Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
12:03 AM 12/20/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
2:47 PM 12/20/2022 |
Active |
At the request of QTHT |
|
6:23 AM 04/02/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
4:02 PM 05/20/2023 |
Active |
At the request of QTHT |
|
12:21 AM 07/01/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
4:33 PM 07/04/2024 |
Active |
At the request of QTHT |
|
12:05 AM 07/25/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
10:50 AM 08/05/2024 |
Active |
At the request of QTHT |
|
12:06 AM 08/25/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
10:16 AM 10/05/2024 |
Active |
At the request of QTHT |
|
12:05 AM 12/17/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
9:53 AM 12/23/2024 |
Active |
At the request of QTHT |
|
12:05 AM 01/23/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
8:21 AM 03/11/2025 |
Active |
At the request of QTHT |
|
12:05 AM 04/16/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
3:22 PM 04/18/2025 |
Active |
At the request of QTHT |
|
12:05 AM 06/17/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
8:41 PM 06/17/2025 |
Active |
At the request of QTHT |
|
12:05 AM 07/25/2025 |
Pause |
Temporarily suspended due to overdue fees |
|
9:06 AM 12/02/2025 |
Active |
At the request of QTHT |
|
12:57 AM 04/01/2026 |
Pause |
Temporarily suspended due to overdue fees |
|
4:00 PM 04/18/2026 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors 749 CONSTRUCTION JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 50 bidding packages, of which 40 were won, 8 were lost, 1 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 85.29% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.11% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (39), Undefined (11)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (39), Undefined (11)
- Has relationships with 19 Bid Solicitors
- Has relationships with 19 Bid Investors
- Has competed against 80 contractors in 15 bidding packages, won 10 packages, lost 4 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 68 contractors in 35 bidding packages, won 30 packages, lost 4 packages, 0 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 0 | |
| Lower by 10% to 20% | 2 | 0% |
| Lower by 5% to 10% | 1 | 0% |
| Lower by 1% to 5% | 7 | 0% |
| Lower by 0% to 1% | 22 | 0% |
| 0% | 0 | |
| Higher by 0% to 1% | 0 | |
| Higher by 1% to 5% | 4 | 0% |
| Higher by 5% to 10% | 2 | 0% |
| Higher by 10% or more | 2 | 0% |
| Unknown | 0 | |
| Total | 40 | 100% |
749 CONSTRUCTION JOINT STOCK COMPANY join for the Package 06: Construction work package, which was invited for bidding by the Ban quản lý dự án đầu tư - hạ tầng phường Đông Ngạc through an as an independent entity. One other contractors also participated.
30/08/2026 10:02
749 CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Package No. 22: Construction of the entire project package, which was invited for bidding by the Ủy ban nhân dân phường Long Biên through an as sub-joint of Liên danh nhà thầu xây dựng tuyến đường 25m. Eight other contractors also participated.
- Result: Won
23/05/2026 08:39
749 CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Package No. 16: Construction and installation of construction equipment package, which was invited for bidding by the Ban quản lý Dự án đầu tư - hạ tầng phường Yên Hòa through an as sub-joint of Liên danh thi công xây dựng Trường THCS Nam Trung Yên. Six other contractors also participated.
- Result: Won
24/12/2025 18:12
749 CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Package No. 09: Construction, supply and installation of equipment package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Đông Anh through an as sub-joint of Liên danh MN - ĐH. Three other contractors also participated.
- Result: Won
24/06/2025 08:54
749 CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Package No. 14: The entire construction and installation of equipment and equipment installation (including FPF, except for the educational equipment) (including 5% of the fee reserve) package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng quận Long Biên through an as sub-joint of Liên Danh Công ty TNHH Hồng Trường - Công ty cổ phần thương mại dịch vụ PCCC Hà Thành – Công ty cổ phần xây dựng 749. Five other contractors also participated.
- Result: Won
10/06/2025 10:35
749 CONSTRUCTION JOINT STOCK COMPANY lost the bidding for the Construction and installation of equipment package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng huyện Thanh Trì through an as sub-joint of Liên danh Đông Đô 6 – 749 – Bình An Khang – Đức Việt Hà Nội – Phú Hưng. Seven other contractors also participated.
- Result: Lost
10/06/2025 09:25
749 CONSTRUCTION JOINT STOCK COMPANY lost the bidding for the Package No. 21: Construction of the entire construction, purchase and installation of equipment package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng quận Cầu Giấy through an as master consortium of Liên danh QH . Eight other contractors also participated.
- Result: Lost
02/06/2025 12:04
749 CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Package No. 14: All construction, air conditioning, fire protection system and equipment installation (except educational and IT equipment) package, which was invited for bidding by the Ban quản lý dự án đầu tư xây dựng quận Long Biên through an as sub-joint of Liên danh PD-HL. One other contractors also participated.
- Result: Won
27/05/2025 13:49
749 CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Package 03: All construction costs package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng huyện Đan Phượng, thành phố Hà Nội through an as an independent entity.
- Result: Won
09/04/2025 14:39
749 CONSTRUCTION JOINT STOCK COMPANY Won the bidding for the Tender package No 05: Construction work package, which was invited for bidding by the BAN QLDA ĐẦU TƯ XÂY DỰNG HUYỆN BA VÌ through an as an independent entity.
- Result: Won
08/04/2025 11:19
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder 749 CONSTRUCTION JOINT STOCK COMPANY participated in 50 package, of which 40 package was won, failed 8 packages, 1 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor 749 CONSTRUCTION JOINT STOCK COMPANY is related to 19 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor 749 CONSTRUCTION JOINT STOCK COMPANY has a relationship with 26 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor 749 CONSTRUCTION JOINT STOCK COMPANY competed with 80 contractors in 15 package, won 10 package, lost 4 package, 1 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor 749 CONSTRUCTION JOINT STOCK COMPANY once entered into a partnership with 68 contractors in 35 package, won bid 30 package, lost 4 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor 749 CONSTRUCTION JOINT STOCK COMPANY participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor 749 CONSTRUCTION JOINT STOCK COMPANY participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,208 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor