Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:05 AM 12/23/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
8:22 AM 12/23/2022 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors VITECH SCIENTIFIC DEVELOPMENT COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 277 bidding packages, of which 229 were won, 36 were lost, 12 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 2% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 5.54% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (94), Cần Thơ (33), Hà Nội (31), Khánh Hòa (21), Thanh Hoá (5), Đà Nẵng (3), Cà Mau (3), An Giang (2), Quảng Ninh (2), Bắc Ninh (2), Vĩnh Long (1), Phú Thọ (1), Đắk Lắk (1), Nghệ An (1), Gia Lai (1), Đồng Nai (1), Nationwide (1), Lào Cai (1), Hải Phòng (1), Undefined (72)
- Provinces before the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (79), Cần Thơ (32), Hà Nội (31), Khánh Hòa (21), Thanh Hoá (5), Bà Rịa - Vũng Tàu (3), Kiên Giang (2), Quảng Ninh (2), Cà Mau (2), Đà Nẵng (2), Bình Dương (2), Trà Vinh (1), Quảng Nam (1), Hòa Bình (1), Bạc Liêu (1), Đắk Lắk (1), Nghệ An (1), Bình Định (1), Đồng Nai (1), Nationwide (1), Bắc Giang (1), Yên Bái (1), Bắc Ninh (1), Hải Phòng (1), Undefined (86)
- Has relationships with 91 Bid Solicitors
- Has competed against 512 contractors in 96 bidding packages, won 58 packages, lost 35 packages, 3 are pending results, and 0 were canceled.
- Has collaborated with 4 contractors in 4 bidding packages, won 3 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 70 | 30.6% |
| Lower by 10% to 20% | 6 | 2.6% |
| Lower by 5% to 10% | 7 | 3.1% |
| Lower by 1% to 5% | 26 | 11.4% |
| Lower by 0% to 1% | 41 | 17.9% |
| 0% | 77 | 33.6% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 2 | 0.9% |
| Unknown | 0 | 0% |
| Total | 229 | 100% |
VITECH SCIENTIFIC DEVELOPMENT COMPANY LIMITED join for the Procurement of chemicals for product research and development in the first and second quarter of 2026 package, which was invited for bidding by the through an Competitive Offer as an independent entity.
09/01/2026 09:36
VITECH SCIENTIFIC DEVELOPMENT COMPANY LIMITED Won the bidding for the Purchase biological products, chemicals, and supplies to serve the professional activities of the Center for quality assurance of testing and calibration package, which was invited for bidding by the Viện Vệ sinh dịch tễ Trung ương through an Competitive Offer as an independent entity.
- Result: Won
26/12/2025 18:27
VITECH SCIENTIFIC DEVELOPMENT COMPANY LIMITED Won the bidding for the Procurement of chemicals and supplies in 2025 to serve project code NCUD.03-2023.09 package, which was invited for bidding by the Trường Đại học Khoa học Tự nhiên, Đại học Quốc gia Hà Nội through an assign shorthand as an independent entity.
- Result: Won
23/12/2025 14:41
VITECH SCIENTIFIC DEVELOPMENT COMPANY LIMITED Won the bidding for the Providing additional chemicals, biological products, and consumables for expanded vaccination activities in 2025 package, which was invited for bidding by the PASTEUR INSTITUTE IN HO CHI MINH CITY through an CGTTRG as an independent entity.
- Result: Won
19/12/2025 14:58
VITECH SCIENTIFIC DEVELOPMENT COMPANY LIMITED Won the bidding for the Providing additional chemicals, biological products, and consumables for epidemic prevention and control in 2025 of the Pasteur Institute in Ho Chi Minh City package, which was invited for bidding by the PASTEUR INSTITUTE IN HO CHI MINH CITY through an CGTTRG as an independent entity.
- Result: Won
18/12/2025 17:06
VITECH SCIENTIFIC DEVELOPMENT COMPANY LIMITED Won the bidding for the Package 01: Chemicals, testing materials, medical equipment package, which was invited for bidding by the Trung tâm Kiểm soát bệnh tật thành phố Cần Thơ through an Competitive Offer as an independent entity. Fifteen other contractors also participated.
- Result: Won
08/12/2025 10:42
VITECH SCIENTIFIC DEVELOPMENT COMPANY LIMITED Won the bidding for the Purchasing supplies, chemicals, and environment to serve professional activities at Thanh Hoa Provincial Center for Disease Control in 2025-2026 package, which was invited for bidding by the Thanh Hoa Provincial Center for Disease Control through an CGTTRG as an independent entity.
- Result: Won
04/12/2025 14:34
VITECH SCIENTIFIC DEVELOPMENT COMPANY LIMITED Won the bidding for the Bidding package for purchasing chemicals, biological products and testing supplies to prevent infectious diseases in 2025 package, which was invited for bidding by the Trung tâm Kiểm soát bệnh tật Thành phố Hồ Chí Minh through an Competitive Offer as an independent entity. Eight other contractors also participated.
- Result: Won
03/12/2025 11:37
VITECH SCIENTIFIC DEVELOPMENT COMPANY LIMITED join for the Purchase biological products, chemicals, and supplies to serve the professional activities of the Center for quality assurance of testing and calibration package, which was invited for bidding by the National Institue of Hygiene and Epidemiology through an Competitive Offer as an independent entity.
- Result: Tender opening completed
27/11/2025 16:55
VITECH SCIENTIFIC DEVELOPMENT COMPANY LIMITED Won the bidding for the Buy Chemical No. 1 in 2025 package, which was invited for bidding by the Tu Du Hospital through an Open bidding as an independent entity. Forty one other contractors also participated.
- Result: Won
12/11/2025 08:39
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder VITECH SCIENTIFIC DEVELOPMENT COMPANY LIMITED participated in 277 package, of which 229 package was won, failed 36 packages, 12 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VITECH SCIENTIFIC DEVELOPMENT COMPANY LIMITED is related to 91 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VITECH SCIENTIFIC DEVELOPMENT COMPANY LIMITED competed with 512 contractors in 96 package, won 58 package, lost 35 package, 3 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor VITECH SCIENTIFIC DEVELOPMENT COMPANY LIMITED once entered into a partnership with 4 contractors in 4 package, won bid 3 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor VITECH SCIENTIFIC DEVELOPMENT COMPANY LIMITED participated in bidding in 18 provinces/cities, 1 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VITECH SCIENTIFIC DEVELOPMENT COMPANY LIMITED participated in bidding in 23 provinces/cities, 1 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor