Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
9:26 AM 10/15/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
11:12 AM 12/08/2023 |
Active |
At the request of QTHT |
|
11:31 PM 01/24/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
9:33 AM 01/29/2024 |
Active |
At the request of QTHT |
|
12:07 AM 11/05/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
9:21 AM 11/24/2024 |
Active |
At the request of QTHT |
|
12:05 AM 07/04/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
9:18 AM 07/04/2025 |
Active |
At the request of QTHT |
|
12:05 AM 10/31/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
7:16 AM 10/31/2025 |
Active |
At the request of QTHT |
|
12:05 AM 11/20/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
10:30 AM 11/20/2025 |
Active |
At the request of QTHT |
|
12:05 AM 12/09/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
8:52 AM 12/09/2025 |
Active |
At the request of QTHT |
|
12:05 AM 03/26/2026 |
Pause |
Temporarily suspended due to overdue fees |
|
9:12 AM 03/26/2026 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors FORZ HOLDING COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 36 bidding packages, of which 17 were won, 15 were lost, 2 are pending results, and 2 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 6.45% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 83.08% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Lâm Đồng (1), Thái Nguyên (1), Đồng Nai (3), Quảng Ninh (2), TP.Hồ Chí Minh (8), Thanh Hoá (1), Vĩnh Long (1), Gia Lai (9), Cà Mau (2), Khánh Hòa (1), Nationwide (1), Đồng Tháp (1), An Giang (1), Huế (1), Đắk Lắk (1), Undefined (2)
- Provinces before the merger where the contractor has participated in bidding : Lâm Đồng (1), Thái Nguyên (1), Bình Phước (2), Quảng Ninh (2), TP.Hồ Chí Minh (2), Bình Dương (2), Thanh Hoá (1), Bến Tre (1), Bình Định (2), Bà Rịa - Vũng Tàu (1), Bạc Liêu (1), Gia Lai (1), Huế (1), Undefined (18)
- Has relationships with 23 Bid Solicitors
- Has relationships with 37 Bid Investors
- Has competed against 67 contractors in 33 bidding packages, won 15 packages, lost 14 packages, 2 are pending results, and 2 were canceled.
- Has collaborated with 4 contractors in 3 bidding packages, won 2 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 3 | 0% |
| Lower by 10% to 20% | 5 | 0% |
| Lower by 5% to 10% | 1 | 0% |
| Lower by 1% to 5% | 3 | 0% |
| Lower by 0% to 1% | 2 | 0% |
| 0% | 3 | 0% |
| Higher by 0% to 1% | 0 | |
| Higher by 1% to 5% | 0 | |
| Higher by 5% to 10% | 0 | |
| Higher by 10% or more | 0 | |
| Unknown | 0 | |
| Total | 17 | 100% |
FORZ HOLDING COMPANY LIMITED Won the bidding for the Procurement of 405KVA generators and pickup trucks to serve epidemic prevention and vaccine transportation package, which was invited for bidding by the Trung Tâm Y Tế Ayun Pa through an as an independent entity. One other contractors also participated.
- Result: Won
14/08/2026 15:56
FORZ HOLDING COMPANY LIMITED Won the bidding for the Procurement of 350kVA generator and ATS 630A cabinet (automatic power transfer) package, which was invited for bidding by the Trung Tâm Y Tế Chư Păh through an as an independent entity.
- Result: Won
28/07/2026 15:22
FORZ HOLDING COMPANY LIMITED Won the bidding for the Generator Hoa Binh Bank for Social Policies Transaction Office package, which was invited for bidding by the Chi nhánh Ngân hàng Chính sách xã hội tỉnh Cà Mau through an as an independent entity. Four other contractors also participated.
- Result: Won
23/07/2026 10:31
FORZ HOLDING COMPANY LIMITED Won the bidding for the Package No. 18/2026/HH: Procurement and installation of generators package, which was invited for bidding by the Bệnh viện đa khoa Phú Yên through an as an independent entity. Three other contractors also participated.
- Result: Won
06/07/2026 15:02
FORZ HOLDING COMPANY LIMITED Won the bidding for the Repairing backup generators to supply power to the 9-story building of Binh Phuoc General Hospital package, which was invited for bidding by the Bệnh viện Đa khoa Bình Phước through an as an independent entity.
- Result: Won
30/06/2026 13:31
FORZ HOLDING COMPANY LIMITED join for the Shopping for backup generators package, which was invited for bidding by the Trung tâm điều dưỡng người có công Thành phố Hồ Chí Minh through an as an independent entity. Twelve other contractors also participated.
04/06/2026 14:22
FORZ HOLDING COMPANY LIMITED join for the Tender package No 03: Supply of generators package, which was invited for bidding by the UỶ BAN MẶT TRẬN TỔ QUỐC VIỆT NAM TỈNH THỪA THIÊN HUẾ through an as an independent entity. Ten other contractors also participated.
16/04/2026 08:38
FORZ HOLDING COMPANY LIMITED lost the bidding for the Package number 2: Procurement of generators at Kien Giang Mental Hospital package, which was invited for bidding by the Bệnh viện Tâm thần Kiên Giang through an as an independent entity. Four other contractors also participated.
- Result: Lost
29/03/2026 09:40
FORZ HOLDING COMPANY LIMITED Won the bidding for the Procure some supplies and equipment for assembling and connecting backup generators package, which was invited for bidding by the Trung tâm Y tế Hoài Nhơn through an as an independent entity.
- Result: Won
23/03/2026 15:52
FORZ HOLDING COMPANY LIMITED lost the bidding for the Procurement of 02 generators with capacity of 250kVA package, which was invited for bidding by the DONG THAP WATER SUPPLY & URBAN ENVIRONMENT JOINT - STOCK COMPANY through an as an independent entity. Six other contractors also participated.
- Result: Lost
11/03/2026 09:21
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder FORZ HOLDING COMPANY LIMITED participated in 36 package, of which 17 package was won, failed 15 packages, 2 packages with no results, 2 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor FORZ HOLDING COMPANY LIMITED is related to 23 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor FORZ HOLDING COMPANY LIMITED has a relationship with 37 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor FORZ HOLDING COMPANY LIMITED competed with 67 contractors in 33 package, won 15 package, lost 14 package, 2 bidding package has no results, 2 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor FORZ HOLDING COMPANY LIMITED once entered into a partnership with 4 contractors in 3 package, won bid 2 package, lost 1 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor FORZ HOLDING COMPANY LIMITED participated in bidding in 14 provinces/cities, 1 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor FORZ HOLDING COMPANY LIMITED participated in bidding in 13 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,201 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor