Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:05 AM 01/31/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
2:37 PM 02/03/2025 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors GCOM TECHNOLOGY JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 269 bidding packages, of which 176 were won, 74 were lost, 8 are pending results, and 11 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 50.04% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 96.74% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (61), Lâm Đồng (25), Hưng Yên (25), Tuyên Quang (22), Phú Thọ (16), Ninh Bình (16), TP.Hồ Chí Minh (13), Hải Phòng (12), Nghệ An (10), Đà Nẵng (10), Lai Châu (9), Thanh Hoá (9), Sơn La (8), Quảng Ninh (8), Lạng Sơn (6), Khánh Hòa (5), Bắc Ninh (5), Thái Nguyên (5), Đắk Lắk (3), Đồng Nai (3), Lào Cai (3), Quảng Trị (3), Gia Lai (2), Nationwide (2), Điện Biên (2), Cao Bằng (1), Vĩnh Long (1), Cần Thơ (1), Huế (1), An Giang (1), Cà Mau (1), Hà Tĩnh (1), Undefined (19)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (61), Bình Thuận (17), Thái Bình (16), Tuyên Quang (11), Hà Giang (10), Hải Dương (10), Nghệ An (10), Lai Châu (9), TP.Hồ Chí Minh (9), Thanh Hoá (9), Sơn La (8), Quảng Ninh (8), Ninh Bình (8), Đà Nẵng (8), Hòa Bình (7), Lạng Sơn (6), Hưng Yên (5), Hà Nam (5), Bà Rịa - Vũng Tàu (4), Nam Định (4), Khánh Hòa (4), Đắk Lắk (3), Lâm Đồng (3), Phú Thọ (3), Vĩnh Phúc (3), Bắc Giang (3), Thái Nguyên (3), Đồng Nai (2), Gia Lai (2), Lào Cai (2), Bắc Ninh (2), Quảng Nam (2), Hải Phòng (2), Điện Biên (2), Bắc Kạn (2), Cao Bằng (1), Trà Vinh (1), Nationwide (1), Cần Thơ (1), Quảng Bình (1), Huế (1), Bình Định (1), Phú Yên (1), Kiên Giang (1), Cà Mau (1), Hà Tĩnh (1), Yên Bái (1), Undefined (58)
- Has relationships with 103 Bid Solicitors
- Has competed against 210 contractors in 198 bidding packages, won 109 packages, lost 68 packages, 14 are pending results, and 7 were canceled.
- Has collaborated with 32 contractors in 90 bidding packages, won 78 packages, lost 6 packages, 5 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 1 bidding packages with 1 roles.
- Building organization name: CÔNG TY CỔ PHẦN CÔNG NGHỆ GCOM
- Construction capacity certificate code: 00056789
- Issuing Authority: Sở kế hoạch đầu tư thành phố Hà Nội
- Field:
⚬ Thi công xây dựng công trình: Công nghiệp Đường dây & TBA
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 15 | 8.5% |
| Lower by 10% to 20% | 19 | 10.8% |
| Lower by 5% to 10% | 63 | 35.8% |
| Lower by 1% to 5% | 48 | 27.3% |
| Lower by 0% to 1% | 25 | 14.2% |
| 0% | 0 | 0% |
| Higher by 0% to 1% | 1 | 0.6% |
| Higher by 1% to 5% | 5 | 2.8% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 176 | 100% |
GCOM TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Npcba1.t2cl.110kv.g06: Experimental correction experiments, configuration, SCADA signal connection station package, which was invited for bidding by the Ban Quản lý dự án Lưới điện - Tổng công ty Điện lực miền Bắc through an Open bidding as sub-joint of Liên danh CL.
- Result: Won
12/01/2026 11:08
GCOM TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the DC.G10: Experimental adjustment of 110KV TBTB and providing control software at the station and SCADA system configuration package, which was invited for bidding by the BAN QUẢN LÝ DỰ ÁN XÂY DỰNG ĐIỆN MIỀN BẮC - CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN BẮC through an Open bidding as sub-joint of Liên danh ĐC.
- Result: Won
07/01/2026 10:35
GCOM TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Providing software control system software, correction experiments, configuration and connection of SCADA signal full TBA and Line parameters package, which was invited for bidding by the Ban Quản lý dự án Lưới điện - Tổng công ty Điện lực miền Bắc through an Open bidding as sub-joint of Liên danh TS.
- Result: Won
30/12/2025 10:24
GCOM TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the YT.G14: Provides integrated software control at the station and configuration of SCADA system package, which was invited for bidding by the BAN QUẢN LÝ DỰ ÁN XÂY DỰNG ĐIỆN MIỀN BẮC - CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN BẮC through an Open bidding as sub-joint of Liên danh YT.
- Result: Won
25/12/2025 16:22
GCOM TECHNOLOGY JOINT STOCK COMPANY lost the bidding for the License renewal and technical support services for Cyber Ark privileged account management software package, which was invited for bidding by the VIETNAM - RUSSIA JOINT VENTURE BANK through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Lost
23/12/2025 10:01
GCOM TECHNOLOGY JOINT STOCK COMPANY lost the bidding for the Package 86: Supply equipment and installation projects upgrading telecommunications infrastructure and information technology system of electricity market system Vinh Tan 4 package, which was invited for bidding by the through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Lost
17/12/2025 09:11
GCOM TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Procurement of LED screens/TVs for rooms/areas in the factory package, which was invited for bidding by the PETROVIETNAM POWER GENERATION BRANCH - VIETNAM OIL AND GAS GROUP through an Competitive Offer as an independent entity. Two other contractors also participated.
- Result: Won
16/12/2025 09:19
GCOM TECHNOLOGY JOINT STOCK COMPANY lost the bidding for the Procurement of a notification system and secure information exchange package, which was invited for bidding by the Cục Công nghệ thông tin through an Open bidding as an independent entity. One other contractors also participated.
- Result: Lost
15/12/2025 15:29
GCOM TECHNOLOGY JOINT STOCK COMPANY Won the bidding for the Number 10: Providing integrated software control at the station and configuration of SCADA system, telecommunications -Project: Line and TBA 110kV Thanh Mien 2, Hai Duong Province package, which was invited for bidding by the Ban quản lý dự án phát triển Điện lực through an Open bidding as sub-joint of Liên danh TM.
- Result: Won
15/12/2025 15:15
GCOM TECHNOLOGY JOINT STOCK COMPANY lost the bidding for the Bidding package No. 01: Procurement of equipment for design survey work package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN CÔNG NGHỆ GCOM. Three other contractors also participated.
- Result: Lost
15/12/2025 09:40
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder GCOM TECHNOLOGY JOINT STOCK COMPANY participated in 269 package, of which 176 package was won, failed 74 packages, 8 packages with no results, 11 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor GCOM TECHNOLOGY JOINT STOCK COMPANY is related to 103 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor GCOM TECHNOLOGY JOINT STOCK COMPANY competed with 210 contractors in 198 package, won 109 package, lost 68 package, 14 bidding package has no results, 7 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor GCOM TECHNOLOGY JOINT STOCK COMPANY once entered into a partnership with 32 contractors in 90 package, won bid 78 package, lost 6 package, 5 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor GCOM TECHNOLOGY JOINT STOCK COMPANY participated in bidding in 31 provinces/cities, 2 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor GCOM TECHNOLOGY JOINT STOCK COMPANY participated in bidding in 46 provinces/cities, 1 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,725 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor