Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:04 AM 11/07/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
4:55 PM 11/13/2023 |
Active |
At the request of QTHT |
|
12:05 AM 04/16/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
10:06 AM 04/16/2024 |
Active |
At the request of QTHT |
|
12:05 AM 06/01/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
4:26 PM 06/03/2024 |
Active |
At the request of QTHT |
|
12:05 AM 01/25/2026 |
Pause |
Temporarily suspended due to overdue fees |
|
4:33 PM 01/28/2026 |
Active |
At the request of QTHT |
|
12:05 AM 03/06/2026 |
Pause |
Temporarily suspended due to overdue fees |
|
2:56 PM 03/10/2026 |
Active |
At the request of QTHT |
|
9:32 AM 04/01/2026 |
Pause |
Temporarily suspended due to overdue fees |
|
5:35 PM 04/06/2026 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors NHAT LINH 689 CONSTRUCTION COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 136 bidding packages, of which 60 were won, 63 were lost, 5 are pending results, and 8 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 87.54% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 100.4% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Lạng Sơn (72), Thanh Hoá (18), Ninh Bình (18), Hà Tĩnh (7), Thái Nguyên (4), Hưng Yên (4), Nghệ An (3), Sơn La (3), Phú Thọ (2), Tuyên Quang (1), Undefined (4)
- Provinces before the merger where the contractor has participated in bidding : Lạng Sơn (72), Thanh Hoá (18), Hà Nam (15), Hà Tĩnh (7), Hưng Yên (4), Nghệ An (3), Nam Định (3), Sơn La (3), Thái Nguyên (2), Hòa Bình (2), Undefined (7)
- Has relationships with 61 Bid Solicitors
- Has relationships with 32 Bid Investors
- Has competed against 143 contractors in 87 bidding packages, won 17 packages, lost 63 packages, 3 are pending results, and 4 were canceled.
- Has collaborated with 21 contractors in 74 bidding packages, won 14 packages, lost 57 packages, 2 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 0 | 0% |
| Lower by 10% to 20% | 0 | 0% |
| Lower by 5% to 10% | 4 | 6.7% |
| Lower by 1% to 5% | 11 | 18.3% |
| Lower by 0% to 1% | 39 | 65% |
| 0% | 5 | 8.3% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 1 | 1.7% |
| Unknown | 0 | 0% |
| Total | 60 | 100% |
NHAT LINH 689 CONSTRUCTION COMPANY LIMITED Won the bidding for the Civil Works package, which was invited for bidding by the Ban Quản lý dự án phường Bách Quang through an Open bidding as sub-joint of Liên danh 289 Thái Nguyên - Nhật Linh 689. One other contractors also participated.
- Result: Won
02/06/2026 17:39
NHAT LINH 689 CONSTRUCTION COMPANY LIMITED join for the Civil Works package, which was invited for bidding by the Ban Quản lý dự án phường Bách Quang through an Open bidding as sub-joint of CÔNG TY TNHH XÂY DỰNG NHẬT LINH 689. One other contractors also participated.
- Result: Tender opening completed
26/05/2026 15:40
NHAT LINH 689 CONSTRUCTION COMPANY LIMITED join for the Construction + equipment package, which was invited for bidding by the NGÂN HÀNG NÔNG NGHIỆP VÀ PHÁT TRIỂN NÔNG THÔN VIỆT NAM CHI NHÁNH LẠNG SƠN through an Open bidding as an independent entity.
- Result: Bid canceled
24/04/2026 10:09
NHAT LINH 689 CONSTRUCTION COMPANY LIMITED Won the bidding for the Project construction bidding package: Main road of Non Tranh hamlet. package, which was invited for bidding by the Trung Tâm Dịch Vụ Tổng Hợp Xã Tân Thành through an Competitive Offer as sub-joint of Liên danh Cầu đường 289 Thái Nguyên - Xây dựng Nhật Linh 689. One other contractors also participated.
- Result: Won
23/03/2026 15:21
NHAT LINH 689 CONSTRUCTION COMPANY LIMITED join for the Project construction bidding package: Main road of Non Tranh hamlet. package, which was invited for bidding by the Trung Tâm Dịch Vụ Tổng Hợp Xã Tân Thành through an Competitive Offer as sub-joint of CÔNG TY TNHH XÂY DỰNG NHẬT LINH 689. One other contractors also participated.
- Result: Tender opening completed
18/03/2026 12:54
NHAT LINH 689 CONSTRUCTION COMPANY LIMITED Won the bidding for the Package 06: Construction work package, which was invited for bidding by the SỞ NÔNG NGHIỆP VÀ MÔI TRƯỜNG TỈNH LẠNG SƠN through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
03/02/2026 10:32
NHAT LINH 689 CONSTRUCTION COMPANY LIMITED lost the bidding for the Package No. 04: Construction and supply and installation of equipment package, which was invited for bidding by the UBND xã Vân Du, tỉnh Thanh Hóa through an Open bidding as sub-joint of CÔNG TY TNHH XÂY DỰNG NHẬT LINH 689. Fourteen other contractors also participated.
- Result: Lost
02/02/2026 16:16
NHAT LINH 689 CONSTRUCTION COMPANY LIMITED join for the Package 06: Construction work package, which was invited for bidding by the SỞ NÔNG NGHIỆP VÀ MÔI TRƯỜNG TỈNH LẠNG SƠN through an Open bidding as an independent entity. One other contractors also participated.
- Result: Tender opening completed
10/01/2026 09:37
NHAT LINH 689 CONSTRUCTION COMPANY LIMITED lost the bidding for the Package 03: Construction of works (including: Cost of construction of main works, equipment costs, provisions) package, which was invited for bidding by the Uỷ ban nhân dân xã Quảng Bình, tỉnh Thanh Hóa through an Open bidding as sub-joint of CÔNG TY TNHH XÂY DỰNG NHẬT LINH 689. Six other contractors also participated.
- Result: Lost
27/12/2025 10:37
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder NHAT LINH 689 CONSTRUCTION COMPANY LIMITED participated in 136 package, of which 60 package was won, failed 63 packages, 5 packages with no results, 8 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NHAT LINH 689 CONSTRUCTION COMPANY LIMITED is related to 61 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NHAT LINH 689 CONSTRUCTION COMPANY LIMITED has a relationship with 32 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NHAT LINH 689 CONSTRUCTION COMPANY LIMITED competed with 143 contractors in 87 package, won 17 package, lost 63 package, 3 bidding package has no results, 4 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor NHAT LINH 689 CONSTRUCTION COMPANY LIMITED once entered into a partnership with 21 contractors in 74 package, won bid 14 package, lost 57 package, 2 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor NHAT LINH 689 CONSTRUCTION COMPANY LIMITED participated in bidding in 10 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor NHAT LINH 689 CONSTRUCTION COMPANY LIMITED participated in bidding in 10 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 72,215 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor