Invitation To Bid ( ITB, Tender Notice)

Package 10: Construction

Find: 16:41 27/11/2025
Notice Status
Published
Public procurement field
Civil Works
Name of project
Construction of multi-purpose house, yard, garage and auxiliary items for Vinh Lap Secondary School
Bidding package name
Package 10: Construction
Contractor Selection Plan ID
Name of Contractor selection plan
Construction of multi-purpose house, yard, garage and auxiliary items for Vinh Lap Secondary School
Spending category
Investment and Development Spending
Domestic/ International
Domestic
Capital source details
Ha Dong commune budget source
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
All in One
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution location
- Xã Hà Đông, City Hải Phòng
Time of bid closing
07:30 06/12/2025
Validity of bid documents
90 days
Approval ID
1382/QĐ-UBND
Approval date
27/11/2025 16:15
Approval Authority
UBND XÃ HÀ ĐÔNG
Approval Documents

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
16:16 27/11/2025
to
07:30 06/12/2025
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
07:30 06/12/2025
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
See details here . If you want to receive automatic bid opening notification via email, please upgrade your VIP1 account .
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bid Security

Notice type
Guarantee letter or guarantee insurance certificate
Bid security amount
66.000.000 VND
Amount in words
Sixty six million dong

Tender Invitation Information

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of consulting units who have participated in the package

# Unit name Role Address
1 Công ty TNHH một thành viên tư vấn xây dựng 30-10 Technical design consultancy, construction drawing design (for two -step design works), estimates Số 66 phố An Thái, phường Thành Đông, thành phố Hải Phòng
2 Công ty TNHH tư vấn xây dựng 372 Consulting on technical design verification, construction drawing design (for two -step design works), estimates Số 30/189, phố Tuệ Tĩnh, phường Thành Đông, thành phố Hải Phòng
3 Công ty cổ phần thẩm định giá PSD - Chi nhánh Đông Bắc Valuation consulting số nhà 05, tổ dân phố Đồng Bẩm, phường Linh Sơn, tỉnh Thái Nguyên
4 Công ty cổ phần đầu tư và phát triển xây dựng 7 Consulting for setting up E-HSMT Số 105 phố Đặng Thai Mai, phường Lê Thanh Nghị, thành phố Hải Phòng
5 Công ty TNHH Ngân Sơn HD E-HSMT . appraisal consulting Số 2/172 Nhữ Đình Hiền, phường Lê Thanh Nghị, thành phố Hải Phòng
6 Công ty cổ phần đầu tư và phát triển xây dựng 7 E-HSDT assessment consulting Số 105 phố Đặng Thai Mai, phường Lê Thanh Nghị, thành phố Hải Phòng
7 Công ty TNHH Ngân Sơn HD Consultancy on appraisal of contractor selection results Số 2/172 Nhữ Đình Hiền, phường Lê Thanh Nghị, thành phố Hải Phòng

Requirements for main construction equipment

Number Type of device and device characteristics Minimum quantity required
1
Máy đào một gầu, bánh xích - dung tích gầu :≥ 0,50 m3
1
2
Máy đầm bê tông, dầm dùi - công suất : ≥1,5 kW
2
3
Máy đầm bê tông, đầm bàn - công suất : ≥1,0 kW
2
4
Máy đầm đất cầm tay - trọng lượng : ≥70 kg
2
5
Máy ép cọc Robot thủy lực tự hành ≥150 T
1
6
Máy hàn xoay chiều - công suất : ≥14 kW
1
7
Máy trộn bê tông - dung tích : ≥250,0 lít
2
8
Máy trộn vữa≥ 150 lít
2
9
Máy lu bánh thép tự hành - trọng lượng tĩnh : ≥10 T
1

List of construction items:

