Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
| Updated time | Active status | Lý do |
|---|---|---|
|
1:20 AM 10/16/2022 |
Pause |
Temporarily suspended due to overdue fees |
|
3:17 PM 12/12/2022 |
Active |
At the request of QTHT |
|
12:03 AM 01/03/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
12:27 AM 01/03/2023 |
Active |
At the request of QTHT |
|
8:52 AM 01/30/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
11:49 AM 01/30/2023 |
Active |
At the request of QTHT |
|
12:04 AM 03/24/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
10:59 AM 04/15/2023 |
Active |
At the request of QTHT |
|
12:10 AM 08/12/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
11:38 AM 08/12/2023 |
Active |
At the request of QTHT |
|
12:10 AM 08/15/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
11:49 AM 08/15/2023 |
Active |
At the request of QTHT |
|
12:06 AM 08/23/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
11:00 AM 09/08/2023 |
Active |
At the request of QTHT |
|
12:09 AM 09/28/2023 |
Pause |
Temporarily suspended due to overdue fees |
|
7:03 AM 11/12/2023 |
Active |
At the request of QTHT |
|
12:11 AM 07/01/2024 |
Pause |
Temporarily suspended due to overdue fees |
|
3:30 PM 04/03/2026 |
Active |
At the request of QTHT |
|
12:05 AM 04/21/2026 |
Pause |
Temporarily suspended due to overdue fees |
|
12:46 AM 04/21/2026 |
Active |
At the request of QTHT |
Data analysis results of DauThau.info software for contractors REEC JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 21 bidding packages, of which 1 were won, 17 were lost, 2 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 52.22% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 87.92% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Bắc Ninh (6), Phú Thọ (1), Hà Nội (6), Hải Phòng (2), Quảng Trị (1), Điện Biên (1), Tuyên Quang (1), Thái Nguyên (2), Đà Nẵng (1), TP.Hồ Chí Minh (1)
- Provinces before the merger where the contractor has participated in bidding : Bắc Giang (6), Phú Thọ (1), Hà Nội (6), Hải Dương (1), Quảng Trị (1), Điện Biên (1), Tuyên Quang (1), Thái Nguyên (2), Hải Phòng (1), Đà Nẵng (1)
- Has relationships with 15 Bid Solicitors
- Has relationships with 3 Bid Investors
- Has competed against 64 contractors in 15 bidding packages, won 1 packages, lost 11 packages, 2 are pending results, and 1 were canceled.
- Has collaborated with 1 contractors in 6 bidding packages, won 0 packages, lost 6 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 0 | |
| Lower by 10% to 20% | 1 | 0% |
| Lower by 5% to 10% | 0 | |
| Lower by 1% to 5% | 0 | |
| Lower by 0% to 1% | 0 | |
| 0% | 0 | |
| Higher by 0% to 1% | 0 | |
| Higher by 1% to 5% | 0 | |
| Higher by 5% to 10% | 0 | |
| Higher by 10% or more | 0 | |
| Unknown | 0 | |
| Total | 1 | 100% |
REEC JOINT STOCK COMPANY lost the bidding for the Supply and installation of 08 air conditioners package, which was invited for bidding by the VIETNAM AIRLINES ENGINEERING COMPANY LIMITED through an as master consortium of CÔNG TY CỔ PHẦN REEC HOLDINGS & CÔNG TY TNHH ĐẦU TƯ XÂY DỰNG & PHÁT TRIỂN VIỆT NHẬT. Five other contractors also participated.
- Result: Lost
09/04/2026 09:07
REEC JOINT STOCK COMPANY join for the Provide 01 forklift package, which was invited for bidding by the VIETNAM AIRLINES ENGINEERING COMPANY LIMITED through an as an independent entity. Three other contractors also participated.
06/04/2026 09:10
REEC JOINT STOCK COMPANY lost the bidding for the Package No. 4: Supply, installation, calibration and trial run of furnace bottom slag discharge system 1 package, which was invited for bidding by the SON DONG THERMAL POWER COMPANY-BRANCH OF VINACOMIN-POWER HOLDING CORPORATION through an as sub-joint of Liên danh VIETNHAT - REEC HOLDING. Eleven other contractors also participated.
- Result: Lost
08/12/2023 10:05
REEC JOINT STOCK COMPANY lost the bidding for the Procurement and installation of elevator system for 5-storey office building package, which was invited for bidding by the Trường Cao đẳng Công nghệ và Kinh tế Công nghiệp through an as an independent entity. Eight other contractors also participated.
- Result: Lost
12/09/2023 09:19
REEC JOINT STOCK COMPANY lost the bidding for the Supply and install elevator equipment package, which was invited for bidding by the Ban Quản lý dự án đầu tư xây dựng các công trình dân dụng và công nghiệp Đà Nẵng through an as sub-joint of VIETNHAT- REEC JV (Liên danh nhà thầu giữa Công ty TNHH Đầu tư Xây dựng & Phát triển Việt Nhật và Công ty Cổ phần REEC). Six other contractors also participated.
- Result: Lost
18/08/2023 09:03
REEC JOINT STOCK COMPANY lost the bidding for the Package XL-05: Supply and installation of elevators package, which was invited for bidding by the THANG LONG GTC JOINT STOCK COMPANY through an as an independent entity. Three other contractors also participated.
- Result: Lost
17/08/2023 09:35
REEC JOINT STOCK COMPANY lost the bidding for the Package No. 03: Installing a patient transport elevator at building C package, which was invited for bidding by the Bệnh viện Hữu nghị Việt Tiệp through an as an independent entity. Four other contractors also participated.
- Result: Lost
08/08/2023 15:04
REEC JOINT STOCK COMPANY lost the bidding for the Elevator carrying goods and people package, which was invited for bidding by the National Hospital of Obstetrics and Gynecology (NHOG) through an as an independent entity. Five other contractors also participated.
- Result: Lost
31/07/2023 10:07
REEC JOINT STOCK COMPANY lost the bidding for the Providing 20KVA UPS equipment and battery cabinets package, which was invited for bidding by the VIETNAM AIRLINES ENGINEERING COMPANY LIMITED through an as an independent entity. Eight other contractors also participated.
- Result: Lost
28/07/2023 10:38
REEC JOINT STOCK COMPANY lost the bidding for the Package No. 1: Supply, installation, test run and calibration of UPS system of unit 2 - Son Dong Thermal Power Plant. package, which was invited for bidding by the SON DONG THERMAL POWER COMPANY-BRANCH OF VINACOMIN-POWER HOLDING CORPORATION through an as sub-joint of VIETNHAT- REEC JV (Liên danh nhà thầu giữa Công ty TNHH Đầu tư Xây dựng & Phát triển Việt Nhật và Công ty Cổ phần REEC). Eleven other contractors also participated.
- Result: Lost
30/06/2023 10:08
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder REEC JOINT STOCK COMPANY participated in 21 package, of which 1 package was won, failed 17 packages, 2 packages with no results, 1 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor REEC JOINT STOCK COMPANY is related to 15 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor REEC JOINT STOCK COMPANY has a relationship with 16 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor REEC JOINT STOCK COMPANY competed with 64 contractors in 15 package, won 1 package, lost 11 package, 2 bidding package has no results, 1 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summarization: Contractor REEC JOINT STOCK COMPANY once entered into a partnership with 1 contractors in 6 package, won bid 0 package, lost 6 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full analysis please subscribe to the VIP3 package
Summary: Contractor REEC JOINT STOCK COMPANY participated in bidding in 10 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor REEC JOINT STOCK COMPANY participated in bidding in 10 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,201 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor