Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
8:15 AM 09/16/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
2:17 PM 09/19/2022 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors VINA AUTOMATION TECHNOLOGIESCOMPANY LTD are as follows:
You need to Login or Sign up to view all informations.
- Participated in 470 bidding packages, of which 129 were won, 289 were lost, 43 are pending results, and 9 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 2.94% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 80.38% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (257), Đồng Nai (27), Lâm Đồng (13), Hưng Yên (8), Đắk Lắk (6), Thanh Hoá (5), Cần Thơ (4), Hà Nội (2), Quảng Ninh (1), Undefined (147)
- Provinces before the merger where the contractor has participated in bidding : Bà Rịa - Vũng Tàu (237), Đồng Nai (25), Bình Thuận (10), Thái Bình (8), Thanh Hoá (5), TP.Hồ Chí Minh (5), Hà Nội (2), Quảng Ninh (1), Cần Thơ (1), Đắk Lắk (1), Hậu Giang (1), Undefined (174)
- Has relationships with 43 Bid Solicitors
- Has competed against 454 contractors in 443 bidding packages, won 103 packages, lost 282 packages, 50 are pending results, and 8 were canceled.
- Has collaborated with 5 contractors in 3 bidding packages, won 2 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 74 | 57.4% |
| Lower by 10% to 20% | 15 | 11.6% |
| Lower by 5% to 10% | 5 | 3.9% |
| Lower by 1% to 5% | 13 | 10.1% |
| Lower by 0% to 1% | 14 | 10.9% |
| 0% | 0 | 0% |
| Higher by 0% to 1% | 1 | 0.8% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 7 | 5.4% |
| Unknown | 0 | 0% |
| Total | 129 | 100% |
VINA AUTOMATION TECHNOLOGIESCOMPANY LTD join for the Procurement of C&I materials to overcome abnormalities and existing systems and equipment in the operation of Song Hau 1 Thermal Power Plant package, which was invited for bidding by the PETROVIETNAM POWER GENERATION BRANCH - VIETNAM OIL AND GAS GROUP through an Competitive Offer as an independent entity. Six other contractors also participated.
09/01/2026 12:14
VINA AUTOMATION TECHNOLOGIESCOMPANY LTD lost the bidding for the Provide alternative and preventive materials for the fuel system package, which was invited for bidding by the through an Open bidding as an independent entity. Five other contractors also participated.
- Result: Lost
09/01/2026 10:01
VINA AUTOMATION TECHNOLOGIESCOMPANY LTD join for the Providing materials to repair Debris filter exhaust pipes for two power units package, which was invited for bidding by the through an Open bidding as an independent entity. Nine other contractors also participated.
06/01/2026 10:02
VINA AUTOMATION TECHNOLOGIESCOMPANY LTD join for the Providing materials to reinforce truss frames and panels for 02 Zones of Vinh Tan 2 Solar Power Plant package, which was invited for bidding by the through an Open bidding as an independent entity. Four other contractors also participated.
06/01/2026 10:02
VINA AUTOMATION TECHNOLOGIESCOMPANY LTD lost the bidding for the Package 3: Providing alternative materials for the overhaul of the GT21 PM2.1 (phase 2) package, which was invited for bidding by the EVNGENCO 3 POWER SERVICE COMPANY through an Competitive Offer as an independent entity. Five other contractors also participated.
- Result: Lost
30/12/2025 18:26
VINA AUTOMATION TECHNOLOGIESCOMPANY LTD Won the bidding for the Providing consumable materials for the overhaul of GT21 PM2.1 unit package, which was invited for bidding by the CÔNG TY DỊCH VỤ SỬA CHỮA CÁC NHÀ MÁY ĐIỆN - CHI NHÁNH TỔNG CÔNG TY PHÁT ĐIỆN 3 - CÔNG TY CỔ PHẦN through an Competitive Offer as an independent entity. One other contractors also participated.
- Result: Won
30/12/2025 08:18
VINA AUTOMATION TECHNOLOGIESCOMPANY LTD lost the bidding for the Providing water comb, oil comb, oil combs for regular repair according to the 2025 plan package, which was invited for bidding by the PHU MY THERMAL POWER COMPANY through an Competitive Offer as an independent entity. Three other contractors also participated.
- Result: Lost
26/12/2025 11:08
VINA AUTOMATION TECHNOLOGIESCOMPANY LTD join for the Tender package No 3: Providing mechanical and processing materials for the overhaul of ST23 PM2.1 package, which was invited for bidding by the through an Competitive Offer as an independent entity. Two other contractors also participated.
24/12/2025 13:34
VINA AUTOMATION TECHNOLOGIESCOMPANY LTD join for the Tender package No 7: Providing replacement materials for the overhaul of ST23 PM2.1. package, which was invited for bidding by the through an Competitive Offer as an independent entity. Three other contractors also participated.
24/12/2025 10:57
VINA AUTOMATION TECHNOLOGIESCOMPANY LTD join for the Tender package No 5: Supply of materials for the valve motor actuator for the overhaul of ST23 PM2.1. package, which was invited for bidding by the through an Competitive Offer as an independent entity. Seven other contractors also participated.
24/12/2025 09:14
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder VINA AUTOMATION TECHNOLOGIESCOMPANY LTD participated in 470 package, of which 129 package was won, failed 289 packages, 43 packages with no results, 9 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VINA AUTOMATION TECHNOLOGIESCOMPANY LTD is related to 43 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VINA AUTOMATION TECHNOLOGIESCOMPANY LTD competed with 454 contractors in 443 package, won 103 package, lost 282 package, 50 bidding package has no results, 8 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor VINA AUTOMATION TECHNOLOGIESCOMPANY LTD once entered into a partnership with 5 contractors in 3 package, won bid 2 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor VINA AUTOMATION TECHNOLOGIESCOMPANY LTD participated in bidding in 9 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VINA AUTOMATION TECHNOLOGIESCOMPANY LTD participated in bidding in 11 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor