Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:00 AM 01/07/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
4:33 PM 01/10/2023 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors CÔNG TY TNHH LỘC THIÊN are as follows:
You need to Login or Sign up to view all informations.
- Participated in 156 bidding packages, of which 43 were won, 103 were lost, 5 are pending results, and 5 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 39.55% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 95.06% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Quảng Ngãi (115), Gia Lai (5), Đà Nẵng (5), Hà Nội (4), Đồng Nai (3), TP.Hồ Chí Minh (2), An Giang (1), Phú Thọ (1), Lào Cai (1), Đồng Tháp (1), Undefined (18)
- Provinces before the merger where the contractor has participated in bidding : Quảng Ngãi (100), Đà Nẵng (4), Hà Nội (4), Đồng Nai (3), Bình Định (2), Gia Lai (1), Kiên Giang (1), Hòa Bình (1), Lào Cai (1), Quảng Nam (1), Bà Rịa - Vũng Tàu (1), Đồng Tháp (1), TP.Hồ Chí Minh (1), Undefined (35)
- Has relationships with 77 Bid Solicitors
- Has relationships with 41 Bid Investors
- Has competed against 383 contractors in 142 bidding packages, won 29 packages, lost 103 packages, 5 are pending results, and 5 were canceled.
- Has collaborated with 50 contractors in 60 bidding packages, won 14 packages, lost 45 packages, 0 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 1 bidding packages with 1 roles.
- Building organization name: Công ty TNHH Lộc Thiên
- Construction capacity certificate code: 00003124
- Issuing Authority: Sở Kế hoạch và Đầu tư Quảng Ngãi
- Field:
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thi công xây dựng công trình: Giao thông cầu, đường bộ
⚬ Thi công xây dựng công trình: Thủy lợi
⚬ Thi công xây dựng công trình: Dân dụng.
⚬ Thi công xây dựng công trình: Đường dây và trạm biến áp.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 3 | 7% |
| Lower by 10% to 20% | 13 | 30.2% |
| Lower by 5% to 10% | 7 | 16.3% |
| Lower by 1% to 5% | 4 | 9.3% |
| Lower by 0% to 1% | 14 | 32.6% |
| 0% | 0 | 0% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 2 | 4.7% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 43 | 100% |
CÔNG TY TNHH LỘC THIÊN lost the bidding for the Tender package No 03: Construction work package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình dân dụng và công nghiệp tỉnh Quảng Ngãi through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
03/04/2026 14:45
CÔNG TY TNHH LỘC THIÊN lost the bidding for the Package 08: Construction and installation of construction equipment package, which was invited for bidding by the Văn phòng Hội đồng nhân dân và Ủy ban nhân dân xã Ba Tơ through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Lost
02/04/2026 15:32
CÔNG TY TNHH LỘC THIÊN Won the bidding for the Procurement of housing equipment for barracks, kitchens and collective canteens at the command center of Quang Ngai Provincial Police package, which was invited for bidding by the Công an tỉnh Quảng Ngãi through an Competitive Offer as an independent entity. Five other contractors also participated.
- Result: Won
21/03/2026 10:33
CÔNG TY TNHH LỘC THIÊN join for the Procurement of housing equipment for barracks, kitchens and collective canteens at the command center of Quang Ngai Provincial Police package, which was invited for bidding by the Công an tỉnh Quảng Ngãi through an Competitive Offer as an independent entity. Five other contractors also participated.
- Result: Tender opening completed
14/03/2026 08:01
CÔNG TY TNHH LỘC THIÊN join for the Package 08: Construction and installation of construction equipment package, which was invited for bidding by the Văn phòng Hội đồng nhân dân và Ủy ban nhân dân xã Ba Tơ through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Tender opening completed
02/03/2026 15:22
CÔNG TY TNHH LỘC THIÊN lost the bidding for the Tender package No 01: Construction work package, which was invited for bidding by the Phòng Kinh tế xã Đông Sơn through an Open bidding as master consortium of CÔNG TY TNHH LỘC THIÊN. Thirteen other contractors also participated.
- Result: Lost
19/01/2026 14:17
CÔNG TY TNHH LỘC THIÊN lost the bidding for the Package No. 12: Construction and installation of interior equipment package, which was invited for bidding by the Báo và Phát thanh, Truyền hình Quảng Ngãi through an Open bidding as an independent entity. Five other contractors also participated.
- Result: Lost
27/12/2025 07:55
CÔNG TY TNHH LỘC THIÊN lost the bidding for the Construction and installation of construction equipment package, which was invited for bidding by the Viện kiểm sát nhân dân tỉnh Quảng Ngãi through an Open bidding as master consortium of CÔNG TY TNHH LỘC THIÊN. Five other contractors also participated.
- Result: Lost
25/12/2025 15:13
CÔNG TY TNHH LỘC THIÊN lost the bidding for the Civil Works package, which was invited for bidding by the The Management Unit of Projects and Clearance in Economic Zone Area through an Open bidding as sub-joint of CÔNG TY TNHH LỘC THIÊN. Four other contractors also participated.
- Result: Lost
25/12/2025 11:43
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CÔNG TY TNHH LỘC THIÊN participated in 156 package, of which 43 package was won, failed 103 packages, 5 packages with no results, 5 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TNHH LỘC THIÊN is related to 77 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TNHH LỘC THIÊN has a relationship with 41 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TNHH LỘC THIÊN competed with 383 contractors in 142 package, won 29 package, lost 103 package, 5 bidding package has no results, 5 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor CÔNG TY TNHH LỘC THIÊN once entered into a partnership with 50 contractors in 60 package, won bid 14 package, lost 45 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor CÔNG TY TNHH LỘC THIÊN participated in bidding in 10 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CÔNG TY TNHH LỘC THIÊN participated in bidding in 13 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 72,215 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor