Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
1:11 AM 11/25/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
9:39 PM 12/04/2022 |
Active |
At the request of QTHT |
|
6:03 PM 12/05/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
6:17 PM 12/11/2022 |
Active |
At the request of QTHT |
|
12:01 AM 01/05/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
8:12 AM 01/05/2023 |
Active |
At the request of QTHT |
|
3:54 PM 04/02/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
10:24 AM 04/05/2023 |
Active |
At the request of QTHT |
|
12:01 AM 04/26/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
9:21 AM 04/26/2023 |
Active |
At the request of QTHT |
|
12:05 AM 12/10/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
8:32 AM 12/10/2024 |
Active |
At the request of QTHT |
|
12:05 AM 07/10/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
9:09 AM 07/10/2025 |
Active |
At the request of QTHT |
|
12:05 AM 12/15/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
2:07 AM 12/15/2025 |
Active |
At the request of QTHT |
|
12:05 AM 05/05/2026 |
Pause |
Temporarily suspended due to overdue fees |
|
12:19 PM 05/05/2026 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors ENTECH INVESTMENT JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 34 bidding packages, of which 20 were won, 10 were lost, 4 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 38.08% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 73.81% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Thanh Hoá (7), TP.Hồ Chí Minh (3), Lâm Đồng (8), Hải Phòng (5), Quảng Ninh (3), Lạng Sơn (1), Khánh Hòa (1), Gia Lai (2), Vĩnh Long (1), Lai Châu (1), Quảng Ngãi (1), Undefined (2)
- Provinces before the merger where the contractor has participated in bidding : Thanh Hoá (7), Bà Rịa - Vũng Tàu (1), Bình Thuận (2), Hải Phòng (4), Quảng Ninh (3), Lâm Đồng (4), TP.Hồ Chí Minh (1), Hải Dương (1), Lạng Sơn (1), Ninh Thuận (1), Gia Lai (2), Trà Vinh (1), Lai Châu (1), Kon Tum (1), Undefined (6)
- Has relationships with 18 Bid Solicitors
- Has relationships with 12 Bid Investors
- Has competed against 34 contractors in 29 bidding packages, won 17 packages, lost 9 packages, 3 are pending results, and 0 were canceled.
- Has collaborated with 2 contractors in 5 bidding packages, won 3 packages, lost 1 packages, 1 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 15 bidding packages with 10 roles.
- Building organization name: CÔNG TY CỔ PHẦN ĐẦU TƯ ENTECH
- Construction capacity certificate code: 00058041
- Issuing Authority: Sở kế hoạch đầu tư thành phố Hà Nội
- Field:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Cơ - điện
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 10 | 0% |
| Lower by 10% to 20% | 3 | 0% |
| Lower by 5% to 10% | 1 | 0% |
| Lower by 1% to 5% | 3 | 0% |
| Lower by 0% to 1% | 3 | 0% |
| 0% | 0 | |
| Higher by 0% to 1% | 0 | |
| Higher by 1% to 5% | 0 | |
| Higher by 5% to 10% | 0 | |
| Higher by 10% or more | 0 | |
| Unknown | 0 | |
| Total | 20 | 100% |
ENTECH INVESTMENT JOINT STOCK COMPANY Won the bidding for the Package 01TV-CBDA-VANCACHLY-2026: Consulting on preparation of F/S for project of installing isolation valves and auxiliary equipment for testing boiler pipe pressure package, which was invited for bidding by the NGHI SƠN THERMAL POWER COMPANY through an as an independent entity.
- Result: Won
11/08/2026 16:46
ENTECH INVESTMENT JOINT STOCK COMPANY join for the Tender package No 3TV-DCSNS1-2025: Consulting on supervision of equipment installation, verification of Technical Design Documents, verification of Technical Design Documentation Project to upgrade DCS control system and sub-station control systems - Nghi Son 1 Thermal Power Plant package, which was invited for bidding by the NGHI SƠN THERMAL POWER COMPANY through an as an independent entity. Two other contractors also participated.
03/08/2026 15:29
ENTECH INVESTMENT JOINT STOCK COMPANY Won the bidding for the 15TV-SCL-2026: Consulting on survey, preparation of PAKT, SCL estimate of Dong Nai 3 and Dong Nai 4 Hydropower Plant transmission system package, which was invited for bidding by the CHI NHÁNH TỔNG CÔNG TY PHÁT ĐIỆN 1 - CÔNG TY THỦY ĐIỆN ĐỒNG NAI through an as an independent entity. Two other contractors also participated.
- Result: Won
27/05/2026 18:41
ENTECH INVESTMENT JOINT STOCK COMPANY Won the bidding for the Consulting on surveying and preparing a report to select technical options for renovating and upgrading the exhaust gas treatment system (NOx) for F6 gas turbine units of Ba Ria Thermal Power Joint Stock Company package, which was invited for bidding by the BARIA THERMAL POWER JOINT STOCK COMPANY through an as an independent entity. Three other contractors also participated.
- Result: Won
23/04/2026 14:07
ENTECH INVESTMENT JOINT STOCK COMPANY Won the bidding for the 04TV-DTAaininh-2025: Consulting on supervision of construction and installation of investment project equipment to upgrade the speeding system of Dai Ninh Hydroelectric Plant Group package, which was invited for bidding by the EVNGENCO1 Projects Management Board - The Branch of Power Generation Corporation 1 through an as an independent entity. One other contractors also participated.
- Result: Won
14/11/2025 14:54
ENTECH INVESTMENT JOINT STOCK COMPANY Won the bidding for the 02TV-CBDA-DCSNS1-2025: Consulting on verification of the BCNCKT project upgrade the DCS control system and the control systems-NMDD 1 package, which was invited for bidding by the THERMAL POWER PROJECT MANAGEMENT BOARD 3 - BRANCH OF POWER GENERATION CORPORATION 1 through an as an independent entity.
- Result: Won
29/08/2025 14:53
ENTECH INVESTMENT JOINT STOCK COMPANY join for the 04TV-DTAaininh-2025: Consulting on supervision of construction and installation of investment project equipment to upgrade the speeding system of Dai Ninh Hydroelectric Plant Group package, which was invited for bidding by the EVNGENCO1 Projects Management Board - The Branch of Power Generation Corporation 1 through an as an independent entity. One other contractors also participated.
29/08/2025 14:24
ENTECH INVESTMENT JOINT STOCK COMPANY Won the bidding for the Bidding package 01TV-CBDA-LDBDNS-2025: Consulting on setting up the BCKTKT BCKTKT OIL PUMP SETTING PROJECTS OILS DIRECTORS TUABIN NEWS NOTE 1 & 2 NEW NEW package, which was invited for bidding by the NGHI SƠN THERMAL POWER COMPANY through an as an independent entity.
- Result: Won
30/07/2025 11:14
ENTECH INVESTMENT JOINT STOCK COMPANY Won the bidding for the 02TV-CBDA-SCADAUB-2024: Consulting on verifying the technical and economic report of the project Upgrading and renovating the SCADA system to meet the IEC60870-5-104 communication protocol for Uong Bi Thermal Power Plant package, which was invited for bidding by the UONG BI THERMAL POWER COMPANY through an as an independent entity.
- Result: Won
25/03/2025 13:21
ENTECH INVESTMENT JOINT STOCK COMPANY Won the bidding for the TV/2025-01: Consulting on preparing technical and economic reports for construction investment projects in 2025 - Ialy Hydropower Company. package, which was invited for bidding by the CÔNG TY THUỶ ĐIỆN IALY - CHI NHÁNH TẬP ĐOÀN ĐIỆN LỰC VIỆT NAM through an as an independent entity. Two other contractors also participated.
- Result: Won
15/03/2025 18:10
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder ENTECH INVESTMENT JOINT STOCK COMPANY participated in 34 package, of which 20 package was won, failed 10 packages, 4 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor ENTECH INVESTMENT JOINT STOCK COMPANY is related to 18 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor ENTECH INVESTMENT JOINT STOCK COMPANY has a relationship with 21 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor ENTECH INVESTMENT JOINT STOCK COMPANY competed with 34 contractors in 29 package, won 17 package, lost 9 package, 3 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor ENTECH INVESTMENT JOINT STOCK COMPANY once entered into a partnership with 2 contractors in 5 package, won bid 3 package, lost 1 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor ENTECH INVESTMENT JOINT STOCK COMPANY participated in bidding in 11 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor ENTECH INVESTMENT JOINT STOCK COMPANY participated in bidding in 14 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,202 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor