Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors THC INVESTMENT JOINT STOCK COMPANY as follows:
- Has relationships with 7 project owners.
- Has relationships with 58 contractor.
- Announced 4 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 31 contractor selection plans with a total of 110 bidding packages, of which 8 prequalification documents have not found the investment project.
- Has invited bids for 65 packages (with 75 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 57 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 1 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 67 packages that have not fully posted the contractor selection results. Of these 67 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.35 contractors.
- Breakdown by bidding field: Goods 22.67%, Construction 45.33%, Consultancy 26.67%, Non-consultancy 4.00%, Mixed 0%, Other fields 1.33%.
- The total value according to the packages with valid contractor selection results is: 392,393,285,171 VND, of which the total winning bid value is: 388,829,699,744 VND.
- The savings rate is: 0.91%.
Data analysis results of DauThau.info software for bid solicitors THC INVESTMENT JOINT STOCK COMPANY as follows:
- Has relationships with 58 contractor.
- The average number of contractors participating in each bidding package is: 1.35 contractors.
- Proportion of bidding fields: Goods 22.67%, Construction 45.33%, Consulting 26.67%, Non-consulting 4.00%, Mixed 0%, Other 1.33%.
- The total value according to the bidding package with valid IMP is: 392,393,285,171 VND, in which the total winning value is: 388,829,699,744 VND.
- The savings rate is: 0.91%.
This Bid solicitor is also an investor. The analysis results of data for the investor THC INVESTMENT JOINT STOCK COMPANY are as follows:
- Is the investor of 4 development investment projects.
- Is the investor of 3 contractor selection plans, of which 3 were self-published, and 0 were published by other entities.
- Is the investor of 5 Tender Notices, of which 5 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 81 bidding packages, of which 78 were won, 3 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 93.17% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.94% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Ninh Bình (15), Bắc Ninh (12), Hà Nội (8), Phú Thọ (7), Huế (6), Lào Cai (2), Hưng Yên (2), Thái Nguyên (2), (2), Điện Biên (1), Đà Nẵng (1), Quảng Ninh (1), Undefined (22)
- Provinces before the merger where the contractor has participated in bidding : Ninh Bình (14), Bắc Giang (10), Hà Nội (8), Phú Thọ (7), Huế (6), Hưng Yên (2), Thái Nguyên (2), Bắc Ninh (2), Yên Bái (1), Lào Cai (1), Điện Biên (1), Quảng Nam (1), Quảng Ninh (1), Nam Định (1), Undefined (24)
- Has relationships with 28 Bid Solicitors
- Has competed against 5 contractors in 3 bidding packages, won 0 packages, lost 3 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 1 contractors in 3 bidding packages, won 0 packages, lost 3 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 121 bidding packages with 25 roles.
- Name of construction organization: CÔNG TY CỔ PHẦN ĐẦU TƯ THC
- Code of capacity certificate of construction activities: 00027733
- Issuer: Sở kế hoạch đầu tư Thành phố Hà Nội
- Fields:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Đường bộ
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: NN & PTNT
⚬ Giám sát thi công xây dựng công trình: Dân dụng
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: Cầu, đường bộ
⚬ Thi công xây dựng công trình: Công nghiệp nhẹ
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package No. 1: Consulting Surveying, designing construction drawings and construction cost estimates of the investor THC INVESTMENT JOINT STOCK COMPANY.
29/07/2022 14:54
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package 11 (Construction and installation of Duc Tam village road to good village - Nu village) of the investor THC INVESTMENT JOINT STOCK COMPANY.
25/07/2022 17:17
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package 06: Supply and installation of air conditioning system of the investor THC INVESTMENT JOINT STOCK COMPANY.
25/07/2022 17:13
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package number 05: Supply of generators of the investor THC INVESTMENT JOINT STOCK COMPANY.
25/07/2022 17:02
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package 03: Supply and installation of furniture + reception desk of the investor THC INVESTMENT JOINT STOCK COMPANY.
25/07/2022 16:56
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package 04: Supply and installation of elevators of the investor THC INVESTMENT JOINT STOCK COMPANY.
25/07/2022 16:51
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package 05: Construction and installation of the investor THC INVESTMENT JOINT STOCK COMPANY.
25/07/2022 16:47
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package No. 01: Construction of the investor THC INVESTMENT JOINT STOCK COMPANY.
25/07/2022 16:41
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package 05: Construction + equipment of the investor THC INVESTMENT JOINT STOCK COMPANY.
25/07/2022 16:38
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package 6: Construction + equipment of the investor THC INVESTMENT JOINT STOCK COMPANY.
25/07/2022 16:26
The data sheet has been partially hidden, to see the full information please Login or Register
THC INVESTMENT JOINT STOCK COMPANY announced the results of the bid package Package No. 06: Renting transmission channels for Cameras .
- Winning bidder: VIETTEL GROUP
22/11/2024 10:47
THC INVESTMENT JOINT STOCK COMPANY announced the results of the bidding package Tender package No 06: Renting transmission channels for Cameras with 1 participating contractors .
31/10/2024 10:16
THC INVESTMENT JOINT STOCK COMPANY announced the results of the bid package Package No. 02: Consulting on supply of goods and construction .
- Winning bidder: Viettel Consultancy and Services Joint stock Company, SILVER SEA JOINT STOCK COMPANY
29/10/2024 15:40
THC INVESTMENT JOINT STOCK COMPANY publishes Tender Notice Tender package No 06: Renting transmission channels for Cameras in the form Competitive Offer .
24/10/2024 14:14
THC INVESTMENT JOINT STOCK COMPANY announced the results of the bidding package Tender package No 02: Consulting on supply of goods and construction with 1 participating contractors .
15/10/2024 10:26
THC INVESTMENT JOINT STOCK COMPANY announced the results of the bid package Bidding package No. 3: Procurement of security uniforms for the Militia and Self-Defense Force in 2024 .
- Winning bidder: X20 JOINT STOCK COMPANY
10/10/2024 11:22
THC INVESTMENT JOINT STOCK COMPANY announced the results of the bid package Bidding package No. 03: Procurement of support tools for mobile militia forces in 2024 .
- Winning bidder: HHT TECHNOLOGY IMPORT EXPORT JOINT STOCK COMPANY
01/10/2024 17:08
THC INVESTMENT JOINT STOCK COMPANY publishes Tender Notice Tender package No 02: Consulting on supply of goods and construction in the form Open bidding .
27/09/2024 17:32
THC INVESTMENT JOINT STOCK COMPANY announced the results of the bidding package Bidding package No. 3: Procurement of security uniforms for the Militia and Self-Defense Force in 2024 with 1 participating contractors .
25/09/2024 09:06
THC INVESTMENT JOINT STOCK COMPANY announced the results of the bid package Bidding package No. 3: Procurement of security support tools for the Militia and Self-Defense Force in 2024 .
- Winning bidder: SOFTECH TRADING LIMITED COMPANY, ALPHAGROUP CORPORATION
18/09/2024 08:36
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package No. 1: Consulting Surveying, designing construction drawings and construction cost estimates of the investor THC INVESTMENT JOINT STOCK COMPANY.
29/07/2022 14:54
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package 11 (Construction and installation of Duc Tam village road to good village - Nu village) of the investor THC INVESTMENT JOINT STOCK COMPANY.
25/07/2022 17:17
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package 06: Supply and installation of air conditioning system of the investor THC INVESTMENT JOINT STOCK COMPANY.
25/07/2022 17:13
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package number 05: Supply of generators of the investor THC INVESTMENT JOINT STOCK COMPANY.
25/07/2022 17:02
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package 03: Supply and installation of furniture + reception desk of the investor THC INVESTMENT JOINT STOCK COMPANY.
25/07/2022 16:56
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package 04: Supply and installation of elevators of the investor THC INVESTMENT JOINT STOCK COMPANY.
25/07/2022 16:51
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package 05: Construction and installation of the investor THC INVESTMENT JOINT STOCK COMPANY.
25/07/2022 16:47
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package No. 01: Construction of the investor THC INVESTMENT JOINT STOCK COMPANY.
25/07/2022 16:41
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package 05: Construction + equipment of the investor THC INVESTMENT JOINT STOCK COMPANY.
25/07/2022 16:38
The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package 6: Construction + equipment of the investor THC INVESTMENT JOINT STOCK COMPANY.
25/07/2022 16:26
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s THC INVESTMENT JOINT STOCK COMPANY has posted 31 of the contractor selection plan, which contains 110 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted 75 Tender Notices in 65 bidding packages. Among these, 2 Tender Notices were self-invited, and 73 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has posted 57 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 57 package, canceled the bid 0 package (among the bidding packages above).
- There are 1 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has a relationship with 58 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor THC INVESTMENT JOINT STOCK COMPANY has a relationship with 21 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity THC INVESTMENT JOINT STOCK COMPANY has a relationship with 11 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects