Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for contractors DHAN GROUP JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 14 bidding packages, of which 12 were won, 0 were lost, 2 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 99.48% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 100% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Bắc Cạn (6), Cao Bằng (1), Undefined (7)
- Has relationships with 11 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Building organization name: CÔNG TY CP DHAN GROUP
- Construction capacity certificate code: 00063401
- Issuing Authority: Sở kế hoạch đầu tư thành phố Hà Nội
- Field:
⚬ Lập quy hoạch xây dựng: Lập quy hoạch XD
⚬ Khảo sát xây dựng: Khảo sát XD/Địa hình
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng
⚬ Giám sát thi công xây dựng công trình: Dân dụng
⚬ Giám sát thi công xây dựng công trình: Giao thông Cầu, đường bộ
⚬ Giám sát thi công xây dựng công trình: NN & PTNT Thủy lợi, đê điều
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 0 | 0% |
Lower by 10% to 20% | 0 | 0% |
Lower by 5% to 10% | 0 | 0% |
Lower by 1% to 5% | 0 | 0% |
Lower by 0% to 1% | 0 | 0% |
0% | 12 | 100% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 0 | 0% |
Unknown | 0 | 0% |
Total | 12 | 100% |
DHAN GROUP JOINT STOCK COMPANY join for the Bring boundary markers to the field and prepare documents according to the geographic information system (GIS) project Adjusting and expanding the general construction planning of Yen Lac town, Na Ri district, Bac Kan province in the period of 2021 - 2030 , oriented to 2050 package, which was invited for bidding by the Phòng kinh tế và hạ tầng huyện Na Rì, tỉnh Bắc Kạn through an Open bidding as master consortium of CÔNG TY CP DHAN GROUP.
25/10/2024 08:49
DHAN GROUP JOINT STOCK COMPANY Won the bidding for the Consulting on preparing detailed planning projects for rural residential areas and preparing planning documents according to the geographic information system GIS package, which was invited for bidding by the ỦY BAN NHÂN DÂN XÃ CÔN MINH through an assign shorthand as an independent entity.
- Result: Won
07/10/2024 14:49
DHAN GROUP JOINT STOCK COMPANY Won the bidding for the Consulting on preparing detailed planning projects for rural residential areas and preparing planning documents according to the geographic information system GIS package, which was invited for bidding by the Ủy ban nhân dân Xã Cường Lợi through an assign shorthand as an independent entity.
- Result: Won
07/10/2024 14:41
DHAN GROUP JOINT STOCK COMPANY Won the bidding for the Bringing boundary markers to the field for the general construction planning of Kim Lu commune, Na Ri district, Bac Kan province for the period up to 2030 package, which was invited for bidding by the ỦY BAN NHÂN DÂN XÃ KIM LƯ through an assign shorthand as an independent entity.
- Result: Won
25/09/2024 10:44
DHAN GROUP JOINT STOCK COMPANY Won the bidding for the Bringing boundary markers to the field for the general construction planning of Liem Thuy commune, Na Ri district, Bac Kan province for the period up to 2030 package, which was invited for bidding by the Ủy ban nhân dân xã Liêm Thủy, huyện Na Rì, tỉnh Bắc Kạn through an assign shorthand as an independent entity.
- Result: Won
25/09/2024 09:31
DHAN GROUP JOINT STOCK COMPANY Won the bidding for the Bringing boundary markers to the field for the general construction planning of Xuan Duong commune, Na Ri district, Bac Kan province for the period up to 2030 package, which was invited for bidding by the Ủy ban nhân dân xã Xuân Dương, huyện Na Rì, tỉnh Bắc Kạn through an assign shorthand as an independent entity.
- Result: Won
25/09/2024 09:06
DHAN GROUP JOINT STOCK COMPANY join for the Planning land use in 2025 in Bao Lam district package, which was invited for bidding by the PHÒNG TÀI NGUYÊN & MÔI TRƯỜNG through an Open bidding as an independent entity.
24/09/2024 11:45
DHAN GROUP JOINT STOCK COMPANY Won the bidding for the General planning for construction of Mai Lap commune, Cho Moi district, Bac Kan province for the period up to 2030 package, which was invited for bidding by the UBND XÃ MAI LẠP through an assign shorthand as an independent entity.
- Result: Won
12/12/2023 08:49
DHAN GROUP JOINT STOCK COMPANY Won the bidding for the Measurement for GPM, compensation, support and resettlement Project: Stabilizing the population of Na Sai, Khau La, Na Lang, Nam Ngoai hamlets, Mong An commune, Bao Lam district, Cao Bang province package, which was invited for bidding by the PHÒNG TÀI NGUYÊN & MÔI TRƯỜNG through an assign shorthand as an independent entity.
- Result: Won
02/11/2023 20:03
DHAN GROUP JOINT STOCK COMPANY Won the bidding for the Consulting on land use planning in 2024 Na Ri district package, which was invited for bidding by the Phòng Tài nguyên và Môi trường huyện Na Rì through an assign bid as an independent entity.
- Result: Won
28/09/2023 18:05
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder DHAN GROUP JOINT STOCK COMPANY participated in 14 package, of which 12 package was won, failed 0 packages, 2 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DHAN GROUP JOINT STOCK COMPANY is related to 11 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor DHAN GROUP JOINT STOCK COMPANY participated in bidding in 2 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,772 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code