Data analysis results of DauThau.info software for contractors VIET NAM POWER AND INFRASTRUCTURE DEVELOPMENT INVESTMENT JOINT STOCK COMPANY - PIDI are as follows:
You need to Login or Sign up to view all informations.
- Participated in 18 bidding packages, of which 8 were won, 9 were lost, 0 are pending results, and 1 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 95.07% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.83% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Hà Nội (5), Khánh Hòa (1), Thanh Hoá (1), Nam Định (1), Hưng Yên (1), Lào Cai (1), Undefined (8)
- Has relationships with 12 Bid Solicitors
- Has competed against 16 contractors in 10 bidding packages, won 0 packages, lost 9 packages, 0 are pending results, and 1 were canceled.
- Has collaborated with 11 contractors in 8 bidding packages, won 5 packages, lost 3 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Competitiveness | ??? |
Enterprise scale | ??? |
Violation history | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
---|---|---|
Lower by 20% or more | 0 | 0% |
Lower by 10% to 20% | 0 | 0% |
Lower by 5% to 10% | 1 | 12.5% |
Lower by 1% to 5% | 2 | 25% |
Lower by 0% to 1% | 4 | 50% |
0% | 0 | 0% |
Higher by 0% to 1% | 0 | 0% |
Higher by 1% to 5% | 0 | 0% |
Higher by 5% to 10% | 0 | 0% |
Higher by 10% or more | 1 | 12.5% |
Unknown | 0 | 0% |
Total | 8 | 100% |
VIET NAM POWER AND INFRASTRUCTURE DEVELOPMENT INVESTMENT JOINT STOCK COMPANY - PIDI Won the bidding for the Construction and equipment supply and installation package, which was invited for bidding by the Ban Quản Lý Dự Án Các Công Trình Xây Dựng Của Đảng Ở Trung Ương through an Open bidding as sub-joint of Công ty cổ phần xây dựng và đầu tư VISICONS.
- Result: Won
14/12/2023 16:52
VIET NAM POWER AND INFRASTRUCTURE DEVELOPMENT INVESTMENT JOINT STOCK COMPANY - PIDI Won the bidding for the Package XL-02: Construction and procurement, installation of fire prevention and fighting system equipment, pressure booster system, hallway smoke extraction, light electricity, transformer station, building garbage disposal package, which was invited for bidding by the Military Technical Academy through an Open bidding as sub-joint of CÔNG TY CỔ PHẦN CƠ ĐIỆN GRAND M & E.
- Result: Won
18/11/2023 21:34
VIET NAM POWER AND INFRASTRUCTURE DEVELOPMENT INVESTMENT JOINT STOCK COMPANY - PIDI lost the bidding for the Maintain Network Manager 6.5 system at control center EVN HANOI package, which was invited for bidding by the HANOI LDC through an Đấu thầu rộng rãi trong nước as an independent entity. One other contractors also participated.
- Result: Lost
20/11/2020 11:21
VIET NAM POWER AND INFRASTRUCTURE DEVELOPMENT INVESTMENT JOINT STOCK COMPANY - PIDI lost the bidding for the Package 03: Supply, transport and install VTTB 110kV . substation package, which was invited for bidding by the Power Network Project Management Board through an Đấu thầu rộng rãi trong nước as sub-joint of CÔNG TY CỔ PHẦN ĐẦU TƯ PHÁT TRIỂN ĐIỆN LỰC VÀ HẠ TẦNG VIỆT NAM- PIDI . Six other contractors also participated.
- Result: Lost
09/09/2020 17:06
VIET NAM POWER AND INFRASTRUCTURE DEVELOPMENT INVESTMENT JOINT STOCK COMPANY - PIDI lost the bidding for the NPC\ĐZ TBA110kV-SD-G02: Supply, transport and install VTTB for Son Dong 110kV transformer station and MR 110kV Luc Ngan substation package, which was invited for bidding by the Power Network Project Management Board through an Đấu thầu rộng rãi trong nước as sub-joint of CÔNG TY CỔ PHẦN ĐẦU TƯ PHÁT TRIỂN ĐIỆN LỰC VÀ HẠ TẦNG VIỆT NAM- PIDI . Six other contractors also participated.
- Result: Lost
03/08/2020 08:58
VIET NAM POWER AND INFRASTRUCTURE DEVELOPMENT INVESTMENT JOINT STOCK COMPANY - PIDI lost the bidding for the LD-G02: Supply, transport and install VTTB 110kV . substation package, which was invited for bidding by the Power Network Project Management Board through an Đấu thầu rộng rãi trong nước as sub-joint of CÔNG TY CỔ PHẦN ĐẦU TƯ PHÁT TRIỂN ĐIỆN LỰC VÀ HẠ TẦNG VIỆT NAM- PIDI . Seven other contractors also participated.
- Result: Lost
15/06/2020 15:45
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder VIET NAM POWER AND INFRASTRUCTURE DEVELOPMENT INVESTMENT JOINT STOCK COMPANY - PIDI participated in 18 package, of which 8 package was won, failed 9 packages, 0 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VIET NAM POWER AND INFRASTRUCTURE DEVELOPMENT INVESTMENT JOINT STOCK COMPANY - PIDI is related to 12 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VIET NAM POWER AND INFRASTRUCTURE DEVELOPMENT INVESTMENT JOINT STOCK COMPANY - PIDI competed with 16 contractors in 10 package, won 0 package, lost 9 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor VIET NAM POWER AND INFRASTRUCTURE DEVELOPMENT INVESTMENT JOINT STOCK COMPANY - PIDI once entered into a partnership with 11 contractors in 8 package, won bid 5 package, lost 3 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor VIET NAM POWER AND INFRASTRUCTURE DEVELOPMENT INVESTMENT JOINT STOCK COMPANY - PIDI participated in bidding in 6 provinces/cities, 0 bidding packages were carried out nationwide, 0 bidding packages were carried out outside of Vietnam. The data table has been partially hidden, to see the full information please Login or Register
There are 63,790 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Add contractor
Security Code