Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
10:51 PM 10/15/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
10:43 AM 11/30/2022 |
Active |
At the request of QTHT |
|
12:05 AM 01/04/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
10:32 AM 02/14/2023 |
Active |
At the request of QTHT |
|
2:28 AM 04/02/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
11:28 AM 06/25/2024 |
Active |
At the request of QTHT |
|
12:23 AM 07/01/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
11:32 AM 07/01/2024 |
Active |
At the request of QTHT |
|
1:21 AM 04/01/2025 |
Pause |
Temporarily suspended due to overdue fees |
Data analysis results of DauThau.info software for contractors LE BINH JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 18 bidding packages, of which 14 were won, 4 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 61.98% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 94.93% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đà Nẵng (10), Undefined (8)
- Provinces before the merger where the contractor has participated in bidding : Quảng Nam (10), Undefined (8)
- Has relationships with 7 Bid Solicitors
- Has relationships with 8 Bid Investors
- Has competed against 16 contractors in 12 bidding packages, won 10 packages, lost 2 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 3 contractors in 6 bidding packages, won 4 packages, lost 2 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 2 | 0% |
| Lower by 10% to 20% | 1 | 0% |
| Lower by 5% to 10% | 3 | 0% |
| Lower by 1% to 5% | 0 | |
| Lower by 0% to 1% | 5 | 0% |
| 0% | 2 | 0% |
| Higher by 0% to 1% | 0 | |
| Higher by 1% to 5% | 1 | 0% |
| Higher by 5% to 10% | 0 | |
| Higher by 10% or more | 0 | |
| Unknown | 0 | |
| Total | 14 | 100% |
LE BINH JOINT STOCK COMPANY Won the bidding for the Construction and installation of DTBD of Tra Linh - Mang Lung route package, which was invited for bidding by the Nam Tra My District the Construction Projects Management Board through an as sub-joint of Liên danh DTBD tuyến đường Trà Linh - Măng Lùng.
- Result: Won
16/04/2025 20:26
LE BINH JOINT STOCK COMPANY lost the bidding for the Civil Works package, which was invited for bidding by the Nam Tra My District the Construction Projects Management Board through an as sub-joint of Liên danh Gia Lộc Phát - Lê Bình.
- Result: Lost
03/02/2025 10:31
LE BINH JOINT STOCK COMPANY Won the bidding for the Regular maintenance of district roads package, which was invited for bidding by the Phòng Kinh tế, Hạ tầng và Đô thị huyện Hiệp Đức through an as sub-joint of Liên danh An Bảo – Lê Bình.
- Result: Won
24/01/2025 07:59
LE BINH JOINT STOCK COMPANY Won the bidding for the Civil Works package, which was invited for bidding by the Phòng Nông nghiệp và phát triển nông thôn huyện Nam Trà My through an as sub-joint of Liên danh Gia Lộc Phát - Lê Bình.
- Result: Won
15/08/2024 22:38
LE BINH JOINT STOCK COMPANY lost the bidding for the Civil Works package, which was invited for bidding by the PHÒNG DÂN TỘC HUYỆN NAM TRÀ MY through an as sub-joint of Liên danh Gia Lộc Phát - Lê Bình.
- Result: Lost
03/08/2024 11:11
LE BINH JOINT STOCK COMPANY Won the bidding for the Civil Works package, which was invited for bidding by the Phòng Kinh Tế và Hạ Tầng huyện Nam Trà My through an as sub-joint of Liên danh Gia Lộc Phát - Lê Bình.
- Result: Won
24/07/2024 08:33
LE BINH JOINT STOCK COMPANY Won the bidding for the Civil Works package, which was invited for bidding by the Nam Tra My District the Construction Projects Management Board through an as an independent entity.
- Result: Won
14/02/2023 15:49
LE BINH JOINT STOCK COMPANY Won the bidding for the Repairing Dak Ru Irrigation Complex, Hamlet 2, Tra Vinh Commune package, which was invited for bidding by the Phòng Nông nghiệp và phát triển nông thôn huyện Nam Trà My through an as an independent entity.
- Result: Won
11/01/2022 19:02
LE BINH JOINT STOCK COMPANY Won the bidding for the Repairing and overcoming rain and floods on Ong Bien's irrigation works, village 1, Tra Don commune package, which was invited for bidding by the Phòng Nông nghiệp và phát triển nông thôn huyện Nam Trà My through an as an independent entity.
- Result: Won
07/01/2022 21:51
LE BINH JOINT STOCK COMPANY Won the bidding for the Construction and installation works: Road to village 4 Tra Vinh package, which was invited for bidding by the Nam Tra My District the Construction Projects Management Board through an as an independent entity.
- Result: Won
13/09/2019 12:39
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder LE BINH JOINT STOCK COMPANY participated in 18 package, of which 14 package was won, failed 4 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor LE BINH JOINT STOCK COMPANY is related to 7 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor LE BINH JOINT STOCK COMPANY has a relationship with 11 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor LE BINH JOINT STOCK COMPANY competed with 16 contractors in 12 package, won 10 package, lost 2 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor LE BINH JOINT STOCK COMPANY once entered into a partnership with 3 contractors in 6 package, won bid 4 package, lost 2 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor LE BINH JOINT STOCK COMPANY participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor LE BINH JOINT STOCK COMPANY participated in bidding in 1 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,202 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor