Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Thermal Power Project Management Boad No 2 as follows:
- Has relationships with 0 project owners.
- Has relationships with 10 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 10 contractor selection plans with a total of 61 bidding packages, of which 7 prequalification documents have not found the investment project.
- Has invited bids for 17 packages (with 17 tender notices), and conducted prequalification for 1 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 8 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 1 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 60 packages that have not fully posted the contractor selection results. Of these 60 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.00 contractors.
- Breakdown by bidding field: Goods 35.29%, Construction 17.65%, Consultancy 47.06%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 111,351,532,815 VND, of which the total winning bid value is: 62,367,698,294 VND.
- The savings rate is: 43.99%.
Data analysis results of DauThau.info software for bid solicitors Thermal Power Project Management Boad No 2 as follows:
- Has relationships with 10 contractor.
- The average number of contractors participating in each bidding package is: 2.00 contractors.
- Proportion of bidding fields: Goods 35.29%, Construction 17.65%, Consulting 47.06%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 111,351,532,815 VND, in which the total winning value is: 62,367,698,294 VND.
- The savings rate is: 43.99%.
This Bid solicitor is also an investor. The analysis results of data for the investor Thermal Power Project Management Boad No 2 are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 0 contractor selection plans, of which 0 were self-published, and 0 were published by other entities.
- Is the investor of 6 Tender Notices, of which 6 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Thermal Power Project Management Boad No 2 has posted the results of the bidding package Package No. 20 (TV11-CSHT+QT1): Consulting on bidding for EPC bidding package for coal import port and breakwater of the investor Thermal Power Project Management Boad No 2.
28/02/2019 15:17
Investor Thermal Power Project Management Boad No 2 has posted an investment and development project Quang Trach I . Thermal Power Plant Project.
24/04/2018 08:08
Investor Thermal Power Project Management Boad No 2 has posted an investment and development project Infrastructure Project of Quang Trach Power Center.
24/04/2018 07:07
The Bid solicitor Thermal Power Project Management Boad No 2 has posted the results of the bidding package Package No. 03 (XL01-CSHT+QT1): Ground leveling: Main factory, coal conveyor line, cooling water system from coal port to Quang Trach I main thermal power plant of the investor Thermal Power Project Management Boad No 2.
24/01/2018 09:38
The Bid solicitor Thermal Power Project Management Boad No 2 has posted the results of the bidding package 09 (TV07-Instrumentation): Surveying, preparing the technical plan, estimating and preparing the bidding documents for the electrical system items serving the construction of Quang Trach I thermal power plant of the investor Thermal Power Project Management Boad No 2.
04/12/2017 15:18
The Bid solicitor Thermal Power Project Management Boad No 2 has posted the results of the bidding package Package 3 (TV03-QT1) Bidding consultancy and contract negotiation support for EPC package of the investor Thermal Power Project Management Boad No 2.
- Winning bidder: Công ty cổ phần Tư vấn Xây dựng Điện 3
20/11/2017 14:36
The Bid solicitor Thermal Power Project Management Boad No 2 has posted the results of the bidding package Package No. 11 (TV09-CSHT) Surveying, preparing the technical plan, estimating and preparing the bidding documents for the item of Returned Sewerage Canal of the investor Thermal Power Project Management Boad No 2.
11/10/2017 11:49
Bid solicitor Thermal Power Project Management Boad No 2 has posted Tender Notice Tender package No 03 (XL01-CSHT+QT1): Ground leveling: Main factory, coal conveyor line, cooling water system from coal port to Quang Trach I main thermal power plant of the investor Thermal Power Project Management Boad No 2 with the form National competitive bidding.
08/10/2017 17:16
Bid solicitor Thermal Power Project Management Boad No 2 has posted Tender Notice 09 (TV07-Instrumentation): Surveying, preparing the technical plan, estimating and preparing the bidding documents for the electrical system items serving the construction of Quang Trach I thermal power plant of the investor Thermal Power Project Management Boad No 2 with the form National competitive bidding.
28/09/2017 14:25
Bid solicitor Thermal Power Project Management Boad No 2 has posted Tender Notice Tender package No 11 (TV09-CSHT) Surveying, preparing the technical plan, estimating and preparing the bidding documents for the item of Returned Sewerage Canal of the investor Thermal Power Project Management Boad No 2 with the form Open bidding (Only select domestic contractors).
28/08/2017 09:47
The data sheet has been partially hidden, to see the full information please Login or Register
Thermal Power Project Management Boad No 2 announced the results of the bid package Package No. 20 (TV11-CSHT+QT1): Consulting on bidding for EPC bidding package for coal import port and breakwater .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG CÔNG TRÌNH HÀNG HẢI
28/02/2019 15:17
Thermal Power Project Management Boad No 2 publishes the plan Plan for selecting contractors for phase 3 with 13 bidding package .
03/12/2018 20:50
Thermal Power Project Management Boad No 2 publishes Tender Notice Tender package No 20 (TV11-CSHT+QT1): Consulting on bidding for EPC bidding package for coal import port and breakwater in the form National competitive bidding .
13/11/2018 13:47
Thermal Power Project Management Boad No 2 publishes the plan Approval for adjustment of LCA, package No. 20 (TV11-CSHT) with 1 bidding package .
10/10/2018 08:31
Thermal Power Project Management Boad No 2 publishes the plan Adjusted contractor selection plan (phase 5) with 2 bidding package .
17/08/2018 09:05
Thermal Power Project Management Boad No 2 publishes the plan Plan for selecting contractors for phase 5 with 1 bidding package .
18/07/2018 13:54
Thermal Power Project Management Boad No 2 publishes the plan Plan for selecting contractors for phase 4 with 7 bidding package .
19/05/2018 15:27
Thermal Power Project Management Boad No 2 publishes the plan Plan for selecting contractors for phase 5 with 15 bidding package .
24/04/2018 13:47
Thermal Power Project Management Boad No 2 publishes the plan Quang Trach I . Thermal Power Plant Project with 10 bidding package .
27/02/2018 15:02
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Thermal Power Project Management Boad No 2 has posted the results of the bidding package Package No. 20 (TV11-CSHT+QT1): Consulting on bidding for EPC bidding package for coal import port and breakwater of the investor Thermal Power Project Management Boad No 2.
28/02/2019 15:17
Investor Thermal Power Project Management Boad No 2 has posted an investment and development project Quang Trach I . Thermal Power Plant Project.
24/04/2018 08:08
Investor Thermal Power Project Management Boad No 2 has posted an investment and development project Infrastructure Project of Quang Trach Power Center.
24/04/2018 07:07
The Bid solicitor Thermal Power Project Management Boad No 2 has posted the results of the bidding package Package No. 03 (XL01-CSHT+QT1): Ground leveling: Main factory, coal conveyor line, cooling water system from coal port to Quang Trach I main thermal power plant of the investor Thermal Power Project Management Boad No 2.
24/01/2018 09:38
The Bid solicitor Thermal Power Project Management Boad No 2 has posted the results of the bidding package 09 (TV07-Instrumentation): Surveying, preparing the technical plan, estimating and preparing the bidding documents for the electrical system items serving the construction of Quang Trach I thermal power plant of the investor Thermal Power Project Management Boad No 2.
04/12/2017 15:18
The Bid solicitor Thermal Power Project Management Boad No 2 has posted the results of the bidding package Package 3 (TV03-QT1) Bidding consultancy and contract negotiation support for EPC package of the investor Thermal Power Project Management Boad No 2.
- Winning bidder: Công ty cổ phần Tư vấn Xây dựng Điện 3
20/11/2017 14:36
The Bid solicitor Thermal Power Project Management Boad No 2 has posted the results of the bidding package Package No. 11 (TV09-CSHT) Surveying, preparing the technical plan, estimating and preparing the bidding documents for the item of Returned Sewerage Canal of the investor Thermal Power Project Management Boad No 2.
11/10/2017 11:49
Bid solicitor Thermal Power Project Management Boad No 2 has posted Tender Notice Tender package No 03 (XL01-CSHT+QT1): Ground leveling: Main factory, coal conveyor line, cooling water system from coal port to Quang Trach I main thermal power plant of the investor Thermal Power Project Management Boad No 2 with the form National competitive bidding.
08/10/2017 17:16
Bid solicitor Thermal Power Project Management Boad No 2 has posted Tender Notice 09 (TV07-Instrumentation): Surveying, preparing the technical plan, estimating and preparing the bidding documents for the electrical system items serving the construction of Quang Trach I thermal power plant of the investor Thermal Power Project Management Boad No 2 with the form National competitive bidding.
28/09/2017 14:25
Bid solicitor Thermal Power Project Management Boad No 2 has posted Tender Notice Tender package No 11 (TV09-CSHT) Surveying, preparing the technical plan, estimating and preparing the bidding documents for the item of Returned Sewerage Canal of the investor Thermal Power Project Management Boad No 2 with the form Open bidding (Only select domestic contractors).
28/08/2017 09:47
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Thermal Power Project Management Boad No 2 has posted 10 of the contractor selection plan, which contains 61 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Thermal Power Project Management Boad No 2 posted 1 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Thermal Power Project Management Boad No 2 has posted 17 Tender Notices in 17 bidding packages. Among these, -1 Tender Notices were self-invited, and 18 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Thermal Power Project Management Boad No 2 has posted 8 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 8 package, canceled the bid 0 package (among the bidding packages above).
- There are 1 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Thermal Power Project Management Boad No 2 has a relationship with 10 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects