Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors POWER ENGINEERING SYSTEMS JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 249 bidding packages, of which 110 were won, 115 were lost, 12 are pending results, and 12 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 22.6% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 78.22% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (53), Đà Nẵng (51), Quảng Ngãi (22), Lâm Đồng (11), TP.Hồ Chí Minh (10), Phú Thọ (10), Hưng Yên (9), Ninh Bình (8), Lào Cai (8), Huế (8), Gia Lai (7), Hải Phòng (7), Tuyên Quang (6), Đắk Lắk (6), Quảng Ninh (6), Nghệ An (6), Tây Ninh (5), Quảng Trị (5), Cần Thơ (5), Khánh Hòa (5), Thanh Hoá (5), Hà Tĩnh (4), Bắc Ninh (4), Đồng Nai (3), Lai Châu (3), Thái Nguyên (3), Sơn La (3), Lạng Sơn (2), Điện Biên (1), Nationwide (1), Undefined (20)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (53), Đà Nẵng (44), Quảng Ngãi (18), Huế (8), TP.Hồ Chí Minh (7), Đắk Nông (7), Kon Tum (6), Quảng Nam (6), Gia Lai (6), Quảng Ninh (6), Nghệ An (6), Hòa Bình (5), Hải Dương (5), Thanh Hoá (5), Hà Giang (4), Nam Định (4), Lào Cai (4), Đắk Lắk (4), Cần Thơ (4), Hà Tĩnh (4), Bắc Giang (4), Long An (3), Bà Rịa - Vũng Tàu (3), Hải Phòng (3), Quảng Trị (3), Vĩnh Phúc (3), Lai Châu (3), Hà Nam (3), Khánh Hòa (3), Bắc Ninh (3), Hưng Yên (3), Sơn La (3), Đồng Nai (2), Tuyên Quang (2), Tây Ninh (2), Bình Định (2), Ninh Bình (2), Thái Bình (2), Quảng Bình (2), Lạng Sơn (2), Bình Thuận (1), Bắc Kạn (1), Lâm Đồng (1), Điện Biên (1), Thái Nguyên (1), Yên Bái (1), Undefined (36)
- Has relationships with 93 Bid Solicitors
- Has relationships with 49 Bid Investors
- Has competed against 217 contractors in 188 bidding packages, won 56 packages, lost 114 packages, 9 are pending results, and 9 were canceled.
- Has collaborated with 21 contractors in 35 bidding packages, won 18 packages, lost 14 packages, 2 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 1 bidding packages with 1 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 20 | 18.2% |
| Lower by 10% to 20% | 15 | 13.6% |
| Lower by 5% to 10% | 22 | 20% |
| Lower by 1% to 5% | 18 | 16.4% |
| Lower by 0% to 1% | 27 | 24.5% |
| 0% | 0 | 0% |
| Higher by 0% to 1% | 1 | 0.9% |
| Higher by 1% to 5% | 1 | 0.9% |
| Higher by 5% to 10% | 2 | 1.8% |
| Higher by 10% or more | 4 | 3.6% |
| Unknown | 0 | 0% |
| Total | 110 | 100% |
POWER ENGINEERING SYSTEMS JOINT STOCK COMPANY Won the bidding for the Package 8: Supply and transport the most VTTB package, which was invited for bidding by the NATIONAL POWER TRANSMISSION CORPORATION through an Open bidding as an independent entity.
- Result: Won
28/08/2026 15:07
POWER ENGINEERING SYSTEMS JOINT STOCK COMPANY join for the Tender package No 05: Supply and transportation of the first VTTB package, which was invited for bidding by the Power Transmission Company No 3 through an Open bidding as an independent entity. Four other contractors also participated.
21/08/2026 09:10
POWER ENGINEERING SYSTEMS JOINT STOCK COMPANY Won the bidding for the Repair, replace and upgrade equipment of the PACiS System to serve the management, monitoring and control of the 220kV station of Nhon Trach 1 Power Plant package, which was invited for bidding by the PETROVIETNAM POWER CORPORATION through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Won
20/08/2026 16:40
POWER ENGINEERING SYSTEMS JOINT STOCK COMPANY Won the bidding for the Package No. 9: Providing and transporting the secondary school and information vttb package, which was invited for bidding by the NATIONAL POWER TRANSMISSION CORPORATION through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Won
18/06/2026 15:05
POWER ENGINEERING SYSTEMS JOINT STOCK COMPANY Won the bidding for the Package 10: Providing equipment and software of the computer control system package, which was invited for bidding by the NATIONAL POWER TRANSMISSION CORPORATION through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Won
11/06/2026 15:52
POWER ENGINEERING SYSTEMS JOINT STOCK COMPANY lost the bidding for the Package BESS.G06: Supply, transport and installation of energy storage systems for substations in Hung Yen province package, which was invited for bidding by the NORTHERN POWER CORPORATION through an Open bidding as an independent entity. Twelve other contractors also participated.
- Result: Lost
04/06/2026 11:26
POWER ENGINEERING SYSTEMS JOINT STOCK COMPANY lost the bidding for the HH02- MSTS2026: Providing equipment and services to upgrade DCS system computer software package, which was invited for bidding by the THAI BINH THERMAL POWER COMPANY through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
19/05/2026 11:16
POWER ENGINEERING SYSTEMS JOINT STOCK COMPANY Won the bidding for the Package No. 03: Supply and installation of 110kV distribution yard expansion equipment - Na Duong Thermal Power Plant package, which was invited for bidding by the NA DUONG THERMAL POWER COMPANY - BRANCH OF VINACOMIN - POWER HOLDING CORPORATION through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Won
12/05/2026 14:24
POWER ENGINEERING SYSTEMS JOINT STOCK COMPANY lost the bidding for the Providing materials and equipment for major repairs of the Turbine System and auxiliary equipment of Unit S1 - O Mon I Thermal Power Plant in 2026 package, which was invited for bidding by the CANTHO THERMAL POWER COMPANY - BRANCH OF POWER GENERATION JOINT STOCK CORPORATION 2 through an Open bidding as an independent entity. Five other contractors also participated.
- Result: Lost
05/05/2026 07:55
POWER ENGINEERING SYSTEMS JOINT STOCK COMPANY join for the Package No. 03: Supply and installation of 110kV distribution yard expansion equipment - Na Duong Thermal Power Plant package, which was invited for bidding by the NA DUONG THERMAL POWER COMPANY - BRANCH OF VINACOMIN - POWER HOLDING CORPORATION through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Tender opening completed
04/05/2026 10:01
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder POWER ENGINEERING SYSTEMS JOINT STOCK COMPANY participated in 249 package, of which 110 package was won, failed 115 packages, 12 packages with no results, 12 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor POWER ENGINEERING SYSTEMS JOINT STOCK COMPANY is related to 93 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor POWER ENGINEERING SYSTEMS JOINT STOCK COMPANY has a relationship with 49 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor POWER ENGINEERING SYSTEMS JOINT STOCK COMPANY competed with 217 contractors in 188 package, won 56 package, lost 114 package, 9 bidding package has no results, 9 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor POWER ENGINEERING SYSTEMS JOINT STOCK COMPANY once entered into a partnership with 21 contractors in 35 package, won bid 18 package, lost 14 package, 2 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor POWER ENGINEERING SYSTEMS JOINT STOCK COMPANY participated in bidding in 29 provinces/cities, 1 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor POWER ENGINEERING SYSTEMS JOINT STOCK COMPANY participated in bidding in 46 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,201 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor