Invitation To Bid ( ITB, Tender Notice)

Package 11: Line construction and installation

Find: 22:57 15/06/2025
Notice Status
Published
Public procurement field
Civil Works
Name of project
500 kV Binh Duong line 1 - Chon Thanh
Bidding package name
Package 11: Line construction and installation
Contractor Selection Plan ID
Name of Contractor selection plan
KHLCNT phase 2 Project ĐD 500KV BD1-CT
Spending category
Investment and Development Spending
Domestic/ International
Domestic
Capital source details
Loan and capital EVNNPT
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
Fixed unit price
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution location (After merge)
Contract Execution location (Before merge)
Related announcements
Time of bid closing
09:00 18/07/2025
Validity of bid documents
150 days
AI-classified field
Approval ID
E2500273797_2506152250
Approval date
15/06/2025 22:53
Approval Authority
TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA
Approval Documents

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
22:55 15/06/2025
to
09:00 18/07/2025
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
09:00 18/07/2025
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Estimated Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
See details here . If you want to receive automatic bid opening notification via email, please upgrade your VIP1 account .
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bid Security

Notice type
Guarantee letter or guarantee insurance certificate
Bid security amount
2.230.000.000 VND
Amount in words
Two billion two hundred thirty million dong

Tender Invitation Information

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of consulting units who have participated in the package

# Unit name Role Address
1 POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 4 Technical design consultancy, construction drawing design (for two -step design works), estimates số 11 Hoàng Hoa Thám, Phường Lộc Thọ, Thành phố Nha Trang, Khánh Hòa
2 POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1 Consulting on technical design verification, construction drawing design (for two -step design works), estimates 66 Lương Ngọc Quyến - P. Văn Quán - Q. Hà Đông - Hà nội - Việt nam.
3 POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 4 Consulting for setting up E-HSMT số 11 Hoàng Hoa Thám, Phường Lộc Thọ, Thành phố Nha Trang, Khánh Hòa

Renewal information

# Time to Renew Successfully Old bid closing time Time of bid closing after extension Old bid opening time Bid opening time after extension Reason
1 16:59 29/06/2025 09:00 04/07/2025 09:00 14/07/2025 09:00 04/07/2025 09:00 14/07/2025 Regarding the extension of the time of bid opening/closing Package 11: Building the line of 500 kV Binh Duong line 1 - Chon Wall
2 15:33 07/07/2025 09:00 14/07/2025 09:00 18/07/2025 09:00 14/07/2025 09:00 18/07/2025 Renewing the time of opening/closing bidding Package No. 11: Construction of the line of the 500 kV Binh Duong line 1 - Chon Thanh.

Requirements for main construction equipment

Number Type of device and device characteristics Minimum quantity required
1
Xe chở cột thép
2
2
Ô tô vận tải
3
3
Ô tô ben
4
4
Xe téc chở nhiên liệu + nước
2
5
Cần cẩu
1
6
Máy ủi + máy đào
3
7
Xe chở công nhân
2
8
Máy trộn bê tông
6
9
Đầm dùi
8
10
Đầm bàn
4
11
Máy uốn, cắt cốt thép
2
12
Máy hàn điện
4
13
Biến thế hàn
4
14
Máy phát điện Điêzen
2
15
Máy bơm nước
2
16
Máy kéo, rải dây
2
17
Máy ép dây thủy lực
4
18
Điện thoại
2

List of construction items:

Form No. 01B. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1
Xây tường = đá hộc; vữa M75 (dày ≤ 60cm; cao ≤ 2m)
1217.44
m3
Theo quy định tại Chương V
2
Đá lắt mặt đầu mương & đá xây mặt bằng móng
47.4
m3
Theo quy định tại Chương V
3
Lỗ thoát nước trên thân kè
132
lỗ
Theo quy định tại Chương V
4
San gạt mặt bằng móng = máy đào 1,25m3, đất cấp 2
6148
m3
Theo quy định tại Chương V
5
Đào chân kè & mương thoát nước, đất cấp 2
477.3
m3
Theo quy định tại Chương V
6
Đắp đất mái taluy âm
4125.7
m3
Theo quy định tại Chương V
7
Tháo ra lắp lại và thu hồi
Theo quy định tại Chương V
8
Tháo hạ thu hồi dây nhôm lõi thép ACSR-330/43
5.39
km
Theo quy định tại Chương V
9
Tháo hạ thu hồi dây hợp kim nhôm lõi thép PHLOX-116.2
0.15
km
Theo quy định tại Chương V
10
Tháo hạ thu hồi chuỗi néo dây chống sét PHLOX-116.2
4
cái
Theo quy định tại Chương V
11
Tháo hạ thu hồi chuỗi néo dây cáp quang OPGW-90
2
cái
Theo quy định tại Chương V
12
Tháo hạ lắp lại chuỗi đỡ lèo dây dẫn ĐL70-1x26
12
chuỗi
Theo quy định tại Chương V
13
Tháo hạ lắp lại chuỗi néo kép dây dẫn NK300-2x30
12
chuỗi
Theo quy định tại Chương V
14
Chuỗi néo kép dây dẫn vào thanh cái
6
chuỗi
Theo quy định tại Chương V
15
Hộp nối cáp quang NMOC/OPGW90
1
Hộp
Theo quy định tại Chương V
16
Khung định vị trong khoảng cột
24
Cái
Theo quy định tại Chương V
17
Khung định vị dây lèo
30
Cái
Theo quy định tại Chương V
18
Căng lại dây dẫn, dây chống sét, dây cáp quang từ vị trí G70 đến cột cuối đầu tư mới (Đường dây 500kV Chơn Thành - Cầu Bông)
2.9
km
Theo quy định tại Chương V
19
Tháo hạ, căng lại dây cáp quang: OPGW-90
0.774
km
Theo quy định tại Chương V
20
NỐI ĐẤT CẢM ỨNG ĐIỆN TỪ
Theo quy định tại Chương V
21
Gia công chế tạo chi tiết tiếp địa mạ kẽm
243
bộ
Theo quy định tại Chương V
22
Kéo rải và lắp tiếp địa chống cảm ứng điện từ
243
bộ
Theo quy định tại Chương V
23
LẮP ĐẶT VẬT TƯ PHẦN ĐIỆN ĐƯỜNG DÂY 500 kV (Vật tư A cấp, nhà thầu lắp đặt hoàn chỉnh tại công trường)
Theo quy định tại Chương V
24
Dây dẫn điện nhôm lõi thép: ACSR-400/51
395.0196
km
Theo quy định tại Chương V
25
Dây dẫn điện nhôm lõi thép: ACSR-330/43
3.8431
km
Theo quy định tại Chương V
26
Dây chống sét: PHLOX-116,2
19.2745
km
Theo quy định tại Chương V
27
Chống rung dây dẫn ACSR-400/51: CRd
1
Theo quy định tại Chương V
28
Khung định vị dây dẫn ACSR-400/51: KĐV-D
1
Theo quy định tại Chương V
29
Khung định vị dây lèo ACSR-400/51: KĐV-L
1
Theo quy định tại Chương V
30
Ống nối dây dẫn ACSR-400/51: ONd
1
Theo quy định tại Chương V
31
Ống vá dây dẫn ACSR-400/51: OVd
1
Theo quy định tại Chương V
32
Chống rung dây chống sét: CRs
1
Theo quy định tại Chương V
33
Chuỗi đỡ dây chống sét: ĐCS
31
bộ
Theo quy định tại Chương V
34
Chuỗi néo dây chống sét: NCS
34
bộ
Theo quy định tại Chương V
35
Ống nối dây chống sét: ONs
1
Theo quy định tại Chương V
36
Ống vá dây chống sét: OVs
1
Theo quy định tại Chương V
37
Khóa néo ép ACSR-330/43
18
Cái
Theo quy định tại Chương V
38
Tạ bù cho chuỗi đỡ lèo; loại 25kg: TB-200
66
bộ
Theo quy định tại Chương V
39
Đèn cảm ứng cảnh báo tĩnh không: ĐBK-1A
54
bộ
Theo quy định tại Chương V
40
Đèn cảm ứng cảnh báo tĩnh không: ĐBK-1B
108
bộ
Theo quy định tại Chương V
41
Đèn cảnh báo đường thuỷ: ĐBĐT
2
bộ
Theo quy định tại Chương V
42
Chuỗi cách điện đỡ lèo: ĐL70-1x26
66
chuỗi
Theo quy định tại Chương V
43
Chuỗi cách điện đỡ đơn: ĐĐ210-1x23
108
chuỗi
Theo quy định tại Chương V
44
Chuỗi cách điện đỡ kép: ĐK210-2x23
42
chuỗi
Theo quy định tại Chương V
45
Chuỗi cách điện đỡ đơn: ĐĐ300-1x23
12
chuỗi
Theo quy định tại Chương V
46
Chuỗi cách điện néo kép: NK400-2x25
108
chuỗi
Theo quy định tại Chương V
47
Chuỗi néo dây dẫn vào thanh cái: NKTC400-2x25
12
chuỗi
Theo quy định tại Chương V
48
Dây cáp quang 24 sợi: OPGW-90
17.3382
km
Theo quy định tại Chương V
49
Hộp nối cáp quang 24 sợi (gồm giá đỡ): OPGW-90/OPGW-90
6
hộp
Theo quy định tại Chương V
50
Hộp nối cáp quang 24 sợi (gồm giá đỡ): NMOC/OPGW-90
2
hộp
Theo quy định tại Chương V

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Package 11: Line construction and installation". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Package 11: Line construction and installation" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 29

You did not use the site, Click here to remain logged. Timeout: 60 second