Form No. 01A. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1
NHÀ ĐA NĂNG
2
Phần cọc
3
Cọc ly tâm PHC D300 loại A
1160.4
m
4
Ép cọc ống bê tông cốt thép dự ứng lực bằng máy ép Robot thủy lực tự hành, đường kính cọc 300mm
11.604
100m
5
Ép trước cọc bê tông ly tâm D300, đoạn cọc ép âm
0.18
100m
6
Nối cọc ống bê tông cốt thép, đường kính cọc 300mm
96
mối nối
7
Cắt tường bê tông bằng máy, chiều dày tường <=20cm .
1.884
1m
8
Gia công cấu kiện thép đặt sẵn trong bê tông, khối lượng một cấu kiện <= 10 kg
0.0105
tấn
9
Lắp đặt cấu kiện thép đặt sẵn trong bê tông, khối lượng một cấu kiện <= 10 kg
0.0105
tấn
10
Công tác gia công lắp dựng cốt thép. Cốt thép móng, đường kính cốt thép <= 10mm
0.0218
tấn
11
Công tác gia công lắp dựng cốt thép. Cốt thép móng, đường kính cốt thép <= 18mm
0.3045
tấn
12
Đổ bù cọc bằng máy trộn, đổ bằng thủ công, M250, đá 1x2, PCB40
0.4883
m3
13
Cọc dẫn đóng âm bằng thép dày 1cm, bản tổ hợp KT 300x300x3000
1
cọc
14
Phần móng
15
Đào móng công trình, chiều rộng móng <= 6m, bằng máy đào 0,8m3, đất cấp I
2.548
100m3
16
Lấp chân móng
0.8493
100m3
17
Đổ bê tông thủ công bằng máy trộn, bê tông lót móng, chiều rộng <= 250 cm, đá 4x6, mác 150, PCB40
8.0048
m3
18
Ván khuôn gỗ. Ván khuôn lót móng
0.2776
100m2
19
Ván khuôn gỗ. Ván khuôn móng cột, móng vuông, chữ nhật
0.7056
100m2
20
Ván khuôn giằng móng
0.6626
100m2
21
Lắp dựng cốt thép móng, ĐK ≤10mm
1.6076
tấn
22
Lắp dựng cốt thép móng, ĐK ≤18mm
0.9726
tấn
23
Công tác gia công lắp dựng cốt thép. Cốt thép móng, đường kính cốt thép > 18mm
1.4921
tấn
24
Đổ bê tông bằng máy, đổ bằng máy bơm bê tông, bê tông móng, chiều rộng móng <=250 cm, đá 1x2, mác 250, PCB40
31.0164
m3
25
Đổ bê tông thủ công bằng máy trộn, bê tông cổ cột, đá 1x2, mác 250, PCB40
3.9272
m3
26
Ván khuôn gỗ. Ván khuôn cổ cột
0.309
100m2
27
Xây gạch 6,5x10,5x22, xây móng, chiều dày <= 33cm, vữa XM PCB40, mác 75
5.5564
m3
28
Đổ bê tông thủ công bằng máy trộn, bê tông giằng móng đá 1x2, mác 250, PCB40
4.1673
m3
29
Ván khuôn gỗ. Ván khuôn giằng móng
0.2764
100m2
30
Đắp cát công trình bằng máy đầm đất cầm tay 70kg, độ chặt yêu cầu K=0,90
1.386
100m3
31
Thi công móng cấp phối đá dăm lớp trên
0.924
100m3
32
Nilong lót nền trước khi đổ bê tông
4.62
100m2
33
Ván khuôn tạo khe co dãn bê tông nền
0.2055
100m2
34
Đổ bê tông bằng máy, đổ bằng máy bơm bê tông, bê tông nền, đá 1x2, mác 250, PCB40
69.3
m3
35
Thi công khe cô lập mặt nền bê tông
90.8
m
36
Cắt khe cô mặt nền bê tông
1.3532
100m
37
Lắp dựng cốt thép móng, ĐK ≤10mm
3.3061
tấn
38
PHẦN THÂN THÔ
39
Đổ bê tông thủ công bằng máy trộn, bê tông cột, tiết diện cột <= 0,1m2, chiều cao <= 28m, đá 1x2, mác 250, PCB40
6.3466
m3
40
Ván khuôn thép, khung xương thép, cột chống bằng thép ống. Ván khuôn cột vuông, chữ nhật, chiều cao <= 28m
1.1648
100m2
41
Công tác gia công lắp dựng cốt thép. Cốt thép cột, trụ, đường kính cốt thép <= 10mm, chiều cao <= 28m
0.2047
tấn
42
Công tác gia công lắp dựng cốt thép. Cốt thép cột, trụ, đường kính cốt thép <= 18mm, chiều cao <= 28m
2.0431
tấn
43
Xây gạch 6,5x10,5x22, xây tường thẳng, chiều dày <= 33cm, chiều cao <= 6m, vữa XM PCB40, mác 75
89.2773
m3
44
Xây gạch 6,5x10,5x22, xây tường thẳng, chiều dày <= 11cm, chiều cao <= 6m, vữa XM PCB40, mác 75
4.0178
m3
45
Láng nền sàn có đánh màu, dày 3cm, vữa XM PCB40 mác 75
64.3008
m2
46
Quét dung dịch chống thấm mái, tường, sê nô, ô văng …
64.3008
m2
47
Ván khuôn thép, khung xương thép, cột chống bằng thép ống. Ván khuôn xà, dầm, giằng, chiều cao <= 28m
2.6878
100m2
48
Công tác gia công lắp dựng cốt thép. Cốt thép xà dầm, giằng, đường kính cốt thép <= 10mm, chiều cao <= 6m
1.2243
tấn
49
Công tác gia công lắp dựng cốt thép. Cốt thép xà dầm, giằng, đường kính cốt thép <= 18mm, chiều cao <= 6m
1.6481
tấn
50
Công tác gia công lắp dựng cốt thép. Cốt thép xà dầm, giằng, đường kính cốt thép > 18mm, chiều cao <= 6m
0.7138
tấn

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Package 10: Construction". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Package 10: Construction" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 5

You did not use the site, Click here to remain logged. Timeout: 60 second