Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
History of active status changes
Data analysis results of DauThau.info software for contractors VINTECH AUTOMATION JOINT STOCK COMPANY are as follows:
You need to Login or Sign up to view all informations.
- Participated in 8 bidding packages, of which 3 were won, 5 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 74.16% in the bidding package here (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 90.6% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Thanh Hoá (4), Hà Nội (1), Hưng Yên (2), Undefined (1)
- Provinces before the merger where the contractor has participated in bidding : Thanh Hoá (4), Hà Nội (1), Thái Bình (1), Undefined (2)
- Has relationships with 5 Bid Solicitors
- Has relationships with 5 Bid Investors
- Has competed against 22 contractors in 8 bidding packages, won 3 packages, lost 5 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Competitiveness | ??? |
| Enterprise scale | ??? |
| Violation history | ??? |
| Criteria | Value | National ranking |
|---|---|---|
| Total bid packages participated | ??? | ??? |
| Total bid packages won | ??? | ??? |
| Total bid packages failed | ??? | ??? |
| Total winning bidding revenue | ??? | ??? |
You need Login or Register to be able to see the chart of the value of contractor appointment packages and packages with IMP but no TBMT
| Grouping of packages by percentage difference between winning bid price and package price | Number of packages in each group | Percentage ratio of total packages |
|---|---|---|
| Lower by 20% or more | 1 | 0% |
| Lower by 10% to 20% | 0 | |
| Lower by 5% to 10% | 0 | |
| Lower by 1% to 5% | 1 | 0% |
| Lower by 0% to 1% | 1 | 0% |
| 0% | 0 | |
| Higher by 0% to 1% | 0 | |
| Higher by 1% to 5% | 0 | |
| Higher by 5% to 10% | 0 | |
| Higher by 10% or more | 0 | |
| Unknown | 0 | |
| Total | 3 | 100% |
VINTECH AUTOMATION JOINT STOCK COMPANY lost the bidding for the Procurement of goods to repair the gear box for limestone crusher B, FGD system - Thai Binh 2 Thermal Power Plant package, which was invited for bidding by the PETROVIETNAM POWER GENERATION BRANCH - VIETNAM OIL AND GAS GROUP through an as an independent entity. Two other contractors also participated.
- Result: Lost
12/02/2026 15:34
VINTECH AUTOMATION JOINT STOCK COMPANY lost the bidding for the PTV05-2024: Providing comprehensive inspection and evaluation services for 6.6 kV engines and maintenance of backup generator systems package, which was invited for bidding by the THAI BINH THERMAL POWER COMPANY through an as an independent entity. Two other contractors also participated.
- Result: Lost
21/06/2024 10:11
VINTECH AUTOMATION JOINT STOCK COMPANY lost the bidding for the Package #2: Purchase of materials, components, jack cables and computers package, which was invited for bidding by the Viện Tự động hóa Kỹ thuật Quân sự through an as an independent entity. One other contractors also participated.
- Result: Lost
25/05/2020 09:08
VINTECH AUTOMATION JOINT STOCK COMPANY Won the bidding for the Production and Business2020-HH18: Supplying materials for regular repair of electrical part 1 package, which was invited for bidding by the NGHI SON THERMAL POWER COMPANY through an as an independent entity. One other contractors also participated.
- Result: Won
23/04/2020 16:24
VINTECH AUTOMATION JOINT STOCK COMPANY lost the bidding for the SXKD2020-HH38: Provide mechanical tools for repair and maintenance in January 2020. package, which was invited for bidding by the NGHI SON THERMAL POWER COMPANY through an as an independent entity. Twelve other contractors also participated.
- Result: Lost
20/01/2020 14:02
VINTECH AUTOMATION JOINT STOCK COMPANY Won the bidding for the SXKD2019-HH75: Supplying materials for unexpected repair of electrical part package, which was invited for bidding by the NGHI SON THERMAL POWER COMPANY through an as an independent entity. One other contractors also participated.
- Result: Won
02/01/2020 13:32
VINTECH AUTOMATION JOINT STOCK COMPANY Won the bidding for the Procurement of materials and equipment for automatic control systems package, which was invited for bidding by the Công Ty Cổ Phần Trà Than Uyên through an as an independent entity.
- Result: Won
20/11/2019 16:22
VINTECH AUTOMATION JOINT STOCK COMPANY lost the bidding for the Production and Business2019-HH61: Procurement of materials and equipment for video conferencing systems package, which was invited for bidding by the NGHI SON THERMAL POWER COMPANY through an as an independent entity. Seven other contractors also participated.
- Result: Lost
11/10/2019 16:14
Contractor activities have been partially hidden, for full information please Login or Register
Summarization: Bidder VINTECH AUTOMATION JOINT STOCK COMPANY participated in 8 package, of which 3 package was won, failed 5 packages, 0 packages with no results, 0 packages canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VINTECH AUTOMATION JOINT STOCK COMPANY is related to 5 Bid solicitor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VINTECH AUTOMATION JOINT STOCK COMPANY has a relationship with 5 the investor. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VINTECH AUTOMATION JOINT STOCK COMPANY competed with 22 contractors in 8 package, won 3 package, lost 5 package, 0 bidding package has no results, 0 bidding package has been canceled. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VINTECH AUTOMATION JOINT STOCK COMPANY participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
Summary: Contractor VINTECH AUTOMATION JOINT STOCK COMPANY participated in bidding in 3 provinces/cities, 0 bid packages with nationwide implementation locations, 0 bid packages with implementation locations outside Vietnamese territory. The data table has been partially hidden, to see the full information please Login or Register
There are 71,054 contractor who have not participated in any bidding packages
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Add contractor