Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
2:38 PM 10/12/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
8:48 AM 10/17/2022 |
Active |
At the request of QTHT |
|
8:55 AM 01/30/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
1:44 PM 01/30/2023 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors TELEMATIC JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 360 bidding packages, of which 196 were won, 125 were lost, 22 are pending results, and 17 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 28.1% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 77.13% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (157), Đà Nẵng (46), TP.Hồ Chí Minh (31), Khánh Hòa (23), Lâm Đồng (16), Sơn La (14), Gia Lai (13), Hà Tĩnh (10), Phú Thọ (9), Đồng Nai (8), Quảng Ngãi (7), Hải Phòng (6), Ninh Bình (5), Hưng Yên (5), Quảng Trị (5), Thanh Hoá (5), Quảng Ninh (4), Lai Châu (4), Lào Cai (4), Đắk Lắk (3), Bắc Ninh (3), Thái Nguyên (2), Tuyên Quang (2), Cần Thơ (2), Huế (2), Nghệ An (2), Vĩnh Long (1), Tây Ninh (1), Nationwide (1), (1), Cao Bằng (1), Lạng Sơn (1), Điện Biên (1), An Giang (1), Cà Mau (1), Đồng Tháp (1), Undefined (44)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (157), Đà Nẵng (39), Khánh Hòa (23), TP.Hồ Chí Minh (20), Sơn La (14), Hà Tĩnh (10), Gia Lai (8), Hòa Bình (6), Bình Thuận (6), Lâm Đồng (6), Đồng Nai (5), Bà Rịa - Vũng Tàu (5), Thanh Hoá (5), Quảng Ninh (4), Bình Định (4), Lai Châu (4), Quảng Nam (4), Phú Yên (3), Đắk Nông (3), Hải Dương (3), Ninh Bình (3), Quảng Bình (3), Quảng Trị (3), Lào Cai (3), Bình Dương (2), Thái Bình (2), Huế (2), Quảng Ngãi (2), Đắk Lắk (2), Nghệ An (2), Thái Nguyên (1), Bắc Ninh (1), Trà Vinh (1), Tuyên Quang (1), Cần Thơ (1), Kon Tum (1), Bình Phước (1), Long An (1), Nationwide (1), Cao Bằng (1), Lạng Sơn (1), Điện Biên (1), Phú Thọ (1), Undefined (66)
- Has relationships with 90 Bid Solicitors
- Has competed against 249 contractors in 269 bidding packages, won 111 packages, lost 123 packages, 24 are pending results, and 11 were canceled.
- Has collaborated with 21 contractors in 46 bidding packages, won 26 packages, lost 13 packages, 6 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 23 | 11.7% |
| Lower by 10% to 20% | 15 | 7.7% |
| Lower by 5% to 10% | 32 | 16.3% |
| Lower by 1% to 5% | 73 | 37.2% |
| Lower by 0% to 1% | 42 | 21.4% |
| 0% | 1 | 0.5% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 2 | 1% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 8 | 4.1% |
| Unknown | 0 | 0% |
| Total | 196 | 100% |
TELEMATIC JOINT STOCK COMPANY join for the Providing storage equipment, specialized backup software and anti-malware solutions for server systems - ensuring the safety of Hanoi University of Science and Technology's information system package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
09/01/2026 10:43
TELEMATIC JOINT STOCK COMPANY Won the bidding for the Package 29.VT.SCL2026: Supply VTTB to repair vertical capacitors for 500kV Da Nang and 500kV Thanh My substations package, which was invited for bidding by the Tổng Công ty Truyền tải điện Quốc gia Công ty Truyền tải điện 2 through an Open bidding as an independent entity.
- Result: Won
07/01/2026 09:03
TELEMATIC JOINT STOCK COMPANY join for the Equipped with online transformer monitoring system (MBA) T4 and MBA T2 at Ialy hydropower plant package, which was invited for bidding by the through an Open bidding as an independent entity. One other contractors also participated.
31/12/2025 08:09
TELEMATIC JOINT STOCK COMPANY Won the bidding for the Package No. 4: Supply, transport and installation of online oil monitoring system for 500 kV - 900 MVA transformer package, which was invited for bidding by the TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
29/12/2025 14:22
TELEMATIC JOINT STOCK COMPANY Won the bidding for the Providing VTTB to serve construction, repair and replacement of TBD503 phase B, branch A condenser at Doc Soi 500kV substation package, which was invited for bidding by the Tổng Công ty Truyền tải điện Quốc gia Công ty Truyền tải điện 2 through an Open bidding as an independent entity.
- Result: Won
29/12/2025 09:41
TELEMATIC JOINT STOCK COMPANY Won the bidding for the Package No. 3: Supply and installation of materials and equipment, website creation and training package, which was invited for bidding by the TỔNG CÔNG TY TRUYỀN TẢI ĐIỆN QUỐC GIA through an Open bidding as an independent entity. One other contractors also participated.
- Result: Won
26/12/2025 15:03
TELEMATIC JOINT STOCK COMPANY join for the Package 10: Supply and install online oil monitoring system for MBA 500KV-450MVA package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
22/12/2025 10:05
TELEMATIC JOINT STOCK COMPANY Won the bidding for the Package 1 "Procurement, deploying optical transmission devices" package, which was invited for bidding by the CÔNG TY VIỄN THÔNG ĐIỆN LỰC VÀ CÔNG NGHỆ THÔNG TIN - CHI NHÁNH TẬP ĐOÀN ĐIỆN LỰC VIỆT NAM through an Open bidding as master consortium of Liên danh T-N. Three other contractors also participated.
- Result: Won
18/12/2025 17:40
TELEMATIC JOINT STOCK COMPANY join for the Providing VTTB to serve construction, repair and replacement of TBD503 phase B, branch A condenser at Doc Soi 500kV substation package, which was invited for bidding by the through an Open bidding as an independent entity.
- Result: Tender opening completed
18/12/2025 09:08
TELEMATIC JOINT STOCK COMPANY Won the bidding for the Building an online monitoring system for the operating status of the fiber optic network of the Southern Electricity Corporation (phase 3) package, which was invited for bidding by the TỔNG CÔNG TY ĐIỆN LỰC MIỀN NAM TNHH through an Open bidding as sub-joint of Liên danh Công ty TNHH Công Nghệ Hồng Cơ và Công ty Cổ phần Telematic (Tên viết tắt: Liên danh HONGCO-TELEMATIC).
- Result: Won
17/12/2025 08:29
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder TELEMATIC JOINT STOCK COMPANY participated in 360 package, of which 196 package was won, failed 125 packages, 22 packages with no results, 17 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TELEMATIC JOINT STOCK COMPANY is related to 90 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TELEMATIC JOINT STOCK COMPANY competed with 249 contractors in 269 package, won 111 package, lost 123 package, 24 bidding package has no results, 11 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor TELEMATIC JOINT STOCK COMPANY once entered into a partnership with 21 contractors in 46 package, won bid 26 package, lost 13 package, 6 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor TELEMATIC JOINT STOCK COMPANY participated in bidding in 35 provinces/cities, 1 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor TELEMATIC JOINT STOCK COMPANY participated in bidding in 42 provinces/cities, 1 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,725 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor