Data analysis results of DauThau.info software for contractors LILAMA 69-1 PHALAI JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 301 bidding packages, of which 176 were won, 100 were lost, 12 are pending results, and 13 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 34.24% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 90.83% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Quảng Ninh (76), Hải Dương (66), Bắc Giang (19), Hải Phòng (17), Thái Nguyên (5), Quảng Nam (4), Bình Thuận (3), Ninh Bình (3), Trà Vinh (2), Phú Thọ (2), Thái Bình (1), Hà Nội (1), Lạng Sơn (1), Undefined (101)
- Has relationships with 34 Bid Solicitors
- Has competed against 181 contractors in 192 bidding packages, won 73 packages, lost 96 packages, 13 are pending results, and 10 were canceled.
- Has collaborated with 40 contractors in 81 bidding packages, won 61 packages, lost 15 packages, 1 are pending results, and 4 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 36 | 20.5% |
Lower by 10% to 20% | 15 | 8.5% |
Lower by 5% to 10% | 22 | 12.5% |
Lower by 1% to 5% | 31 | 17.6% |
Lower by 0% to 1% | 63 | 35.8% |
0% | 4 | 2.3% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 1 | 0.6% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 4 | 2.3% |
Unknown | 0 | 0% |
Total | 176 | 100% |
LILAMA 69-1 PHALAI JOINT STOCK COMPANY join for the Repair 3A/3D coal crushing system package, which was invited for bidding by the HAI PHONG THERMAL POWER JOINT STOCK COMPANY through an Open bidding as an independent entity. One other contractors also participated.
12/10/2024 10:37
LILAMA 69-1 PHALAI JOINT STOCK COMPANY Won the bidding for the Supply of materials for coal crushing system of unit No. 4 + unit No. 2 and overhaul of coal crushing system of unit No. 2 (outsourced) + overhaul of coal crushing system of unit No. 4 package, which was invited for bidding by the HAI PHONG THERMAL POWER JOINT STOCK COMPANY through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN CÔNG NGHIỆP NẶNG THÀNH CÔNG.
- Result: Won
19/09/2024 15:56
LILAMA 69-1 PHALAI JOINT STOCK COMPANY Won the bidding for the Replace left and right wall steam generation pipes and other thin worn locations for boiler 3A, boiler 3B - Major repair plan for 2023 (forwarded to 2024) Pha Lai Thermal Power Joint Stock Company package, which was invited for bidding by the PhaLai Thermal Power Joint Stock Company through an Open bidding as master consortium of CÔNG TY CỔ PHẦN LILAMA 69-1 PHẢ LẠI. Four other contractors also participated.
- Result: Won
09/09/2024 17:47
LILAMA 69-1 PHALAI JOINT STOCK COMPANY Won the bidding for the Overhaul of railway coal supply line (including equipment: Conveyors 15; 16; 17; 18) - Major repair plan in 2024 Pha Lai Thermal Power Joint Stock Company package, which was invited for bidding by the PhaLai Thermal Power Joint Stock Company through an Open bidding as an independent entity.
- Result: Won
31/08/2024 14:46
LILAMA 69-1 PHALAI JOINT STOCK COMPANY Won the bidding for the Package No. 10: Providing boiler repair services and auxiliary equipment in 2024 package, which was invited for bidding by the CAM PHA THERMAL POWER COMPANY - BRANCH OF VINACOMIN - POWER HOLDING CORPORATION through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN DỊCH VỤ CÔNG NGHIỆP NĂNG LƯỢNG MIS.
- Result: Won
28/08/2024 17:20
LILAMA 69-1 PHALAI JOINT STOCK COMPANY lost the bidding for the Overhaul of railway coal supply line (Quang over the carriage) - Major repair plan in 2023 (transitioned to 2024) Pha Lai Thermal Power Joint Stock Company package, which was invited for bidding by the PhaLai Thermal Power Joint Stock Company through an Open bidding as an independent entity.
- Result: Lost
27/08/2024 16:51
LILAMA 69-1 PHALAI JOINT STOCK COMPANY Won the bidding for the Repair and replacement of pipe heaters for unit No. 2 of Son Dong Thermal Power Plant package, which was invited for bidding by the SON DONG THERMAL POWER COMPANY-BRANCH OF VINACOMIN-POWER HOLDING CORPORATION through an Open bidding as master consortium of CÔNG TY CỔ PHẦN LILAMA 69-1 PHẢ LẠI. Two other contractors also participated.
- Result: Won
21/08/2024 16:29
LILAMA 69-1 PHALAI JOINT STOCK COMPANY join for the Overhaul of river conveyor line A, river conveyor line B, coal supply to furnace line A (Including conveyors 1A,2A,3A,4A,5, Tripper 1A) - Major repair plan in 2023 (transferred continued in 2024) Pha Lai Thermal Power Joint Stock Company package, which was invited for bidding by the PhaLai Thermal Power Joint Stock Company through an Open bidding as an independent entity. Five other contractors also participated.
14/08/2024 10:09
LILAMA 69-1 PHALAI JOINT STOCK COMPANY lost the bidding for the Package No. 4: Providing major repair services for Boiler No. 2, Furnace smoke system 2, Furnace fly ash transportation and disposal system No. 2, Furnace electrostatic dust filtration system No. 2, Furnace dust blowing system No. 2 package, which was invited for bidding by the DONG TRIEU THERMAL POWER COMPANY - BRANCH OF VINACOMIN - POWER HOLDING CORPORATION through an Open bidding as an independent entity.
- Result: Lost
26/07/2024 14:00
LILAMA 69-1 PHALAI JOINT STOCK COMPANY Won the bidding for the Package No. 5: Providing major repair services for turbine-generator system of unit 2 and auxiliary equipment package, which was invited for bidding by the DONG TRIEU THERMAL POWER COMPANY - BRANCH OF VINACOMIN - POWER HOLDING CORPORATION through an Open bidding as an independent entity.
- Result: Won
26/07/2024 11:24
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder LILAMA 69-1 PHALAI JOINT STOCK COMPANY participated in 301 package, of which 176 package was won, failed 100 packages, 12 packages with no results, 13 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor LILAMA 69-1 PHALAI JOINT STOCK COMPANY is related to 34 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor LILAMA 69-1 PHALAI JOINT STOCK COMPANY competed with 181 contractors in 192 package, won 73 package, lost 96 package, 13 bidding package has no results, 10 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor LILAMA 69-1 PHALAI JOINT STOCK COMPANY once entered into a partnership with 40 contractors in 81 package, won bid 61 package, lost 15 package, 1 bidding package has no results, 4 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor LILAMA 69-1 PHALAI JOINT STOCK COMPANY participated in bidding in 13 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,710 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code