Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:31 AM 12/01/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
5:42 PM 12/02/2022 |
Active |
At the request of QTHT |
|
12:11 PM 04/02/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
3:39 PM 04/10/2023 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors VIET SAO COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 50 bidding packages, of which 43 were won, 7 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 24.32% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.37% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Ninh Bình (28), Hà Nội (4), Undefined (18)
- Provinces before the merger where the contractor has participated in bidding : Nam Định (25), Hà Nội (4), Undefined (21)
- Has relationships with 17 Bid Solicitors
- Has relationships with 20 Bid Investors
- Has competed against 18 contractors in 17 bidding packages, won 10 packages, lost 7 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 11 contractors in 8 bidding packages, won 8 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Building organization name: Công ty TNHH Việt Sao
- Construction capacity certificate code: 00029192
- Issuing Authority: Sở kế hoạch và đầu tư tỉnh Nam Định
- Field:
⚬ Thi công xây dựng công trình: Thi công xây dựng công trình đường dây và trạm biến áp
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 2 | 4.7% |
| Lower by 10% to 20% | 1 | 2.3% |
| Lower by 5% to 10% | 4 | 9.3% |
| Lower by 1% to 5% | 14 | 32.6% |
| Lower by 0% to 1% | 15 | 34.9% |
| 0% | 6 | 14% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 1 | 2.3% |
| Unknown | 0 | 0% |
| Total | 43 | 100% |
VIET SAO COMPANY LIMITED Won the bidding for the Construction work + equipment installation package, which was invited for bidding by the UBND XÃ HẢI HẬU through an Open bidding as sub-joint of LIÊN DANH TOÀN CẦU - VIỆT SAO.
- Result: Won
25/08/2026 10:54
VIET SAO COMPANY LIMITED Won the bidding for the Construction and installation of equipment for projects: Improving medium and low voltage power grid capacity, reducing power loss in Vu Ban commune and Lien Minh commune in 2026 package, which was invited for bidding by the NINH BINH POWER COMPANY BRANCH OF NORTHERN POWER CORPORATION through an Open bidding as an independent entity.
- Result: Won
14/08/2026 15:07
VIET SAO COMPANY LIMITED join for the Construction and installation of equipment for projects: Improving medium and low voltage power grid capacity, reducing power loss in Vu Ban commune and Lien Minh commune in 2026 package, which was invited for bidding by the NINH BINH POWER COMPANY BRANCH OF NORTHERN POWER CORPORATION through an Open bidding as an independent entity.
- Result: Tender opening completed
23/07/2026 09:32
VIET SAO COMPANY LIMITED Won the bidding for the Construction and installation of construction equipment, renovating and improving the capacity of power grid operation in Loc Hoa Ward, Vi Xuyen, Loc Ha, My Thang Commune, Nam Dinh City - Nam Dinh Province in 2026 package, which was invited for bidding by the NINH BINH POWER COMPANY BRANCH OF NORTHERN POWER CORPORATION through an Open bidding as an independent entity.
- Result: Won
07/11/2025 16:04
VIET SAO COMPANY LIMITED join for the Construction and installation of construction equipment, renovating and improving the capacity of power grid operation in Loc Hoa Ward, Vi Xuyen, Loc Ha, My Thang Commune, Nam Dinh City - Nam Dinh Province in 2026 package, which was invited for bidding by the NINH BINH POWER COMPANY BRANCH OF NORTHERN POWER CORPORATION through an Open bidding as an independent entity.
- Result: Tender opening completed
06/10/2025 09:59
VIET SAO COMPANY LIMITED Won the bidding for the Construction and installation of equipment for construction of infrastructure of residential area in Lien Bao concentrated residential area, Thanh Loi commune, Vu Ban district (effective village) package, which was invited for bidding by the UBND huyện Vụ Bản, tỉnh Nam Định through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN XÂY LẮP 898.
- Result: Won
27/06/2025 09:07
VIET SAO COMPANY LIMITED Won the bidding for the Providing shuttle car service, insurance premium, organizing fees for sightseeing and tourism in 2025 package, which was invited for bidding by the NAM DINH RURAL WATER SUPPLY JOINT STOCK COMPANY through an assign shorthand as an independent entity.
- Result: Won
07/05/2025 15:10
VIET SAO COMPANY LIMITED Won the bidding for the Construction work of renovating and upgrading the road from Dang bridge, My Hung commune to Thinh Thang street, My Loc district package, which was invited for bidding by the Ủy ban nhân dân thành phố Nam Định through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN XÂY LẮP 898. Two other contractors also participated.
- Result: Won
19/02/2025 11:09
VIET SAO COMPANY LIMITED join for the Construction work of renovating and upgrading the road from Dang bridge, My Hung commune to Thinh Thang street, My Loc district package, which was invited for bidding by the Ủy ban nhân dân thành phố Nam Định through an Open bidding as sub-joint of CÔNG TY TNHH VIỆT SAO. Two other contractors also participated.
- Result: Tender opening completed
03/02/2025 15:08
VIET SAO COMPANY LIMITED Won the bidding for the Construction and equipment installation project to build concentrated residential area in Dai Thang commune, Vu Ban district package, which was invited for bidding by the UBND huyện Vụ Bản, tỉnh Nam Định through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN BC & D. Two other contractors also participated.
- Result: Won
01/01/2025 11:44
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder VIET SAO COMPANY LIMITED participated in 50 package, of which 43 package was won, failed 7 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VIET SAO COMPANY LIMITED is related to 17 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VIET SAO COMPANY LIMITED has a relationship with 20 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VIET SAO COMPANY LIMITED competed with 18 contractors in 17 package, won 10 package, lost 7 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor VIET SAO COMPANY LIMITED once entered into a partnership with 11 contractors in 8 package, won bid 8 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor VIET SAO COMPANY LIMITED participated in bidding in 2 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VIET SAO COMPANY LIMITED participated in bidding in 2 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 72,215 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor