Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
1:44 AM 10/16/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
10:11 AM 04/25/2023 |
Active |
At the request of QTHT |
|
1:04 AM 07/01/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
4:24 PM 07/02/2024 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors KIM LONG CALIBRATION AND TECHNOLOGIES COMPANY LIMITED are as follows:
You need to Login or Sign up to view all informations.
- Participated in 11 bidding packages, of which 8 were won, 2 were lost, 0 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 45.23% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 97.39% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : TP.Hồ Chí Minh (1), Hà Nội (4), Hải Phòng (1), Lâm Đồng (1), Undefined (4)
- Provinces before the merger where the contractor has participated in bidding : Bà Rịa - Vũng Tàu (1), Hà Nội (4), Hải Dương (1), Bình Thuận (1), Undefined (4)
- Has relationships with 7 Bid Solicitors
- Has relationships with 5 Bid Investors
- Has competed against 19 contractors in 6 bidding packages, won 6 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 8 contractors in 5 bidding packages, won 2 packages, lost 2 packages, 0 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 1 | 0% |
| Lower by 10% to 20% | 0 | |
| Lower by 5% to 10% | 0 | |
| Lower by 1% to 5% | 0 | |
| Lower by 0% to 1% | 1 | 0% |
| 0% | 6 | 0% |
| Higher by 0% to 1% | 0 | |
| Higher by 1% to 5% | 0 | |
| Higher by 5% to 10% | 0 | |
| Higher by 10% or more | 0 | |
| Unknown | 0 | |
| Total | 8 | 100% |
KIM LONG CALIBRATION AND TECHNOLOGIES COMPANY LIMITED Won the bidding for the Bidding package: Calibration of labor environment monitoring equipment and laboratory equipment in 2026 package, which was invited for bidding by the COHE through an as an independent entity.
- Result: Won
21/04/2026 16:29
KIM LONG CALIBRATION AND TECHNOLOGIES COMPANY LIMITED Won the bidding for the Calibration of laboratory equipment in 2026 package, which was invited for bidding by the Center for Environment and Cleaner production through an as an independent entity.
- Result: Won
25/02/2026 11:07
KIM LONG CALIBRATION AND TECHNOLOGIES COMPANY LIMITED Won the bidding for the Calibration of laboratory equipment in 2025 package, which was invited for bidding by the Center for Environment and Cleaner production through an as an independent entity.
- Result: Won
22/12/2025 21:19
KIM LONG CALIBRATION AND TECHNOLOGIES COMPANY LIMITED Won the bidding for the Calibration of labor environmental monitoring equipment, laboratory equipment of the Faculty of Environment in 2025 package, which was invited for bidding by the COHE through an as an independent entity.
- Result: Won
05/05/2025 10:01
KIM LONG CALIBRATION AND TECHNOLOGIES COMPANY LIMITED Won the bidding for the Calibration of equipment used for testing and inspection, Source: Food Safety Inspection Task 2024 package, which was invited for bidding by the Viện Dinh Dưỡng through an as sub-joint of Nhà thầu liên danh: NIFC-VMI-KCL.
- Result: Won
15/10/2024 15:56
KIM LONG CALIBRATION AND TECHNOLOGIES COMPANY LIMITED lost the bidding for the Semi -standard equipment package, which was invited for bidding by the Hai Duong Medical Technical University through an as sub-joint of NIFC-NIHE-KCL.
- Result: Lost
03/08/2024 08:43
KIM LONG CALIBRATION AND TECHNOLOGIES COMPANY LIMITED Won the bidding for the Calibration of working environment monitoring equipment and laboratory equipment of the Faculty of Environment in 2024 package, which was invited for bidding by the COHE through an as an independent entity.
- Result: Won
25/04/2024 11:08
KIM LONG CALIBRATION AND TECHNOLOGIES COMPANY LIMITED lost the bidding for the Providing inspection and calibration services for equipment with strict requirements on labor safety in 2024 package, which was invited for bidding by the CÔNG TY NHIỆT ĐIỆN VĨNH TÂN - CHI NHÁNH TỔNG CÔNG TY PHÁT ĐIỆN 3 - CÔNG TY CỔ PHẦN through an as sub-joint of LIÊN DANH NHÀ THẦU: CÔNG TY CỔ PHẦN GIẢI PHÁP AN TOÀN Á CHÂU - CÔNG TY TNHH HIỆU CHUẨN VÀ CÔNG NGHỆ KIM LONG-CÔNG TY CỔ PHẦN DỊCH VỤ KỸ THUẬT ĐIỆN LỰC VIỆT NAM-TRUNG TÂM HẠT NHÂN THÀNH PHỐ HỒ CHÍ MINH.
- Result: Lost
28/02/2024 14:32
KIM LONG CALIBRATION AND TECHNOLOGIES COMPANY LIMITED Won the bidding for the Calibration and validation of medical equipment and vaccine storage cabinets package, which was invited for bidding by the Trung tâm Y tế thị xã Sơn Tây through an as an independent entity.
- Result: Won
15/11/2021 14:19
KIM LONG CALIBRATION AND TECHNOLOGIES COMPANY LIMITED join for the Providing testing services for tools and equipment that are not on the list of strict management requirements in 2020 package, which was invited for bidding by the EVNGENCO 3 Power service company through an as sub-joint of CÔNG TY TNHH HIỆU CHUẨN VÀ CÔNG NGHỆ KIM LONG(0312055910 - CÔNG TY TNHH KIỂM ĐỊNH VÀ CÔNG NGHỆ 2,0312319137 - CÔNG TY TNHH HIỆU CHUẨN VÀ CÔNG NGHỆ KIM LONG). Three other contractors also participated.
- Result: Bid canceled
17/07/2020 14:02
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder KIM LONG CALIBRATION AND TECHNOLOGIES COMPANY LIMITED participated in 11 package, of which 8 package was won, failed 2 packages, 0 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KIM LONG CALIBRATION AND TECHNOLOGIES COMPANY LIMITED is related to 7 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KIM LONG CALIBRATION AND TECHNOLOGIES COMPANY LIMITED has a relationship with 8 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KIM LONG CALIBRATION AND TECHNOLOGIES COMPANY LIMITED competed with 19 contractors in 6 package, won 6 package, lost 0 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor KIM LONG CALIBRATION AND TECHNOLOGIES COMPANY LIMITED once entered into a partnership with 8 contractors in 5 package, won bid 2 package, lost 2 package, 0 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor KIM LONG CALIBRATION AND TECHNOLOGIES COMPANY LIMITED participated in bidding in 4 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor KIM LONG CALIBRATION AND TECHNOLOGIES COMPANY LIMITED participated in bidding in 4 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,208 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor