Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
10:26 AM 11/18/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
10:55 AM 12/21/2022 |
Active |
At the request of QTHT |
|
12:03 AM 01/13/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
3:57 PM 01/16/2023 |
Active |
At the request of QTHT |
|
3:48 AM 04/02/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
6:00 AM 04/12/2023 |
Active |
At the request of QTHT |
|
11:30 PM 01/25/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
3:20 PM 01/26/2024 |
Active |
At the request of QTHT |
|
12:05 AM 12/11/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
9:00 AM 12/13/2024 |
Active |
At the request of QTHT |
|
12:05 AM 04/29/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
8:55 AM 04/29/2025 |
Active |
At the request of QTHT |
|
12:05 AM 06/29/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
9:25 AM 06/30/2025 |
Active |
At the request of QTHT |
|
12:05 AM 08/26/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
9:17 AM 08/26/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors BINH MINH TELECOMMUNICATIONS TECHNOLOGY APPLICATION JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 58 bidding packages, of which 41 were won, 15 were lost, 1 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 64.8% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.69% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đà Nẵng (4), Bắc Ninh (1), Hà Nội (40), TP.Hồ Chí Minh (3), Quảng Ninh (3), Nationwide (1), Phú Thọ (1), Undefined (8)
- Provinces before the merger where the contractor has participated in bidding : Quảng Nam (3), Bắc Ninh (1), Hà Nội (40), TP.Hồ Chí Minh (3), Đà Nẵng (1), Quảng Ninh (3), Nationwide (1), Undefined (9)
- Has relationships with 31 Bid Solicitors
- Has relationships with 27 Bid Investors
- Has competed against 51 contractors in 50 bidding packages, won 34 packages, lost 14 packages, 1 are pending results, and 1 were canceled.
- Has collaborated with 17 contractors in 8 bidding packages, won 7 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 1 | 0% |
| Lower by 10% to 20% | 3 | 0% |
| Lower by 5% to 10% | 2 | 0% |
| Lower by 1% to 5% | 10 | 0% |
| Lower by 0% to 1% | 10 | 0% |
| 0% | 14 | 0% |
| Higher by 0% to 1% | 0 | |
| Higher by 1% to 5% | 1 | 0% |
| Higher by 5% to 10% | 0 | |
| Higher by 10% or more | 0 | |
| Unknown | 0 | |
| Total | 41 | 100% |
BINH MINH TELECOMMUNICATIONS TECHNOLOGY APPLICATION JOINT STOCK COMPANY Won the bidding for the Upgrade LAN and Wifi infrastructure package, which was invited for bidding by the VĂN PHÒNG HĐND VÀ UBND PHƯỜNG TỪ LIÊM through an as an independent entity.
- Result: Won
18/07/2026 09:21
BINH MINH TELECOMMUNICATIONS TECHNOLOGY APPLICATION JOINT STOCK COMPANY Won the bidding for the Providing machinery and equipment for the project "Building a smart tourism management model at Hung Temple Historical Relic Area" package, which was invited for bidding by the Khu di tích lịch sử Đền Hùng through an as an independent entity.
- Result: Won
27/12/2025 15:18
BINH MINH TELECOMMUNICATIONS TECHNOLOGY APPLICATION JOINT STOCK COMPANY Won the bidding for the Installing and cabling for LAN and Camera systems at the Library Building package, which was invited for bidding by the FOREIGN TRADE UNIVERSITY through an as an independent entity.
- Result: Won
24/12/2025 09:26
BINH MINH TELECOMMUNICATIONS TECHNOLOGY APPLICATION JOINT STOCK COMPANY Won the bidding for the Adding and upgrading wifi and fiber optic cables in houses A1, B2, B3, C2 package, which was invited for bidding by the University of Languages and International Studies through an as an independent entity.
- Result: Won
15/12/2025 09:00
BINH MINH TELECOMMUNICATIONS TECHNOLOGY APPLICATION JOINT STOCK COMPANY Won the bidding for the Package No. 12: Construction and installation costs, fire protection, wastewater treatment, gas system, procurement and installation of all project equipment package, which was invited for bidding by the Ủy ban nhân dân xã Phú Xuyên through an as sub-joint of Liên danh xây lắp bệnh viện đa khoa huyện Phú Xuyên.
- Result: Won
25/11/2025 10:53
BINH MINH TELECOMMUNICATIONS TECHNOLOGY APPLICATION JOINT STOCK COMPANY Won the bidding for the Package No. 06: Infrastructure investment in service of information technology application activities package, which was invited for bidding by the Bac Thang Long hospital through an as sub-joint of Liên danh nhà thầu BMA - C&U.
- Result: Won
18/11/2025 15:15
BINH MINH TELECOMMUNICATIONS TECHNOLOGY APPLICATION JOINT STOCK COMPANY Won the bidding for the Repair and purchase additional equipment to troubleshoot network problems at Foreign Trade University package, which was invited for bidding by the FOREIGN TRADE UNIVERSITY through an as an independent entity.
- Result: Won
23/10/2025 17:46
BINH MINH TELECOMMUNICATIONS TECHNOLOGY APPLICATION JOINT STOCK COMPANY Won the bidding for the Shopping and installation of paper -free meeting room equipment package, which was invited for bidding by the Văn phòng HĐND và UBND xã Thiên Lộc through an as an independent entity.
- Result: Won
10/10/2025 15:55
BINH MINH TELECOMMUNICATIONS TECHNOLOGY APPLICATION JOINT STOCK COMPANY Won the bidding for the Buy copyright of Windows Server operating system, Copyright for Microsoft SQL Server database management software for physics and copyright Software Solution Security Solutions The end point for the Cloud Server of Edusoft Software package, which was invited for bidding by the FOREIGN TRADE UNIVERSITY through an as an independent entity.
- Result: Won
15/08/2025 12:18
BINH MINH TELECOMMUNICATIONS TECHNOLOGY APPLICATION JOINT STOCK COMPANY Won the bidding for the Buy additional and deploying the installation of wifi system k package, which was invited for bidding by the FOREIGN TRADE UNIVERSITY through an as an independent entity.
- Result: Won
12/08/2025 17:09
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder BINH MINH TELECOMMUNICATIONS TECHNOLOGY APPLICATION JOINT STOCK COMPANY participated in 58 package, of which 41 package was won, failed 15 packages, 1 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BINH MINH TELECOMMUNICATIONS TECHNOLOGY APPLICATION JOINT STOCK COMPANY is related to 31 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BINH MINH TELECOMMUNICATIONS TECHNOLOGY APPLICATION JOINT STOCK COMPANY has a relationship with 42 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BINH MINH TELECOMMUNICATIONS TECHNOLOGY APPLICATION JOINT STOCK COMPANY competed with 51 contractors in 50 package, won 34 package, lost 14 package, 1 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor BINH MINH TELECOMMUNICATIONS TECHNOLOGY APPLICATION JOINT STOCK COMPANY once entered into a partnership with 17 contractors in 8 package, won bid 7 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor BINH MINH TELECOMMUNICATIONS TECHNOLOGY APPLICATION JOINT STOCK COMPANY participated in bidding in 6 provinces/cities, 1 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor BINH MINH TELECOMMUNICATIONS TECHNOLOGY APPLICATION JOINT STOCK COMPANY participated in bidding in 6 provinces/cities, 1 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,243 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor