Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
10:11 AM 11/18/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
9:05 AM 11/25/2022 |
Active |
At the request of QTHT |
|
12:02 AM 08/19/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
12:09 PM 08/24/2023 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors TECHPRO., JSC are as follows:
You need to Login or Sign up to view all informations.
- Participated in 44 bidding packages, of which 36 were won, 7 were lost, 0 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 79.82% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 89.89% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (11), TP.Hồ Chí Minh (10), Đồng Nai (6), Tây Ninh (2), Hưng Yên (1), Hải Phòng (1), Undefined (15)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (11), TP.Hồ Chí Minh (8), Long An (2), Bình Phước (2), Đồng Nai (1), Undefined (21)
- Has relationships with 21 Bid Solicitors
- Has relationships with 21 Bid Investors
- Has competed against 32 contractors in 14 bidding packages, won 6 packages, lost 7 packages, 0 are pending results, and 1 were canceled.
- Has collaborated with 5 contractors in 4 bidding packages, won 3 packages, lost 0 packages, 0 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 2 | 5.6% |
| Lower by 10% to 20% | 1 | 2.8% |
| Lower by 5% to 10% | 2 | 5.6% |
| Lower by 1% to 5% | 11 | 30.6% |
| Lower by 0% to 1% | 12 | 33.3% |
| 0% | 7 | 19.4% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 1 | 2.8% |
| Unknown | 0 | 0% |
| Total | 36 | 100% |
TECHPRO., JSC Won the bidding for the Procurement of chemicals for lottery ticket printing for Lottery Companies in 2026 (Phase 1) package, which was invited for bidding by the CÔNG TY TNHH MỘT THÀNH VIÊN XỔ SỐ KIẾN THIẾT THÀNH PHỐ HỒ CHÍ MINH - XÍ NGHIỆP IN TÀI CHÍNH. through an Open bidding as an independent entity.
- Result: Won
02/07/2026 09:51
TECHPRO., JSC join for the Procurement of chemicals for lottery ticket printing for Lottery Companies in 2026 (Phase 1) package, which was invited for bidding by the CÔNG TY TNHH MỘT THÀNH VIÊN XỔ SỐ KIẾN THIẾT THÀNH PHỐ HỒ CHÍ MINH - XÍ NGHIỆP IN TÀI CHÍNH. through an Open bidding as an independent entity.
- Result: Tender opening completed
19/06/2026 12:05
TECHPRO., JSC lost the bidding for the Replace and add toll collection equipment at Toll Station No. 1&2 - National Highway 5 according to the 2025 maintenance plan package, which was invited for bidding by the VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
11/06/2026 15:29
TECHPRO., JSC Won the bidding for the Procurement of printing ink and chemicals for lottery ticket printing for Lottery Companies in 2026 package, which was invited for bidding by the CÔNG TY TNHH MỘT THÀNH VIÊN XỔ SỐ KIẾN THIẾT THÀNH PHỐ HỒ CHÍ MINH - XÍ NGHIỆP IN TÀI CHÍNH. through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
14/05/2026 10:18
TECHPRO., JSC join for the Replace and add toll collection equipment at Toll Station No. 1&2 - National Highway 5 according to the 2025 maintenance plan package, which was invited for bidding by the VIET NAM INFRASTRUCTURE DEVELOPMENT AND FINANCE INVESTMENT JOINT STOCK COMPANY through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
09/05/2026 09:09
TECHPRO., JSC join for the Procurement of printing ink and chemicals for lottery ticket printing for Lottery Companies in 2026 package, which was invited for bidding by the CÔNG TY TNHH MỘT THÀNH VIÊN XỔ SỐ KIẾN THIẾT THÀNH PHỐ HỒ CHÍ MINH - XÍ NGHIỆP IN TÀI CHÍNH. through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
04/05/2026 10:42
TECHPRO., JSC Won the bidding for the Procurement of software rental services for the last 9 months of 2026 starting from the 4K1 ticket period on April 1, 2026 until the end of the 12K5 ticket period on December 30, 2026 package, which was invited for bidding by the DONG NAI LOTTERY AND GENERAL SERVICES COMPANY LIMITED through an Open bidding as an independent entity.
- Result: Won
21/04/2026 08:14
TECHPRO., JSC join for the Procurement of software rental services for the last 9 months of 2026 starting from the 4K1 ticket period on April 1, 2026 until the end of the 12K5 ticket period on December 30, 2026 package, which was invited for bidding by the DONG NAI LOTTERY AND GENERAL SERVICES COMPANY LIMITED through an Open bidding as an independent entity.
- Result: Tender opening completed
13/04/2026 10:37
TECHPRO., JSC Won the bidding for the Rent software to decode data on traditional lottery tickets starting from the 1K1 ticket period drawn on January 7, 2026 until the end of the 3K4 ticket period drawn on March 25, 2026. package, which was invited for bidding by the DONG NAI LOTTERY AND GENERAL SERVICES COMPANY LIMITED through an assign shorthand as an independent entity.
- Result: Won
06/01/2026 09:10
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder TECHPRO., JSC participated in 44 package, of which 36 package was won, failed 7 packages, 0 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TECHPRO., JSC is related to 21 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TECHPRO., JSC has a relationship with 21 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TECHPRO., JSC competed with 32 contractors in 14 package, won 6 package, lost 7 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor TECHPRO., JSC once entered into a partnership with 5 contractors in 4 package, won bid 3 package, lost 0 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor TECHPRO., JSC participated in bidding in 6 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TECHPRO., JSC participated in bidding in 5 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 72,215 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor