Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
1:07 PM 04/02/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
1:48 PM 04/03/2023 |
Active |
At the request of QTHT |
|
12:37 AM 07/09/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
9:55 AM 07/11/2023 |
Active |
At the request of QTHT |
|
1:00 AM 07/01/2024 |
Pause |
Temporarily suspended due to overdue fees |
Data analysis results of DauThau.info software for contractors SKYDOOR JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 35 bidding packages, of which 10 were won, 25 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 77.11% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 87.66% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Huế (31), Undefined (4)
- Provinces before the merger where the contractor has participated in bidding : Huế (31), Undefined (4)
- Has relationships with 19 Bid Solicitors
- Has relationships with 6 Bid Investors
- Has competed against 59 contractors in 29 bidding packages, won 6 packages, lost 23 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 2 contractors in 6 bidding packages, won 4 packages, lost 2 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 5 | 0% |
| Lower by 10% to 20% | 1 | 0% |
| Lower by 5% to 10% | 1 | 0% |
| Lower by 1% to 5% | 2 | 0% |
| Lower by 0% to 1% | 1 | 0% |
| 0% | 0 | |
| Higher by 0% to 1% | 0 | |
| Higher by 1% to 5% | 0 | |
| Higher by 5% to 10% | 0 | |
| Higher by 10% or more | 0 | |
| Unknown | 0 | |
| Total | 10 | 100% |
SKYDOOR JOINT STOCK COMPANY lost the bidding for the Package No. 19: Construction and equipment installation of project items (phase 2) package, which was invited for bidding by the TRƯỜNG TRUNG CẤP CÔNG NGHỆ SỐ 10 through an as an independent entity.
- Result: Lost
24/06/2023 16:31
SKYDOOR JOINT STOCK COMPANY Won the bidding for the The entire construction and installation part and equipment package, which was invited for bidding by the Ủy ban nhân dân xã Điền Hương through an as an independent entity.
- Result: Won
28/10/2022 09:39
SKYDOOR JOINT STOCK COMPANY lost the bidding for the Package No. 6: Construction cost package, which was invited for bidding by the Công ty cổ phần tư vấn xây dựng trường học through an as an independent entity.
- Result: Lost
09/09/2022 15:23
SKYDOOR JOINT STOCK COMPANY Won the bidding for the Package 03: The entire procurement of costumes and training equipment package, which was invited for bidding by the HOANG NAM CONSTRUCTION INVESTMENT ADVISORY ONE MEMBER LIABILITY LIMITED COMPANY through an as an independent entity.
- Result: Won
22/06/2022 12:06
SKYDOOR JOINT STOCK COMPANY lost the bidding for the Package 05: The entire construction and installation part package, which was invited for bidding by the Ủy ban nhân dân xã Phong Thu through an as an independent entity.
- Result: Lost
22/03/2022 10:15
SKYDOOR JOINT STOCK COMPANY lost the bidding for the The entire construction and installation part package, which was invited for bidding by the Ủy ban nhân dân Phường Phong Hòa through an as an independent entity.
- Result: Lost
10/12/2021 14:34
SKYDOOR JOINT STOCK COMPANY lost the bidding for the Package No. 05: The whole construction part package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng khu vực huyện Nam Đông through an as master consortium of Liên danh Công ty Cổ phần Sky door - Công ty TNHH Anh Quốc (3301519549 - Công ty cổ phần Sky door,3300387508 - Công ty TNHH Anh Quốc).
- Result: Lost
19/10/2021 15:07
SKYDOOR JOINT STOCK COMPANY Won the bidding for the Package 06: Construction cost package, which was invited for bidding by the NHAN TIN CONSTRUCTION COMPANY LIMITED through an as an independent entity.
- Result: Won
16/09/2021 07:41
SKYDOOR JOINT STOCK COMPANY Won the bidding for the Package 06: Construction cost package, which was invited for bidding by the NHAN TIN CONSTRUCTION COMPANY LIMITED through an as an independent entity.
- Result: Won
15/09/2021 09:25
SKYDOOR JOINT STOCK COMPANY lost the bidding for the Package 06: Construction cost package, which was invited for bidding by the NHAN TIN CONSTRUCTION COMPANY LIMITED through an as an independent entity.
- Result: Lost
22/07/2021 15:05
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder SKYDOOR JOINT STOCK COMPANY participated in 35 package, of which 10 package was won, failed 25 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SKYDOOR JOINT STOCK COMPANY is related to 19 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SKYDOOR JOINT STOCK COMPANY has a relationship with 25 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SKYDOOR JOINT STOCK COMPANY competed with 59 contractors in 29 package, won 6 package, lost 23 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor SKYDOOR JOINT STOCK COMPANY once entered into a partnership with 2 contractors in 6 package, won bid 4 package, lost 2 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor SKYDOOR JOINT STOCK COMPANY participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor SKYDOOR JOINT STOCK COMPANY participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,208 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor