Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:23 AM 10/16/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
3:17 PM 12/13/2022 |
Active |
At the request of QTHT |
|
10:15 PM 12/31/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
3:50 PM 02/13/2023 |
Active |
At the request of QTHT |
|
7:32 AM 04/02/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
1:57 PM 06/02/2023 |
Active |
At the request of QTHT |
|
12:02 AM 06/18/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
3:19 PM 08/01/2023 |
Active |
At the request of QTHT |
|
12:55 AM 09/17/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
2:37 PM 10/10/2023 |
Active |
At the request of QTHT |
|
11:31 PM 03/22/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:21 PM 04/10/2024 |
Active |
At the request of QTHT |
|
1:58 AM 07/01/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
7:54 PM 12/14/2024 |
Active |
At the request of QTHT |
|
2:14 AM 04/01/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
3:57 PM 05/05/2025 |
Active |
At the request of QTHT |
|
9:31 AM 04/01/2026 |
Pause |
Temporarily suspended due to overdue fees |
|
3:29 PM 06/15/2026 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 263 are as follows:
You need to Login or Sign up to view all informations.
- Participated in 18 bidding packages, of which 18 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 94.99% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.61% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Nghệ An (16), Undefined (2)
- Provinces before the merger where the contractor has participated in bidding : Nghệ An (16), Undefined (2)
- Has relationships with 10 Bid Solicitors
- Has relationships with 14 Bid Investors
- Has competed against 1 contractors in 17 bidding packages, won 17 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 1 contractors in 1 bidding packages, won 1 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 2 bidding packages with 3 roles.
- Building organization name: Công ty cổ phần tư vấn và xây dựng 263
- Construction capacity certificate code: 00032213
- Issuing Authority: Sở Kế hoạch và Đầu tư Nghệ An
- Field:
⚬ Thi công xây dựng công trình: Dân dụng
⚬ Thi công xây dựng công trình: Giao thông Cầu, đường bộ
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thi công xây dựng công trình: Nông nghiệp và PTNT Thủy lợi
⚬ Giám sát thi công xây dựng công trình: Dân dụng
⚬ Giám sát thi công xây dựng công trình: Công nghiệp
⚬ Giám sát thi công xây dựng công trình: Giao thông Cầu, đường bộ
⚬ Giám sát thi công xây dựng công trình: Nông nghiệp và PTNT Thủy lợi
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông Cầu, đường bộ
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Nông nghiệp và PTNT Thủy lợi
⚬ Khảo sát xây dựng: Khảo sát địa hình
⚬ Khảo sát xây dựng: Khảo sát địa chất
⚬ Lập quy hoạch xây dựng:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật
⚬ Quản lý dự án đầu tư xây dựng: Dân dụng
⚬ Quản lý dự án đầu tư xây dựng: Công nghiệp
⚬ Quản lý dự án đầu tư xây dựng: Giao thông Cầu, đường bộ
⚬ Quản lý dự án đầu tư xây dựng: Nông nghiệp & PTNT Thủy lợi
⚬ Quản lý dự án đầu tư xây dựng: Hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: Nông nghiệp & PTNT
⚬ Thi công xây dựng công trình: Nông nghiệp & PTNT
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 0 | |
| Lower by 10% to 20% | 0 | |
| Lower by 5% to 10% | 3 | 0% |
| Lower by 1% to 5% | 0 | |
| Lower by 0% to 1% | 7 | 0% |
| 0% | 8 | 0% |
| Higher by 0% to 1% | 0 | |
| Higher by 1% to 5% | 0 | |
| Higher by 5% to 10% | 0 | |
| Higher by 10% or more | 0 | |
| Unknown | 0 | |
| Total | 18 | 100% |
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 263 Won the bidding for the Consultancy on verification of KTKT . reports package, which was invited for bidding by the Ban quản lý rừng phòng hộ Kỳ Sơn through an as an independent entity.
- Result: Won
28/07/2026 10:57
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 263 Won the bidding for the Supply and installation of door systems, partitions, dismantling of materials and equipment at the Obstetrics Department, Neonatal Intensive Care Department, Nghe An Obstetrics and Pediatrics Hospital package, which was invited for bidding by the Bệnh viện Sản Nhi Nghệ An through an as an independent entity.
- Result: Won
15/06/2026 16:25
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 263 Won the bidding for the Consulting on surveying and preparing the Technical Audit Report for construction works: Maintenance and repair of forestry nurseries, Nam Nghe An Protection Forest Management Board package, which was invited for bidding by the Ban quan ly rung phong ho Nam Nghe An through an as an independent entity.
- Result: Won
18/05/2026 14:47
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 263 Won the bidding for the Package No. 01: Consulting, surveying, making economic and technical reports package, which was invited for bidding by the UBND XÃ THẦN LĨNH through an as an independent entity.
- Result: Won
24/02/2026 11:09
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 263 Won the bidding for the Package 04: The entire construction and installation part of the work package, which was invited for bidding by the Ủy ban nhân dân xã Hưng Nguyên Nam through an as an independent entity.
- Result: Won
10/01/2026 13:30
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 263 Won the bidding for the Package No. 03: The whole construction part package, which was invited for bidding by the People's Committee of Hung Nguyen Commune, Nghe An Province through an as an independent entity.
- Result: Won
13/12/2025 17:38
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 263 Won the bidding for the Package No. 03: The whole construction part package, which was invited for bidding by the People's Committee of Hung Nguyen Commune, Nghe An Province through an as an independent entity.
- Result: Won
13/12/2025 16:50
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 263 Won the bidding for the Tender package No 01: The entire construction and installation part package, which was invited for bidding by the Trường Mầm non Nguyễn Huệ through an as an independent entity.
- Result: Won
05/05/2025 10:12
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 263 Won the bidding for the Repair roof of motorbike parking staff of Nghe An Pediatric Hospital package, which was invited for bidding by the Bệnh viện Sản Nhi Nghệ An through an as an independent entity.
- Result: Won
08/04/2025 16:07
CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 263 Won the bidding for the Package No. 01: repairing rooms 218, 219, 220, Building A1 (testing area) to install medical equipment package, which was invited for bidding by the Bệnh viện Sản Nhi Nghệ An through an as an independent entity.
- Result: Won
10/01/2025 16:26
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 263 participated in 18 package, of which 18 package was won, failed 0 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 263 is related to 10 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 263 has a relationship with 14 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 263 competed with 1 contractors in 17 package, won 17 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 263 once entered into a partnership with 1 contractors in 1 package, won bid 1 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 263 participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY 263 participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,075 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor