Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
6:49 AM 10/15/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
2:12 PM 10/18/2022 |
Active |
At the request of QTHT |
|
2:12 PM 10/18/2022 |
Active |
At the request of QTHT |
|
12:03 AM 12/25/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
10:15 AM 01/05/2023 |
Active |
At the request of QTHT |
|
12:06 AM 06/03/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
11:31 AM 06/05/2023 |
Active |
At the request of QTHT |
|
12:25 AM 06/27/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
3:57 PM 06/28/2023 |
Active |
At the request of QTHT |
|
12:19 AM 07/25/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
3:50 PM 07/28/2023 |
Active |
At the request of QTHT |
|
12:07 AM 11/01/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
2:58 PM 11/07/2023 |
Active |
At the request of QTHT |
|
11:31 PM 01/10/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
3:00 PM 05/07/2024 |
Active |
At the request of QTHT |
|
12:06 AM 09/10/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
11:27 AM 09/19/2024 |
Active |
At the request of QTHT |
|
12:06 AM 11/19/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
2:29 PM 11/25/2024 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors TAN THINH INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 104 bidding packages, of which 74 were won, 24 were lost, 5 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 78.37% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 113.27% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Quảng Ngãi (54), TP.Hồ Chí Minh (2), Undefined (48)
- Provinces before the merger where the contractor has participated in bidding : Quảng Ngãi (50), Bình Dương (1), TP.Hồ Chí Minh (1), Undefined (52)
- Has relationships with 33 Bid Solicitors
- Has competed against 146 contractors in 46 bidding packages, won 16 packages, lost 24 packages, 6 are pending results, and 0 were canceled.
- Has collaborated with 52 contractors in 42 bidding packages, won 32 packages, lost 8 packages, 2 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Building organization name: Công ty Cổ phần đầu tư và xây dựng Tấn Thịnh
- Construction capacity certificate code: 00002429
- Issuing Authority: Sở Kế hoạch và Đầu tư Quảng Ngãi
- Field:
⚬ Thi công xây dựng công trình: Dân dụng
⚬ Thi công xây dựng công trình: Giao thông cầu, đường bộ
⚬ Thi công xây dựng công trình: Thủy lợi
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 1 | 1.4% |
| Lower by 10% to 20% | 2 | 2.7% |
| Lower by 5% to 10% | 3 | 4.1% |
| Lower by 1% to 5% | 6 | 8.1% |
| Lower by 0% to 1% | 40 | 54.1% |
| 0% | 7 | 9.5% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 3 | 4.1% |
| Higher by 5% to 10% | 3 | 4.1% |
| Higher by 10% or more | 9 | 12.2% |
| Unknown | 0 | 0% |
| Total | 74 | 100% |
TAN THINH INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY join for the ĐT10-2025 "Construction and repair of the road to avoid flooding of lake bed branch 1 of Dakdrinh hydroelectric power plant" package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG TẤN THỊNH. Eight other contractors also participated.
09/01/2026 08:22
TAN THINH INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Package No. 25: Construction of auxiliary items of the wastewater treatment station package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình dân dụng và công nghiệp tỉnh Quảng Ngãi through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Won
11/12/2025 11:56
TAN THINH INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Package No. 33: XL5 package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng các công trình giao thông tỉnh Quảng Ngãi through an Open bidding as master consortium of LIÊN DANH THI CÔNG GÓI THẦU SỐ 33: XL5.
- Result: Won
10/12/2025 14:06
TAN THINH INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY join for the Tender package No 12: Construction and equipment installation of the entire project package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG TẤN THỊNH. Four other contractors also participated.
10/12/2025 08:31
TAN THINH INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY join for the Package No. 33: XL5 package, which was invited for bidding by the through an Open bidding as master consortium of CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG TẤN THỊNH.
- Result: Tender opening completed
06/12/2025 08:06
TAN THINH INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY join for the Package No. 25: Construction of auxiliary items of the wastewater treatment station package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình dân dụng và công nghiệp tỉnh Quảng Ngãi through an Open bidding as an independent entity. Three other contractors also participated.
- Result: Tender opening completed
27/11/2025 08:33
TAN THINH INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY lost the bidding for the Package 8: Construction and traffic safety package, which was invited for bidding by the TRUNG LONG DESIGN CONSTRUCTION COMPANY LIMITED through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG TẤN THỊNH. Six other contractors also participated.
- Result: Lost
28/07/2025 16:10
TAN THINH INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY join for the Package 8: Construction and traffic safety package, which was invited for bidding by the TRUNG LONG DESIGN CONSTRUCTION COMPANY LIMITED through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG TẤN THỊNH. Six other contractors also participated.
- Result: Tender opening completed
14/07/2025 10:04
TAN THINH INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY lost the bidding for the Repair works package, which was invited for bidding by the Sở Giao thông vận tải tỉnh Quảng Ngãi through an Open bidding as master consortium of CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG TẤN THỊNH. Five other contractors also participated.
- Result: Lost
18/06/2025 09:12
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder TAN THINH INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY participated in 104 package, of which 74 package was won, failed 24 packages, 5 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TAN THINH INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY is related to 33 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TAN THINH INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY competed with 146 contractors in 46 package, won 16 package, lost 24 package, 6 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor TAN THINH INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY once entered into a partnership with 52 contractors in 42 package, won bid 32 package, lost 8 package, 2 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor TAN THINH INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY participated in bidding in 2 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TAN THINH INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,759 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor