Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã Nam Hưng as follows:
- Has relationships with 5 project owners.
- Has relationships with 11 contractor.
- Announced 23 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 14 contractor selection plans with a total of 46 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 6 packages (with 8 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 16 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 10 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 28 packages that have not fully posted the contractor selection results. Of these 28 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 87.50%, Consultancy 12.50%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 15,578,114,000 VND, of which the total winning bid value is: 15,384,730,000 VND.
- The savings rate is: 1.24%.
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã Nam Hưng as follows:
- Has relationships with 11 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 87.50%, Consulting 12.50%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 15,578,114,000 VND, in which the total winning value is: 15,384,730,000 VND.
- The savings rate is: 1.24%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ủy ban nhân dân xã Nam Hưng are as follows:
- Is the investor of 23 development investment projects.
- Is the investor of 23 contractor selection plans, of which 7 were self-published, and 16 were published by other entities.
- Is the investor of 24 Tender Notices, of which 7 were self-invited, and 17 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor HUNG THINH CONSTRUCTION CONSULTING AND TRADING SERVICE COMPANY LIMITED has posted the results of the bidding package Package No. 03: Construction of the investor Ủy ban nhân dân xã Nam Hưng.
- Winning bidder: DAC CONSULTANCY INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY
26/12/2024 10:48
Bid solicitor HUNG THINH CONSTRUCTION CONSULTING AND TRADING SERVICE COMPANY LIMITED has posted Tender Notice Tender package No 03: Construction of the investor Ủy ban nhân dân xã Nam Hưng with the form Competitive Offer.
16/12/2024 17:04
Investor Ủy ban nhân dân xã Nam Hưng has posted an investment and development project Urgent repair to overcome the consequences after storm No. 03 (Yagi) of the cultural house of Trung Nghia village, Nam Hung commune in 2024.
06/12/2024 19:19
The Bid solicitor Ủy ban nhân dân xã Nam Hưng has posted the request Urgent repair to overcome the consequences after storm No. 03 (Yagi) of the cultural house of Trung Nghia village, Nam Hung commune in 2024 of the investor Ủy ban nhân dân xã Nam Hưng with 4 bidding package.
06/12/2024 19:16
The Bid solicitor Ủy ban nhân dân xã Nam Hưng has posted the request Urgent repair to overcome the consequences after storm No. 03 (Yagi) of the cultural house of Trung Nghia village, Nam Hung commune of the investor Ủy ban nhân dân xã Nam Hưng with 4 bidding package.
06/12/2024 17:55
Investor Ủy ban nhân dân xã Nam Hưng has posted an investment and development project Urgent repair to overcome the consequences after storm No. 03 (Yagi) of the cultural house of Trung Nghia village, Nam Hung commune.
06/12/2024 17:17
The Bid solicitor Ủy ban nhân dân xã Nam Hưng has posted the results of the bidding package Package 03: Advice on detailed planning 1/500 scale of the investor Ủy ban nhân dân xã Nam Hưng.
- Winning bidder: SONG HONG ENVIRONMENT AND RESOURCES, ARCHITECTURE JOINT STOCK COMPANY
27/09/2024 10:11
Bid solicitor Ủy ban nhân dân xã Nam Hưng has posted Tender Notice Tender package No 03: Consulting on detailed planning at 1/500 scale of the investor Ủy ban nhân dân xã Nam Hưng with the form Open bidding.
19/08/2024 17:35
The Bid solicitor Ủy ban nhân dân xã Nam Hưng has posted the request Project contractor selection plan: Prepare a detailed planning project at 1/500 scale to build the central area of Nam Hung commune, Tien Lang district of the investor Ủy ban nhân dân xã Nam Hưng with 3 bidding package.
15/08/2024 19:01
The Bid solicitor Ủy ban nhân dân xã Nam Hưng has posted the results of the bidding package Package 03: Project Management Consulting of the investor Ủy ban nhân dân xã Nam Hưng.
10/08/2022 09:38
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân xã Nam Hưng publishes the plan Urgent repair to overcome the consequences after storm No. 03 (Yagi) of the cultural house of Trung Nghia village, Nam Hung commune in 2024 with 4 bidding package .
06/12/2024 19:16
Ủy ban nhân dân xã Nam Hưng publishes the plan Urgent repair to overcome the consequences after storm No. 03 (Yagi) of the cultural house of Trung Nghia village, Nam Hung commune with 4 bidding package .
06/12/2024 17:55
Ủy ban nhân dân xã Nam Hưng announced the results of the bid package Package 03: Advice on detailed planning 1/500 scale .
- Winning bidder: SONG HONG ENVIRONMENT AND RESOURCES, ARCHITECTURE JOINT STOCK COMPANY
27/09/2024 10:11
Ủy ban nhân dân xã Nam Hưng announced the results of the bidding package Tender package No 03: Consulting on detailed planning at 1/500 scale with 1 participating contractors .
06/09/2024 10:13
Ủy ban nhân dân xã Nam Hưng publishes Tender Notice Tender package No 03: Consulting on detailed planning at 1/500 scale in the form Open bidding .
19/08/2024 17:35
Ủy ban nhân dân xã Nam Hưng publishes the plan Project contractor selection plan: Prepare a detailed planning project at 1/500 scale to build the central area of Nam Hung commune, Tien Lang district with 3 bidding package .
15/08/2024 19:01
Ủy ban nhân dân xã Nam Hưng announced the results of the bid package Package 03: Project Management Consulting .
- Winning bidder: Công ty Cổ phần Tư vấn Sông Lam
10/08/2022 09:38
Ủy ban nhân dân xã Nam Hưng announced the results of the bid package Tender package No 04: Construction supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNG H&T 89
10/08/2022 09:35
Ủy ban nhân dân xã Nam Hưng announced the results of the bid package Package 02: Construction cost (the whole construction part) .
- Winning bidder: Công ty TNHH Xây dựng thương mại Văn Bảo
10/08/2022 09:30
Ủy ban nhân dân xã Nam Hưng publishes the plan Plan to select construction contractor: Renovate the yard and repaint the classroom of a kindergarten in Nam Hung commune, Nam Dan district with 3 bidding package .
05/08/2022 09:15
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor HUNG THINH CONSTRUCTION CONSULTING AND TRADING SERVICE COMPANY LIMITED has posted the results of the bidding package Package No. 03: Construction of the investor Ủy ban nhân dân xã Nam Hưng.
- Winning bidder: DAC CONSULTANCY INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY
26/12/2024 10:48
Bid solicitor HUNG THINH CONSTRUCTION CONSULTING AND TRADING SERVICE COMPANY LIMITED has posted Tender Notice Tender package No 03: Construction of the investor Ủy ban nhân dân xã Nam Hưng with the form Competitive Offer.
16/12/2024 17:04
Investor Ủy ban nhân dân xã Nam Hưng has posted an investment and development project Urgent repair to overcome the consequences after storm No. 03 (Yagi) of the cultural house of Trung Nghia village, Nam Hung commune in 2024.
06/12/2024 19:19
The Bid solicitor Ủy ban nhân dân xã Nam Hưng has posted the request Urgent repair to overcome the consequences after storm No. 03 (Yagi) of the cultural house of Trung Nghia village, Nam Hung commune in 2024 of the investor Ủy ban nhân dân xã Nam Hưng with 4 bidding package.
06/12/2024 19:16
The Bid solicitor Ủy ban nhân dân xã Nam Hưng has posted the request Urgent repair to overcome the consequences after storm No. 03 (Yagi) of the cultural house of Trung Nghia village, Nam Hung commune of the investor Ủy ban nhân dân xã Nam Hưng with 4 bidding package.
06/12/2024 17:55
Investor Ủy ban nhân dân xã Nam Hưng has posted an investment and development project Urgent repair to overcome the consequences after storm No. 03 (Yagi) of the cultural house of Trung Nghia village, Nam Hung commune.
06/12/2024 17:17
The Bid solicitor Ủy ban nhân dân xã Nam Hưng has posted the results of the bidding package Package 03: Advice on detailed planning 1/500 scale of the investor Ủy ban nhân dân xã Nam Hưng.
- Winning bidder: SONG HONG ENVIRONMENT AND RESOURCES, ARCHITECTURE JOINT STOCK COMPANY
27/09/2024 10:11
Bid solicitor Ủy ban nhân dân xã Nam Hưng has posted Tender Notice Tender package No 03: Consulting on detailed planning at 1/500 scale of the investor Ủy ban nhân dân xã Nam Hưng with the form Open bidding.
19/08/2024 17:35
The Bid solicitor Ủy ban nhân dân xã Nam Hưng has posted the request Project contractor selection plan: Prepare a detailed planning project at 1/500 scale to build the central area of Nam Hung commune, Tien Lang district of the investor Ủy ban nhân dân xã Nam Hưng with 3 bidding package.
15/08/2024 19:01
The Bid solicitor Ủy ban nhân dân xã Nam Hưng has posted the results of the bidding package Package 03: Project Management Consulting of the investor Ủy ban nhân dân xã Nam Hưng.
10/08/2022 09:38
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy ban nhân dân xã Nam Hưng has posted 14 of the contractor selection plan, which contains 46 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ủy ban nhân dân xã Nam Hưng has posted 8 Tender Notices in 6 bidding packages. Among these, 8 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân xã Nam Hưng has posted 16 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 16 package, canceled the bid 0 package (among the bidding packages above).
- There are 10 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy ban nhân dân xã Nam Hưng has a relationship with 11 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân xã Nam Hưng has a relationship with 8 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ủy ban nhân dân xã Nam Hưng has a relationship with 5 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects