Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:05 AM 07/16/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
2:02 PM 07/16/2024 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors METECH EQUIPMENT JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 103 bidding packages, of which 63 were won, 35 were lost, 4 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 1.14% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 2.22% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (32), TP.Hồ Chí Minh (20), Cần Thơ (8), Quảng Ninh (7), Đồng Nai (4), Hải Phòng (4), Đắk Lắk (3), Bắc Ninh (3), Nghệ An (2), Ninh Bình (2), Hưng Yên (2), Khánh Hòa (1), Phú Thọ (1), Huế (1), Thanh Hoá (1), Đà Nẵng (1), Undefined (11)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (32), TP.Hồ Chí Minh (17), Cần Thơ (8), Quảng Ninh (7), Hải Phòng (4), Phú Yên (3), Đồng Nai (2), Bình Phước (2), Nghệ An (2), Ninh Bình (2), Thái Bình (2), Bắc Ninh (2), Ninh Thuận (1), Phú Thọ (1), Huế (1), Thanh Hoá (1), Bắc Giang (1), Undefined (19)
- Has relationships with 65 Bid Solicitors
- Has competed against 658 contractors in 69 bidding packages, won 28 packages, lost 34 packages, 6 are pending results, and 1 were canceled.
- Has collaborated with 6 contractors in 5 bidding packages, won 4 packages, lost 0 packages, 0 are pending results, and 1 were canceled.
- Received 2 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 42 | 66.7% |
| Lower by 10% to 20% | 0 | 0% |
| Lower by 5% to 10% | 3 | 4.8% |
| Lower by 1% to 5% | 7 | 11.1% |
| Lower by 0% to 1% | 7 | 11.1% |
| 0% | 4 | 6.3% |
| Higher by 0% to 1% | 0 | 0% |
| Higher by 1% to 5% | 0 | 0% |
| Higher by 5% to 10% | 0 | 0% |
| Higher by 10% or more | 0 | 0% |
| Unknown | 0 | 0% |
| Total | 63 | 100% |
METECH EQUIPMENT JOINT STOCK COMPANY Won the bidding for the Package 3: Procurement of common medical supplies for Binh Duong General Hospital in 2025 - 2026 package, which was invited for bidding by the Bệnh viện Đa khoa Bình Dương through an Open bidding as an independent entity. Ninety nine other contractors also participated.
- Result: Won
09/01/2026 16:01
METECH EQUIPMENT JOINT STOCK COMPANY join for the Package 3: Purchase consumable medical supplies: 27 parts (40 items) package, which was invited for bidding by the through an Open bidding as an independent entity. Thirty three other contractors also participated.
09/01/2026 09:05
METECH EQUIPMENT JOINT STOCK COMPANY lost the bidding for the Providing general digital X-ray machines package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Lost
19/12/2025 16:07
METECH EQUIPMENT JOINT STOCK COMPANY join for the Package 3: Supplying surgical, endoscopic, digestive materials package, which was invited for bidding by the through an Open bidding as an independent entity. Twenty seven other contractors also participated.
15/12/2025 10:05
METECH EQUIPMENT JOINT STOCK COMPANY join for the Providing general digital X-ray machines package, which was invited for bidding by the through an Open bidding as an independent entity. Two other contractors also participated.
- Result: Tender opening completed
09/12/2025 10:06
METECH EQUIPMENT JOINT STOCK COMPANY join for the Bidding package No. 5: Procurement of medical supplies used in thyroid, thoracic and abdominal surgery package, which was invited for bidding by the BỆNH VIỆN ĐÀ NẴNG through an Open bidding as an independent entity. Twenty seven other contractors also participated.
25/11/2025 09:04
METECH EQUIPMENT JOINT STOCK COMPANY lost the bidding for the Supplying accessories for repairing equipment for FDG radioactive substance production and necessary accessories to repair PET/CT system package, which was invited for bidding by the 108 Military Central Hospital through an Open bidding as an independent entity. Four other contractors also participated.
- Result: Lost
21/11/2025 17:42
METECH EQUIPMENT JOINT STOCK COMPANY Won the bidding for the Direct procurement of medical supplies, biological products, and testing chemicals for the first time in 2023 package, which was invited for bidding by the SAI GON GENERAL HOSPITAL through an direct shopping as an independent entity.
- Result: Won
17/11/2025 14:48
METECH EQUIPMENT JOINT STOCK COMPANY Won the bidding for the Providing gauze, gauze to treat wounds in 2025-2026 package, which was invited for bidding by the BỆNH VIỆN ĐA KHOA BƯU ĐIỆN through an CGTTRG as an independent entity.
- Result: Won
12/11/2025 14:13
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder METECH EQUIPMENT JOINT STOCK COMPANY participated in 103 package, of which 63 package was won, failed 35 packages, 4 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor METECH EQUIPMENT JOINT STOCK COMPANY is related to 65 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor METECH EQUIPMENT JOINT STOCK COMPANY competed with 658 contractors in 69 package, won 28 package, lost 34 package, 6 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor METECH EQUIPMENT JOINT STOCK COMPANY once entered into a partnership with 6 contractors in 5 package, won bid 4 package, lost 0 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor METECH EQUIPMENT JOINT STOCK COMPANY participated in bidding in 16 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor METECH EQUIPMENT JOINT STOCK COMPANY participated in bidding in 17 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 68,725 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects
Add contractor