined (43)
- Has relationships with 41 Bid Solicitors
- Has competed against 531 contractors in 447 bidding packages, won 150 packages, lost 247 packages, 30 are pending results, and 20 were canceled.
- Has collaborated with 32 contractors in 65 bidding packages, won 20 packages, lost 36 packages, 5 are pending results, and 4 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Building organization name: CÔNG TY CỔ PHẦN CÔNG NGHIỆP SOUNDTON
- Construction capacity certificate code: 00074037
- Issuing Authority: Sở kế hoạch đầu tư thành phố Hà Nội
- Field:
⚬ Thi công xây dựng công trình: Dân dụng
⚬ Thi công xây dựng công trình: Nhà công nghiệp
⚬ Thi công xây dựng công trình: Công nghiệp Đường dây & TBA
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thi công xây dựng công trình: NN & PTNT Thủy lợi, đê điều
⚬ Thi công lắp đặt thiết bị vào công trình:
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 69 | 38.8% |
| Lower by 10% to 20% | 26 | 14.6% |
| Lower by 5% to 10% | 17 | 9.6% |
| Lower by 1% to 5% | 47 | 26.4% |
| Lower by 0% to 1% | 15 | 8.4% |
| 0% | 3 | 1.7% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 1 | 0.6% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 178 | 100% |
SOUNDTON INDUSTRY JOINT STOCK COMPANY join for the Providing hydrogen insertion processing materials for the generator of Vinh Tan 2 Thermal Power Plant package, which was invited for bidding by the through an Competitive Offer as an independent entity. One other contractors also participated.
14/01/2026 10:14
SOUNDTON INDUSTRY JOINT STOCK COMPANY lost the bidding for the Package No. 15: Major repair of coal transportation system - Cam Pha Thermal Power Plant package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN CÔNG NGHIỆP SOUNDTON. Six other contractors also participated.
- Result: Lost
12/01/2026 15:44
SOUNDTON INDUSTRY JOINT STOCK COMPANY join for the Tender package No 09HH-SXKD.NS-2026: Supply of mechanical equipment and materials package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
10/01/2026 14:09
SOUNDTON INDUSTRY JOINT STOCK COMPANY lost the bidding for the 05HH-SCL-2026: Supply of materials and equipment for condensate pumps, supply pumps, circulation pumps, and closed circuit pumps to serve the repair of Unit S2 - Duyen Hai 1 Thermal Power Plant package, which was invited for bidding by the through an Open bidding as an independent entity. Nine other contractors also participated.
- Result: Lost
07/01/2026 17:09
SOUNDTON INDUSTRY JOINT STOCK COMPANY join for the Package HH06-SCL2026: Providing materials and technical services for repairing condensate water systems; Water supply system package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
05/01/2026 08:56
SOUNDTON INDUSTRY JOINT STOCK COMPANY lost the bidding for the Package 3: Providing alternative materials for the overhaul of the GT21 PM2.1 (phase 2) package, which was invited for bidding by the through an Competitive Offer as an independent entity. Five other contractors also participated.
- Result: Lost
30/12/2025 18:26
SOUNDTON INDUSTRY JOINT STOCK COMPANY join for the Package HH04-SCL2026: Supply of materials for repair of desulfurization system (FGD); Electrostatic precipitator system (ESP); Ash and slag system package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN CÔNG NGHIỆP SOUNDTON. Two other contractors also participated.
29/12/2025 08:34
SOUNDTON INDUSTRY JOINT STOCK COMPANY join for the Tender package No 7: Providing replacement materials for the overhaul of ST23 PM2.1. package, which was invited for bidding by the through an Competitive Offer as an independent entity. Three other contractors also participated.
24/12/2025 10:57
SOUNDTON INDUSTRY JOINT STOCK COMPANY lost the bidding for the Package No. 1: Providing raw materials and consumables to serve the processing of spare materials for power plants in 2026 package, which was invited for bidding by the through an Competitive Offer as an independent entity. One other contractors also participated.
- Result: Lost
22/12/2025 14:50
SOUNDTON INDUSTRY JOINT STOCK COMPANY join for the 04HH-SCL-2026: Providing materials for dust blowing system to serve the repair of Unit S2 - Duyen Hai 1 Thermal Power Plant package, which was invited for bidding by the through an Competitive Offer as an independent entity. Three other contractors also participated.
22/12/2025 14:07
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder SOUNDTON INDUSTRY JOINT STOCK COMPANY participated in 479 package, of which 178 package was won, failed 251 packages, 26 packages with no results, 24 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SOUNDTON INDUSTRY JOINT STOCK COMPANY is related to 41 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SOUNDTON INDUSTRY JOINT STOCK COMPANY competed with 531 contractors in 447 package, won 150 package, lost 247 package, 30 bidding package has no results, 20 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor SOUNDTON INDUSTRY JOINT STOCK COMPANY once entered into a partnership with 32 contractors in 65 package, won bid 20 package, lost 36 package, 5 bidding package has no results, 4 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor SOUNDTON INDUSTRY JOINT STOCK COMPANY participated in bidding in 17 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SOUNDTON INDUSTRY JOINT STOCK COMPANY participated in bidding in 17 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor