History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
5:59 PM 09/17/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
5:09 PM 09/19/2022 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors VIET LONG JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 409 bidding packages, of which 86 were won, 258 were lost, 38 are pending results, and 27 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 32.65% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 83.57% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hải Phòng (148), Quảng Ninh (111), Vĩnh Long (29), Thanh Hoá (27), Lâm Đồng (18), Hưng Yên (16), Hà Tĩnh (5), Đà Nẵng (5), Bắc Ninh (4), TP.Hồ Chí Minh (1), Thái Nguyên (1), Undefined (44)
- Provinces before the merger where the contractor has participated in bidding : Quảng Ninh (111), Hải Phòng (90), Hải Dương (47), Thanh Hoá (27), Trà Vinh (26), Bình Thuận (15), Thái Bình (10), Hà Tĩnh (5), Quảng Nam (4), Bắc Giang (3), Bà Rịa - Vũng Tàu (1), Thái Nguyên (1), Undefined (69)
- Has relationships with 42 Bid Solicitors
- Has relationships with 29 Bid Investors
- Has competed against 424 contractors in 366 bidding packages, won 57 packages, lost 254 packages, 34 are pending results, and 21 were canceled.
- Has collaborated with 25 contractors in 56 bidding packages, won 14 packages, lost 36 packages, 4 are pending results, and 2 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 37 | 43% |
| Lower by 10% to 20% | 12 | 14% |
| Lower by 5% to 10% | 6 | 7% |
| Lower by 1% to 5% | 12 | 14% |
| Lower by 0% to 1% | 18 | 20.9% |
| 0% | 1 | 1.2% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 86 | 100% |
VIET LONG JOINT STOCK COMPANY lost the bidding for the Providing furnace pipe materials and spare furnace pipe cladding for the boiler system package, which was invited for bidding by the CÔNG TY NHIỆT ĐIỆN VĨNH TÂN - CHI NHÁNH TỔNG CÔNG TY PHÁT ĐIỆN 3 - CÔNG TY CỔ PHẦN through an Open bidding as master consortium of CÔNG TY CỔ PHẦN VIỆT LONG. Eight other contractors also participated.
- Result: Lost
27/08/2026 08:34
VIET LONG JOINT STOCK COMPANY join for the Providing periodic BDSC services Shared systems and shared services in 2026 - Thai Binh 2 Thermal Power Plant package, which was invited for bidding by the PETROVIETNAM POWER GENERATION BRANCH - VIETNAM OIL AND GAS GROUP through an Open bidding as an independent entity. One other contractors also participated.
24/08/2026 14:37
VIET LONG JOINT STOCK COMPANY join for the No. 25PTV-SCL-2026: Providing fuel system overhaul services (including equipment and repair services) package, which was invited for bidding by the QUANG NINH THERMAL POWER JOINT STOCK COMPANY through an Open bidding as an independent entity.
22/08/2026 11:05
VIET LONG JOINT STOCK COMPANY join for the 48HH-SXKD-2026: Providing mechanical materials to serve the repair of environmental monitoring systems for Duyen Hai 1, Duyen Hai 3 and Duyen Hai 3 Expanded Thermal Power Plants package, which was invited for bidding by the DUYEN HAI THERMAL POWER COMPANY through an Open bidding as an independent entity. Seven other contractors also participated.
20/08/2026 14:06
VIET LONG JOINT STOCK COMPANY join for the Tender package No 1: Providing mechanical materials for regular repairs in phase 2 package, which was invited for bidding by the HAI PHONG THERMAL POWER JOINT STOCK COMPANY through an Open bidding as an independent entity. One other contractors also participated.
20/08/2026 09:12
VIET LONG JOINT STOCK COMPANY join for the Supply of coal burners for 02 boiler units of Vinh Tan 2 Thermal Power Plant package, which was invited for bidding by the CÔNG TY NHIỆT ĐIỆN VĨNH TÂN - CHI NHÁNH TỔNG CÔNG TY PHÁT ĐIỆN 3 - CÔNG TY CỔ PHẦN through an Open bidding as an independent entity. One other contractors also participated.
10/08/2026 10:13
VIET LONG JOINT STOCK COMPANY join for the Contract package: Providing thermal mechanical materials for production in 2026 package, which was invited for bidding by the VINACOMIN - NONG SON COAL & POWER JOINT STOCK COMPANY through an Open bidding as an independent entity. Two other contractors also participated.
07/08/2026 08:07
VIET LONG JOINT STOCK COMPANY lost the bidding for the Procurement of spare and replacement materials for thermo-mechanical equipment to serve regular and periodic BDSC in 2026 - Thai Binh 2 Thermal Power Plant package, which was invited for bidding by the PETROVIETNAM POWER GENERATION BRANCH - VIETNAM OIL AND GAS GROUP through an Open bidding as master consortium of CÔNG TY CỔ PHẦN VIỆT LONG. Two other contractors also participated.
- Result: Lost
25/07/2026 15:17
VIET LONG JOINT STOCK COMPANY lost the bidding for the Providing maintenance services for crane systems and lifting equipment - NMND
Thai Binh 2 package, which was invited for bidding by the PETROVIETNAM POWER GENERATION BRANCH - VIETNAM OIL AND GAS GROUP through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
25/07/2026 08:54
VIET LONG JOINT STOCK COMPANY lost the bidding for the HH21-2026: Providing materials for boiler systems and boiler auxiliary equipment (phase 02) package, which was invited for bidding by the THAI BINH THERMAL POWER COMPANY through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
24/07/2026 16:53
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder VIET LONG JOINT STOCK COMPANY participated in 409 package, of which 86 package was won, failed 258 packages, 38 packages with no results, 27 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VIET LONG JOINT STOCK COMPANY is related to 42 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VIET LONG JOINT STOCK COMPANY has a relationship with 29 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VIET LONG JOINT STOCK COMPANY competed with 424 contractors in 366 package, won 57 package, lost 254 package, 34 bidding package has no results, 21 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor VIET LONG JOINT STOCK COMPANY once entered into a partnership with 25 contractors in 56 package, won bid 14 package, lost 36 package, 4 bidding package has no results, 2 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor VIET LONG JOINT STOCK COMPANY participated in bidding in 11 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VIET LONG JOINT STOCK COMPANY participated in bidding in 12 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 72,215 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor